Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Analysis of the Hydro-fracture Potential Around Water Tunnels in RockBy Emad Iskander
The seepage forces generated around pressurized water tunnels in rock are investigated using the analysis tools of geomechanics. The theoretical background of the two-phase material behavior is explai
Jan 1, 2008
-
Risk Management In Action—Controlling Difficult Ground By InnovationBy A. Moergeli
The Swiss are building the world’s longest tunnel, the 57-Kilometer (35-mile) long Gotthard Base Tunnel. Lot 252, Tunnel Amsteg: Two Hard Rock Tunnel Boring Machines (TBM) crossed hydro-thermally deco
Jan 1, 2007
-
The Coronado Traffic Diversion TunnelBy Jon Y. Kaneshiro, Ed Walton, Stephen J. Navin, Robert M. Sergeant, Storer J. Boone
The Coronado Traffic Tunnel is a proposed two-lane, reversible, road tunnel, which will relieve severe peak hour congestion problems on surface streets. The tunnel will take traffic from the Coronado
Jan 1, 2001
-
Alberta Lake Re-Established After Draining to Mine CoalBy Sukru Sumer
East Pit Lake is an artificially created lake that resulted from the remediation and reclamation of surface coal mining operations at TransAlta Utilities' Whitewood Mine in the Wabamun area west
Jan 1, 1995
-
Tunneling?Pipe Jacking of Large Diameter Pipes in O?Hare International AirportBy Mohammad Djavid
The one-pass tunneling pipe jacking method has often been the most schedule and cost efficient method for the pipe line installation. The main challenges in jacking pipes larger than 108 inches and fo
Jan 1, 2008
-
Study Of Stability Of Mercury And Silver Polythiocarbonate Nanofilms Generated During Optimized Mercury Removal From Cyanidation Pregnant EluateBy C. Bucknam, M. McComb
Mercury and silver polythiocarbonate sludge that was generated from the pilot testing of optimized mercury removal from cyanidation pregnant eluate solutions prior to Merrill-Crowe recovery of gold an
Jan 1, 2007
-
Estimation Of Roof Strata Strength In Mine Roof Geology Information System (MRGIS)By D. X. Tang, G. Wilson, S. S. Peng
Design and implementation of a roof bolting plan requires reliable geotechnical information of strata, such as rock strength, and locations of interfaces and voids/fractures. The drilling parameters o
Jan 1, 2006
-
Selection, Design, And Procurement Of North America?s Largest Mixshield TBM For Portland, Oregon?s East Side Cso TunnelBy Christof Metzger
This paper discusses the process utilized by the Kiewit?Bilfiger Berger Joint Venture (Contractor) to select, design, and procure the largest mixshield tunnel boring machine (TBM) ever implemented in
-
Surface and Hybrid Mining: Aqueous Extraction MethodsBy W. J. Schitt
Section 15 covers a loose collection of topics that involve water in some way. The chapters in this section include Dredge and Placer Mining (Chapter 15.1), Solution Mining: Surface Techniques (Chapte
Jan 1, 2008
-
Pipelining Bulk MineralsBy James M. Link
The first rule of mineral deposits always seems to be: the deposit is never close to the market. With gems and precious metals, this is not much of a problem. But with most of the mineral commodities
Jan 10, 1982
-
Planning and Fast Track Tunnel Design in Historical Downtown CharlestonBy James McKelvey, Larry Drolet, Jason Swartz
INTRODUCTION When divers discovered that sections of a tunnel housing the pipeline that conveys wastewater from the Charleston Peninsula to the Plum Island Wastewater Treatment Facility had caved
Jan 1, 2005
-
Kennecott's Copperton Concentrator Fourth Line Expansion, Plant Performance to Date., and Ongoing Continuous Improvement ProjectsBy D. S. Bird
The Kennecott Utah Copper Modernization Project, initiated in 1986, was directed to provide an expansion and modernization of mining and process facilities at the property's Bingham Canyon Mine a
Jan 1, 1995
-
NIOSH Extramural Research Funding: Fulfilling the Mandate of the MINER ActBy J. F. Burr, D. P. Snyder, G. W. Luxbacher
"The Mine Improvement and New Emergency Response Act (MINER Act) of 2006 (PL 109-236, 2006) established the Office of Mine Safety and Health, functioning as the Office of Mine Safety and Health Resear
Jan 10, 2018
-
Estimation Of Capital And Operation Costs Of Backhoe LoadersBy B. Oraee
Accurate estimation of equipment costs is a key factor in feasibility study and evaluation of design alternatives of mining projects. In this paper, capital and operation costs of backhoe loaders are
Jan 1, 2011
-
TBM Excavability: Prediction and Machine–Rock InteractionBy Z. T. Bieniawski, José Miguel Galera, Benjamín Celada
TBM case histories from over 400 tunnel sections are analyzed presenting a comprehensive application of the Rock Mass Excavability (RME) index (Bieniawski et al.2006). The paper introduces two new adj
Jan 1, 2007
-
Size Preparation Of Coal For Synthetic Fuel ProcessesBy J. P. Matoney
In recent years, the diminishing supply of natural gas has led energy suppliers and consumers to consider making synthetic natural gas from coal. A number of processes have been devised to produce gas
Jan 1, 1977
-
Uncertainty Estimates for Geometallurgical ModelsBy Mario E. Rossi
Often geometallurgical models are prepared at various project stages from very few data and are assumed to be representative of very large tonnages. These may include recovery models; crushing and gri
Jun 25, 2023
-
Construction of the Newell Creek Dam Inlet/Outlet Replacement Project - RETC2021By David Chastka, Isidro Rivera, Shawna Von Stockhausen, Idit Zarchi
The City of Santa Cruz Water Department is replacing the existing Newell Creek Dam inlet/outlet works at Loch Lomond Reservoir in the San Lorenzo Valley. The project will improve the City’s overall op
Jun 13, 2021
-
Factors Affecting The Location Of The Neutral Point In Ventilation SystemsBy J. M. Wempen
Booster fans in underground coal mines are often located using the concept of a neutral point. Normally, intake airways are maintained at higher absolute pressure than return airways; therefore, air l
Jan 1, 2012
-
Widening Uncertainties in the Utility Fuel Outlook – Preprint 97-21By J. B. Platt
Many utility fuel choices 1990-95 defied expectations, with utility decisions and coal market developments ever more closely linked. The Central Appalachian coal boom never occurred; clean-enough coal
Feb 24, 1997