    A Computer Simulation Of Breakage Of The Main Roof In Longwall Mining

    By Deren Zhu

    Based on the results of field observation and physical model analyses, a computer simulation method, FEAEBP, has been developed for simulating the breakage of the main roof by considering it as a Kirc

    Jan 1, 1988

  • SME-ICGCM
    The Use Of Geologic Modeling In The Prediction Of Adverse Roof Conditions

    By Edward S. Custer

    Recent investigations of mine roof falls have demonstrated that roof failures are generally associated with geologic conditions. The roof falls can be predicted by using the techniques of depositional

    Jan 1, 1981

  • SME-ICGCM
    Analysis of Seismic Source Parameters of Roof Falls in Time and Space for Assessing Strata Stability by Microseismic Technique at Rajendra Longwall Coal Mine in India: A Case Study

    By C. Srinivasan

    Microseismic emissions are generated by deformation and cracking of rock around an opening inside a mine. The rock tends to achieve equilibrium in a new geometry under changing stress conditions was f

    Jan 1, 2005

  • SME-ICGCM
    Deformation Mechanism and Floor Heave Control Technology in Deep? Buried Full Seam Chamber

    By Xicai Gao

    With the intensification and expansion of deep coal mining, the surrounding rock stress environment becomes further deteriorated because of the complicated geological environment and powerful mining e

    Jan 1, 2013

  • SME-ICGCM
    Mitigation of a Massive Sandstone Channel's Impact on a 1,500 Ft Wide Longwall Face

    By Daniel W. Su

    This paper presents the implementation and evaluation of the hydraulic fracturing technique and Longwall Visual Analysis (LVA) software to mitigate the impact of a 1,000-ft (305-meter) widemassive san

    Jan 1, 2012

  • SME-ICGCM
    Three Dimensional Modeling of a Surface Displacements As a Result of an Underground Longwall Panel Extraction

    By Anton Sroka, Antoni Tajdus, Axel Preusse, Krzysztof Tajdus

    "In Europe, the magnitude and range of mining deformation predicted on the surface have been, in most cases, determined using methods based on Gauss' influence function (e.g., Knothe's theory, Ruhrkoh

    Jan 1, 2010

  • SME-ICGCM
    A Case Study for Multiple Seam Calibration of LaModel in Bump Prone Ground

    By Kevin W. Harris

    Multiple-seam coal mining is a major issue in underground coal mining that adds additional complexity to the practice of ground control. As reserve exploitation is driven by economics, it is now dif

    Jan 1, 2014

  • SME-ICGCM
    Roof Monitoring In Limestone Mines-Experience With The Roof Monitoring Safety System (RMSS)

    By Thomas E. Marshall

    During the past few years, the Pittsburgh Research Laboratory of the National Institute for Occupational Safety and Health (NIOSH) examined and characterized conditions at a majority of the undergroun

    Jan 1, 2000

  • SME-ICGCM
    Evaluation of Pillar Recovery in Southern West Virginia (0e64fb3d-0c07-4638-b455-a16004535ca1)

    By Chris Mark

    Pillar recovery continues to be a significant ground control hazard. During the past decade, 10 miners were killed during pillar extraction operations in southern West Virginia. Studies conducted duri

    Jan 1, 2002

  • SME-ICGCM
    A Case History Investigation of Two Coal Bumps in the Southern Appalachian Coalfield

    By David Newman

    The Southern Appalachian coalfield has a long history of coal bumps that are attributable to a unique combination of topography, geology, and multiple seam mining. The high pillar stresses that genera

    Jan 1, 2002

  • SME-ICGCM
    An Engineering Analysis Of "Squeeze" Failure Of Pillars In The Pittsburgh Coal Bed

    By George Mishra

    In mid-1979, J&L Steel Corporation experienced rapid failure of pillars after only two weeks' operation with a combination of full retreat and partial mining in the 154 Road Section of its Nemaco

    Jan 1, 1981

  • SME-ICGCM
    Estimation Of In-Situ Stress At Ikeshima Colliery Using AE And DRA Method

    By Hideki Shimada

    A low cost methodology that allows the determination of in- situ stress using oriented core specimens has been investigated. The technique can be used to determine the stresses during the early stages

    Jan 1, 2001

  • SME-ICGCM
    The Influence Of Geomining Parameters Over Stress Distribution In And Around Depillaring Faces

    By Rajendra Singh

    In India, pillar mining is contributing more than 90% of underground production which involves extraction of a part of coal from bords with pillars around as natural support in the development stage.

    Jan 1, 1990

  • SME-ICGCM
    Application Of Tailing Sand And Water As Backfill Material In Metal Mines (1992)

    By Sun Henghu

    This paper analyses problems associated with cement based technique in metal mines, and provides a new mining technique of packing the tailing sand and water into solidified material. In the new techn

    Jan 1, 1992

  • SME-ICGCM
    Three-Dimensional Simulations Of The Roof Behavior In Coal Room And Pillar Panels

    By Andre Vervoort

    The roof in coal room and pillar panels is normally stratified and can be thought of as beams or plates supported by the pillar sides in the roadways and by pillar corners in the intersections Undergr

    Jan 1, 2000

  • SME-ICGCM
    A Retrospective Assessment of Ground Control Research and Applications in the Coal Industry

    By Daniel W. H. Su

    This paper presents a retrospective assessment of ground control research and its successful application by CONSOL Energy over the past 25 years. Recognizing the need to improve the understanding of c

    Jan 1, 2011

  • SME-ICGCM
    A Step Towards Understanding The Behaviour Of Wider Roadways In South African Collieries

    By George B. Quaye

    Conventionally, roadways in South African collieries are 6 to 7 m wide. This dimension is chosen so as to allow maneuvrability of appropriate mine machinery and equipment, to meet production requireme

    Jan 1, 2001

  • SME-ICGCM
    Staubbekampfung An Schildausbau In Bruchbaustreben (Combating Dust On Shield Supports On Longwall Mining)

    By Wilfried Ufer

    [1. Einführung in die Problematik 1.1 Die Bedeutung des Schildausbaus Seit fast 30 Jahren ist die Konkurrenzsituation auf dem Primärenergiemarkt der Bundesrepublik Deutschland durch einen von Erdöl

    Jan 1, 1984

  • SME-ICGCM
    A Study on Geotechnical Risks in Interaction Between Open-Pit and Block Caving

    By Ezzeddin Bakhtavar

    There are several geotechnical challenges and risks inherent in the interaction between the open-pit and block cave mining environments. This is especially true when they have to work simultaneously f

    Jan 1, 2011

  • SME-ICGCM
    Utilization of Ground-Penetrating Radar to Determine Roof Competency in Underground Limestone Mines

    By Tim Ross

    J. M. Huber Corporation's Quincey Mine. an underground limestone mine located near Quincy. Illinois, has operated successfully and safely for many years utilizing roof bolts on a very limited bas

    Jan 1, 2002