  • DFI
    Design and Installation of Gudrun Platform Jacket Piles

    By Gunhild Hennum, Tewodros Tefera, Gisle Håland, Annette Jahr

    "Abstract The Gudrun field is located west of Stavanger in the North Sea at water depth of 109 m. A jacket substructure was selected to support the topside and was installed in 2011. The jacket shall

    Jan 1, 2014

  • SME
    Gotthard-Base Tunnel, Section Faido Previous Experience With The Use Of The TBM

    By Martin Herrenknecht

    After the successful breakthrough at the end of 2006 of both TBMs into the multifunctional site Faido (MFS), in the middle of 2007 the two tunnel boring machines resumed the 12 km long section between

  • AUSIMM
    Cave Tracker Flow Monitoring System Installation at Argyle Diamond Mine

    By M Wilson, D Whiteman, P Kuiper, S Talu, G Watt, A van As

    Once the draw process has begun in a block cave, it is very difficult to identify which regions of the cave have successfully propagated, where the caved material is flowing from and where it is flowi

    May 9, 2016

  • SME
    Web Enabled Industrial Desktop To Increase Overall Process Effectiveness In Metallurgical Plants

    By J. P. Kennedy, O. A. Bascur

    Large metallurgical complexes have more data than a small city and these data change as internal and external conditions evolve. Staffing turnover hinders experienced-based decisions especially with

    Jan 1, 2002

  • CIM
    Copper Scrap Marketing

    By Paul B. Warrington

    This paper presents a discussion of the factors affecting copper scrap markets, including such items as price levels, freight. grades of material, sources and packaging. Reference will also be made to

    Jan 1, 1977

  • CIM
    Medium voltage switchgear and circuit breaker life extension

    By K. J. Boser

    "Medium Voltage (MV) metal clad switchgear is referred to as the voltage class from 2.4 kV to 38 kV. Technological advances in circuit breaker designs over the last 20 years have given rise to retrofi

    Jan 1, 1998

  • CIM
    Evaluation of the Performance of a CIP Gold Recovery Process

    By M. Courchesne, C. Barbery, D. Hodouin, C. Carrier

    "The carbon-in-pulp process for recovery of gold dissolved in dilute cyanide solutions, in the presence of solids, has now replaced the convedntional processes of pregnant liquid/barren solids separat

    Jan 1, 1987

  • SME
    Drilled Shaft Construction At Crownpoint, New Mexico

    By Hassell E. Hunter

    The Wyoming Mineral-Conoco Crownpoint Project represents the first time that big hole drilling has been exclusively used to develop totally a privately financed mine below a depth of 1000 feet. Thr

    Jan 1, 1983

  • AUSIMM
    Review of the Geology of the Southern Coalfield, N.S.W.

    By Probert D. H, Wright E. A, Taylor B. L

    A general description of the geology of the Southern Coalfield is given. The relationship between the Illawarra Coal Measures, the overlying Triassic and the underlying Upper Marine Series, of Permian

    Jan 1, 1958

  • AUSIMM
    The Tolukuma Gold Silver-Vein System, Papua New Guinea

    By G J. Corbett, T M. Leach

    A continued exploration programme has further defined the geology of the Tolukuma vein system, verified the resource indicated by Newmont, and identified potential for additional mineralisation. The r

    Jan 1, 1995

  • SME-ICGCM
    A Survey of the Current Rib Support Practices and Techniques in U.S. Coal Mines

    By Khaled M. Mohamed, Michael M. Murphy, Ted M. Klemetti, Heather E. Lawson

    "The design of rib support systems in U.S. coal mines is based primarily on local practices and experience. A better understanding of current rib support practices in U.S. coal mines is crucial for de

    Jan 1, 2015

  • NIOSH
    OFR-49(1)-79 Construction, Inspection And Maintenance Of Mine Haulage Track, Volume I

    By Edward G. Cunney

    [Track in underground bituminous coal mines was investigated and technology has taken from other industries in order to Main information on conditions that impair the safety and efficiency of the trac

    Jan 1, 1977

  • TMS
    Effect Of Sinter Basicity On Sinter Productivity And Quality With High Rate Of Recycled Materials

    By Mingming Zhang, Marshall S. Coe, Marcelo W. Andrade

    To supply iron units and flux burden in blast furnaces, sinter basicity is one of the vital parameters for sinter plants. The sinter basicity also plays an important role in sinter quality since it im

    Jan 1, 2015

  • NIOSH
    RI 5435 The International Systems Of Hard-Coal :Classification And Their Application To American Coals ? Introduction And Summary

    By W. H. Ode

    In 1949 the Coal Committee of the Economic Commission for Europe, Geneva, Switzerland, established a Classification Working Party, to develop an international system for classifying coal. This project

    Jan 1, 1958

  • SME
    Cost Estimating Standards For International Reporting Of Ore Reserves: What Are They? What Should They Be?

    By O. Schumacher

    Guidelines for publication of information defining the amount and grade of resource material available in a deposit are well established in Australasia?s JORC Guidelines, Canada?s National Instrument

    Feb 27, 2013

  • SME
    Site Investigations And Geotechnical Assessment For The Construction Of The Deep Underground Science And Engineering Laboratory At The Former Homestake Mine

    By Z. J. Hladysz

    A Deep Underground Science and Engineering Laboratory (DUSEL) is being planned at the site of the former Homestake Gold Mine in Lead, South Dakota, under the sponsorship of the National Science Founda

    Jan 1, 2011

  • CIM
    Expansion and Progress of Electrical Prospecting

    By H. Lundberg

    Introduction The world has been suffering from an excessive production of all kinds of raw materials, and the metals and petroleum are no exception. As a consequence, at the moment, the urge to find

    Jan 1, 1931

  • SME
    Floodplain Aggregate Mining In Western Oregon (2ca5f679-fd59-4011-96c0-926073fa7dc9)

    By E. F. Schnitzer, S. R. Mamoyac, P. J. Wampler

    During 1996 and 1997, Oregon experienced flooding on a scale not seen in many years. Some gravel pits located near rivers experienced erosion and, in several cases, breaches between the gravel pit an

    Jan 1, 1999

  • AUSIMM
    An Application of Linear Programming for Block Cave Draw Control

    By A von Johannides, G J. van Hout, L F

    In the past various systems have been used to plan the extraction of ore from block cave operations. These systems have varied from rather sophisticated models with empirical ægravity flowÆ rules appl

    Jan 1, 2000

  • DFI
    Some Experience With Large Diameter Caissons ? Synopsis

    By I. H. Wong

    The large diameter caisson foundations and their construction methods for three 50 to 60 storey high buildings in Singapore are described. The caissons are 5 m to 8 m in diameter and 40 m to 100 m dee