Methods Of Constructing Concrete Piles On Heavily Contaminated SitesBy N. C. Matheson
The West's Shell Pile has been used on sites with very soft ground conditions for over 60 years. Fibre reinforced precast concrete shells 900mm long are threadled onto an internal mandrel which c
Jan 1, 1989
-
Pile Design For Offshore Structures Subjected To SubsidenceBy Juan J. Campo
The Freeport-McMoRan Main Pass Mine development in the Gulf of Mexico is a complex designed to extract up to 67 million long tons of sulphur over a 40 year period. The initial development includes 15
Jan 1, 1992
-
Effects Of Change In The Support System On Temporary Secant Pile WallBy Anburaj C., Srinivas A.
Deep excavation with support system is required to construct various part of underground structures like shafts, stations and entry structures etc. These structures have to be constructed using perman
Nov 1, 2022
-
Micropiles And Anchor Piles - The Liberty BridgeBy Daryl W. Wurster
The Liberty Bridge in Greenville, South Carolina is a curved, cable-stayed, pedestrian bridge with primary support provided by two towers. The bridge is part of the Falls Park redevelopment. The bridg
Jan 1, 2006
-
The Use of the Expander Body with Cast in Situ Piles in Sandy SoilsBy Mario A. Terceros H., K. Rainer Massarsch
"ABSTRACTThe Expander Body (EB) technology has been used successfully to increase the pile toe capacity of bored piles in loose to medium dense soil. An important advantage of the EB system is the abi
Jan 1, 2014
-
Deep Excavation Support: Innovative Shoring Design in an Urban EnvironmentBy Richard D. Luark, Fernanda S. Madrona
Designing temporary retaining systems that allow for deeper excavation amid the existing urban infrastructure has become a challenge. A 60-foot-deep excavation in downtown Seattle was required to cons
Jan 1, 2019
-
Guidelines for Selecting Cutoff Wall SystemsBy Mary Ellen Large
This publication of Deep Foundations Institute (DFI) is intended to provide project owners, design engineers and construction professionals with guidelines for selecting cutoff wall and barrier system
Jan 1, 2021
-
Seepage Barrier at Bolivar DamBy Mohamed Elgouhary, Carol L. Tasillo, Daniel Koziol
"The Bolivar Dam, located near the Village of Bolivar, Ohio is one of a system of dams designed to provide flood control and water conservation in the Muskingum Watershed. The Bolivar Dam is a “dry da
Jan 1, 2016
-
Micropiles in an Urban Setting – TBTA Verrazano Narrows Bridge HOV/BUS Ramps, Brooklyn, NY and Nysdot Kosciuszko Bridge Replacement, Brooklyn, NYBy M. D. Riegel, Brian T. Felber
"Construction of foundation elements in an urban environment is often complicated by multiple constraints such as existing foundations, utility conflicts, maintenance and protection of traffic on high
Jan 1, 2016
-
Estimation of Foundation Design Loads for Liquefaction Induced Lateral Spreads Using Strain Wedge MethodBy Jogeshwar P. Singh, Mohamed Ashour
The Soil-Foundation-Structure-Interaction (SFSI) problem involves Kinematic Soil- Foundation Interaction occurring during large (cyclic and permanent) ground deformations as well as Inertial Foundatio
Jan 1, 2015
-
Environmental Considerations For Foundation Construction In The Boston Area - The New MCPBy James V. Errico
On October 1, 1993 the regulations for assessing and cleaning up contaminated soil and groundwater in the Commonwealth of Massachusetts were revised. These new regulations, known as the Massachusetts
Jan 1, 1994
-
Ladies And Gentlemen,By George Koenig
I have been granted the outstanding privilege... and pleasure to introduce you this evening to the Grand-Duchy of Luxembourg and to tell you in a few words how this country came into existence, how it
Jan 1, 1987
-
Helical Piles With Grouted Shafts - A Practical OverviewBy Gary L. Seider
Helical screw piles are used in various applications including the underpinning of distressed foundations and as deep foundations for new structures. At present, maximum design loads range between 12.
Jan 1, 2003
-
Case History - Augered Cast-In-Place Piling Installed Into Weathered SandstoneBy Edwin W. Meyer
The augered cast-in-place piling technique was used to install deep foundations 20 feet into weathered sandstone. The project involved the upgrading of the Air Quality Control System (AQCS) for a 560
Jan 1, 2006
-
Comparison Of Static Load Test And Dynamic Pile Testing ResultsBy Patrick J. Hannigan
A comparison of 40 statically and dynamically load tested piles was performed to evaluate the variation between testing methods. This evaluation indicated an agreement of 10% to 15% could be obtained
Jan 1, 1987
-
Testing And Evaluation Of Driven Plate Piles In A Full Size Test Slope: A New Method For Stabilizing Shallow Landslides ? IntroductionBy Richard Short
Shallow rainfall-induced landslides in residual and colluvial hillslopes and steep embankments are a common occurrence in many settings [1, 2, 3]. While occasionally posing a threat to property and l
Jan 1, 2007
-
Non-Destructive Testing Of Drilled Shafts and CFA Piles – Current Practice and New MethodBy George Piscsalko
"Quality control of drilled shafts and CFA piles is greatly dependent upon the practices of the site personnel. In many applications it is difficult or not possible to fully inspect the shaft prior to
Jan 1, 2014
-
Statnamic Loading Tests On Different Pile Types - 1.0 IntroductionBy Patrick Bermingham
This report presents the results of six STATNAMIC loading tests that were carried out on four different pile types at the CALTRANS 280 Test Site (Bridge No. 34-46) in conjunction with the Tension Pile
Jan 1, 1993
-
UB Digs Deep and Builds Over Adjacent Subway for New Medical Building HubBy Lisa R. Papandrea, David Chen, Walter E. Kaeck
"Construction of the University at Buffalo’s new School of Medicine and Biomedical Sciences (UB-SMBS) required excavation in variable ground to a depth of more than 40 ft adjacent to the NFTA Metro su
Jan 1, 2016
-
Site Solutions For The Pisa Tower Remediation - 1 - IntroductionBy Paolo Heiniger
The aim of this paper is to present the operative solutions devised and then adopted to implement the underexcavation (soil extraction) of the Tower of Pisa, by means of soil extraction. The inter
Jan 1, 2000