Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    East Boston Branch Sewer Relief Project: Support of Excavation Case Study (FULL Project)

    By Eric P. Bregman, Franklin M. Grynkewicz, John E. Regan

    "As part of an on-going effort to improve water quality and reduce discharge into Boston Harbor, the Massachusetts Water Resources Authority (MWRA) East Boston Branch Sewer Relief Project was designed

    Jan 1, 2017

  • DFI
    Removal of the Former San Francisco-Oakland Bay Bridge Foundation Caisson E3 by Mechanical Means and Explosives

    By Michael Gebman, Jack Gerwick

    "With the opening of the new San Francisco-Oakland Bay Bridge East Span, the former bridge and its caisson foundations are being demolished. Caisson foundations are in the path of a future shipping ch

    Jan 1, 2016

  • DFI
    Case Study: Stability Analysis for an Existing Bridge Experiencing Riverbank Erosion

    By Brandon Smith, William Bohlen

    Riverbank erosion along the Brazos River has modified the structural support conditions for an existing bridge structure in Southeast Texas. The 8-span, 1,200-foot long bridge was completed in 1992 al

    Jan 1, 2019

  • DFI
    Behavior of Instrumented Deep Anchored and Strutted Diaphragm Wall in Soft Rock

    By Amr Al Degwe, Walid Jaber

    "INTRODUCTIONNSCC International Ltd. carried out the enabling works and constructed the foundation system for the Emirates Pearl Tower and Bab El Qasr Hotel in Abu Dhabi. Emirates Pearl Tower is a joi

    Jan 1, 2017

  • DFI
    Quality Assessment of Seismic Data Sets and the Impact on Interval Velocity Estimates in DST

    By Gerald Verbeek, Erick Baziw

    "Downhole Seismic Testing (DST) is an important geotechnical testing technique for site characterization as it provides low strain (<10-5) in-situ interval compression (Vp) and shear (Vs) wave velocit

    Jan 1, 2017

  • DFI
    Vertical Load Test on a Drilled Shaft Installed in Glacially Derived Sediments

    By Robert C. Simpson, Ghada S. Ellithy

    "There are several methods for estimating the axial capacity of drilled shafts installed in coarse-grained soils. Most methods estimate the ultimate capacity for side friction and tip resistance. Desi

    Jan 1, 2015

  • DFI
    Harry Nice Bridge Geotechnical Instrumentation Case Study

    By Jeffrey Goodwin P. E., Melih Demirkan Ph. D. P. E., Kevin Tehansky P. E.

    Just an hour drive down MD 301 from National Harbor, construction to replace the Governor Harry W. Nice Memorial/Senator Thomas ‘Mac’ Middleton Bridge (HNB) began in spring of 2020. The Maryland Trans

    Oct 1, 2022

  • DFI
    Capacity of Hydraulically Jacked Piles

    By Howard A. Perko, Melinda J. Hummel

    "Hydraulically jacked piles, herein referred to as jacked piles, are commonly used for underpinning existing structures to arrest settlement or augment an existing foundation for higher loads. They co

    Jan 1, 2017

  • DFI
    Design And Construction Of Underground Basin Using Composite Slurry Wall 500 Feet Away From The Pacific Ocean

    By Ihab Allam PE, Meeok Kim. PE. Ph. D

    The wet weather equalization basin (EB) planned for Pacifica, CA is a 45 feet deep rectangular shaped underground water tank containing over 2.1 million gallons of water, and located only 500 feet awa

  • DFI
    Innovative Driven Pile Solution for the Rhode Island Route 6/10 Interchange Project

    By Seth H. Hamblin, Leo J. Hart, John E. Regan

    The Route 6 /10 10 Interchange Design/Build project, located in Providence, Rhode Island, involves the design and construction of five (5) new elevated bridge structures to replace and reconfigure the

    Jan 1, 2019

  • DFI
    Optimizing Large Diameter Concrete Piles in Tidewater Virginia

    By Michael G. Batten, Brian D. Keaney

    ]The Virginia Department of Transportation (VDOT) and the harbors on the James River routinely use precast concrete piles founded in the Yorktown formation to support bridges and other coastal structu

    Sep 8, 2021

  • DFI
    Load Testing Methods

    This Section describes four alternative methods for load testing of drilled shafts: high strain dynamic test (HSDT), rapid load test, static load test, and bottom load test. Until recently, static loa

    Jan 1, 2004

  • DFI
    Analysis and Case Study for Minimizing Differential Settlements in Piled Raft Foundations

    By Yu Chuang, Zai Jinmin, Liu Songyu

    "The piled raft foundation is a geotechnical composite construction method, consisting of three elements, piles, raft and soils, which is applied for the foundation in an increasing number. Differenti

    Jan 1, 2005

  • DFI
    Performance of Large-Diameter Bored Pile Socketed In Sandstone and Siltstone in Thailand

    By Zaw Zaw Aye, Sereyroath Chea, Nutthapon Thasnanipan, Thayanan Boonyarak

    "As there are only limited numbers of bored pile constructed in sandstone and siltstone in Thailand, load transfer and settlement behavior of a pile in these rocks are still not fully understood. Majo

    Jan 1, 1900

  • DFI
    Experimental Study on Lateral Capacity of Single Pile Embedded in Cement-Treated Sand

    By Takeshi Maki, Kh. Adeel Tariq

    "The lateral resistance of the structure plays an important role during seismic event and it can be increased by using ground improvement. In this study an attempt has been made to investigate the eff

    Jan 1, 2017

  • DFI
    Bertha Rescue Shaft – SR99 Tunnel

    By Lance Rasband, Richard Hanke

    "Seattle Tunnel Partners (STP) started mining on Seattle’s SR99 tunnel on July 30, 2013, working slowly through a 15 ft (4.6 m) thick fiber-reinforced concrete headwall. Once through the headwall, the

    Jan 1, 2015

  • DFI
    Analysis of Three Axial Load Tests on Large Bored Grouted Deep Foundations

    By Hayel M. El-Naggar, Marawan M. Shahien

    "Large capacity piles are important type of foundation elements that are needed in case of high column loads such as in tall buildings with large span between columns. In many projects, especially if

    Jan 1, 2017

  • DFI
    The Deep Cut-Off at the Walter F. George Dam

    "TREVIICOS CorporationINTRODUCTIONThe Walter F. George lock and dam was constructed on the Chattahoochee River between 1955 and 1963 with the double function of improving navigation and generating pow

    Jan 1, 2014

  • DFI
    Estimation & Comparison Of Axial Compression Capacity Of Bored Cast In-Situ Piles As Per Indian And International Standards

    By Sowmiyaa. V. S., Tiruvengala Padma

    Axial compression capacities of bored cast in situ piles as per Indian and International Standards are compared in this paper. Bored cast in-situ piles resting on soil and rock are considered for capa

    Sep 1, 2022

  • DFI
    Low Noise and Low Vibration Tube Pile Installation by the Press-in Piling Method

    By Takefumi Takuma, Hiroyuki Nishimura, Shigeru Kambe

    "In order to achieve tubular pile driving with low noise and low vibration, the Press-in Piling Method has been adopted on many projects. The method utilizes reaction force derived primarily from prev

    Jan 1, 2015