    Electronic Detonator Timing Approaches for Surface Quarries and Metals Mines

    By Tristan Worsey, Nathan Rouse, Evan Thibaud

    Electronic detonators allow for variability and accuracy with blast delay selection and timing sequence. However, a single published guideline for selection of electronic timing delays is not availabl

    Jan 21, 2025

  • ISEE
    Challenges and Lessons Learned from the Kentucky Lock Project

    By K. Best, D. Conn

    The US Army Corps of Engineers KY Lock Project in western Kentucky presented the blasters and vibration consultants with a set of unique challenges. The blasters on this project were faced with diffic

    Jan 1, 2024

  • ISEE
    Performing decking with the use of an inflatable plug in high or total submergence applications in blastholes to improve final wall profile & stability

    By Glenn Tobin

    The overarching goal in modern drill and blasting operations is that of optimising mining operations to achieve higher levels of productivity, safety, profitability and sustainability. Air decking, a

    Jan 1, 2012

  • ISEE
    Implementation of a Real Time Traceability System from Mine to Plant

    By R. Ticona, J. Alarcon

    In the continuous search to provide comprehensive solutions and identify opportunities to improve ore traceability, from the blastholes to mill feed, different ore traceability systems have been devel

    Jan 1, 2024

  • ISEE
    New Methodology for Calculating Dynamic Pressure

    By Jorge Cárdenas, José Luis Hurtado

    The critical distance determination test through direct recording for the mine in Phase 03 was carried out in January 2024, and in it the vibration and pressure models were obtained for the Sedimentar

    Jan 21, 2025

  • ISEE
    Full-Scale Trials Involving the Open Detonation of Large Bombs Close to Structures.

    By Ambrose Buchanan, Rob Farnfield, Charles Adcock

    Beginning on 7th September 1940 the City of London was subjected to 57 consecutive days of bombing in what became known as the ‘London Blitz’. To commemorate the 70th anniversary of this event a telev

    Jan 1, 2011

  • ISEE
    SmokeFCM: Segmentation of Quarry Blast Smoke Plumes using Self-Adaptive Weighted Fuzzy C-Means

    By E. Lentilucci, A. Dey, X. Liu, A. Datta, S. Ghosh

    The segmentation of quarry blast smoke plumes is a crucial research area that has the potential to enhance safety, environmental monitoring, object detection, and regulatory compliance in the mining i

    Jan 1, 2024

  • ISEE
    Blasting Conditions Couldn't be Worse

    By John Atkinson, Steve Repola

    This paper will describe two blasting plans that have been developed for American Aggregates' Marble Cliff Quarry located near Columbus, Ohio. Two different limestone formations are mined on different

    Jan 1, 1993

  • ISEE
    Damage Development in Small Blocks

    By C. Pelley, S. Kelebek, G. Kunzel, P. Katsabanis

    Small blocks of granodiorite have been subjected to blast loads from a single borehole and from a series of boreholes detonating at various timing intervals. The damage of the blocks was assessed thro

    Jan 1, 2003

  • ISEE
    The Effects of Various Wet-Hole Loading Methods on Powder Factor

    By Neal Lee

    Often the effects of wet boreholes are not taken into consideration when designing a blasting program to exhibit a certain amount of explosive energy per unit of rock such as design by powder factor,

    Jan 1, 2011

  • ISEE
    Factors Governing the Muck Pile Characteristics

    By David Cheung, S. Paul Singh

    "The characteristics of a blasted muck pile can have a significant effect on the productivity and economyof loading and hauling operations. Poorly fragmented and tight muck piles, caused by insufficie

    Jan 1, 2017

  • ISEE
    Application of the Selective Loading to the Rock Mass Characterized through Drill Monitoring for Autonomous and Manual Drilling Mode to Optimize Blasting Results in Open Pit Operations

    By Jorge Blázquez, Pablo Ravanal, Paulo Couceiro, Juan Navarro

    Blasting performance is influenced by rock mass properties and blast design parameters. From them, the rock is the only variable that cannot be modified, but it can be measured, so that, blast design

    Feb 6, 2023

  • ISEE
    Advanced Blasting Optimization for Enhanced Productivity: The X-2Mill Solution

    By Jorge Blázquez, Paulo Couceiro, Patricio Vergara, Luis Martínez, Juan Navarro

    This study introduces the X-2Mill solution, a refined two-step methodology aimed at optimizing blast designs by aligning explosive energy with rock properties. The approach employs the X-4Traits Model

    Jan 21, 2025

  • ISEE
    Explosive Operations for Constructing a Tunnel Based PCB Collection System

    By Gerard McAlinden, Daniel Frost, Patrick McAlinden, James McAlinden

    In an effort to recover Polychlorinated biphenyls (PCB’s) that had leached into bedrock below the Hudson River in Upstate New York, a shaft and tunnel complex was designed that would allow installatio

    Jan 1, 2010

  • ISEE
    Modeling Reactive Sulfide Rock at the Red Dog Mine

    By Norman Paley, Zachary Pickett

    The Red Dog Mine is a high-grade zinc-lead mine located in northwest Alaska which began operations in November 1989. In June 2014 the upper half of a charge in a trim shot in the Aqqaluk pit deflagrat

    Feb 1, 2020

  • ISEE
    A Comparative Study Of Ppv Analysis Of Tunnel Rounds Using Both Non Electric And Programmable Electronic Detonation

    By Andrew Wetherelt

    Blast vibrations are of paramount importance in a society where ever increasing development is putting more stringent requirements on their control. Increasing civil development and more complex extra

    Jan 1, 2007

  • ISEE
    Effect of Impact on Pre-Squibbed Fireworks

    By Paul Worsey, Yasutaka Dote

    The choreography of large fireworks displays dictates electric initiation for precise timing. It has been common practice to pre-squib products before transportation for reducing set up time. A number

    Jan 1, 2009

  • ISEE
    The Effect of Available Energy on Blast Design

    By Lyall Workman, P D. Katsabanis

    Energy released by the explosive is typically partitioned in brisance, heave and losses. The fact that energy released in the P-V expansion curve below a certain point is lost has resulted in the conc

    Jan 1, 1998

  • ISEE
    Using Artificial Intelligence and 3D Imaging to Provide Real-time Particle Size Analysis on Haul Trucks

    By Saeed Karimifard, Saman Nouranian, Shahram Tafazoli, Bahram Sameti, Frank Chu, Caitlin McKinnon, Tetiana Konstantynivska, Glen Turner

    Continuing blast optimization is the cornerstone of any mine-to-mill approach, and particle size analysis is a key metric for meeting blast targets to reduce overall energy consumption and operating c

  • ISEE
    Iron Ore Company of Canada (IOCC) Blast Optimization with Emulsion Explosives

    By M Lemieux, R Mason

    The SABREX blast modeling program was introduced to I.O.C.C.'s Carol Lake Iron Ore Project in December 1987. As part of CIL's Technical Services, SABREX was used to implement an optimization program d