Permanent Canal Closures and Pumps Cofferdams – Support of Deep Excavation in Soft Ground Using the Open Cell Sheet Pile SystemBy Ryan Higbie, King Chin, Matthew Anderson, Mike Huggins, Rian Johnson, Dave Sinsheimer
"The Permanent Canal Closures and Pumps (PCCP) project is the capstone piece of New Orleans’ extensive hurricane risk-reduction system constructed following Hurricane Katrina. The project consists of
Jan 1, 2017
-
Structural Seismic Design Of Fashion Island Boulevard Bridge Earthquake Repair State Bridge No. 35C-160 San Mateo, California - 1 Assessment Of The Existing BridgeBy Roy M. Schnabel
The Fashion Island Boulevard Bridge over the Marina Lagoon in San Mateo, California is an eight span precast, prestressed concrete girder bridge. It is approximately 495 feet in length and 61 feet in
Jan 1, 1993
-
Design And Construction Of A Cut-Off Wall In Warm PermafrostBy Steven L. Anderson
A cut-off wall has been designed and is currently under construction along the Back Dam of the existing tailings impoundment at Red Dog Mine, Alaska. The cut-off wall, which will be in the order of 5
Jan 1, 2010
-
I-880 Replacement Project (Cypress Freeway) Large Diameter Driven Pipe Pile Foundations Test Program And Construction - Program Development - Background - CollapseBy Darrell L. Beddard
The Loma Prieta earthquake occurred on October 17, 1989 at 5:04 PM, Pacific Daylight Time. It measured 7.1 in magnitude and was felt from Los Angeles north to the Oregon state line and east to western
Jan 1, 1996
-
Use of a Reinforced Jet Grout Excavation Support System for a Major Sewer Line RepairBy Richard Brink, Eric M. Klein, Kenneth B. Andromalos
"A portion of the roof for a 129 x 144-inch, nearly 100-year-old sewer outfall in the City of Baltimore had deteriorated to the point that it resulted in the development of a large sinkhole in a resid
Jan 1, 2005
-
Cut-Off Walls For Diamond Mining In The ArcticBy Wolfgang G. Brunner
A 3800 m long temporary water-retaining dike has been constructed under extreme conditions in the harsh northern climate to enable two of the kimberiite pipes at the Diavik Diamond Project reserve to
Jan 1, 2003
-
Analyzing Drivability Of Open Ended Piles In Very Dense SandsBy James A. Schneider
The successful installation of long piles driven into very dense sands relies on the occurrence of the reduction in local friction with increased pile embedment, a phenomenon known as ?friction fatigu
Jan 1, 2010
-
Drilled Piers In The Piedmont - IntroductionBy Stanley A. Schwartz
In the Piedmont, heavily loaded structures are generally supported by either drilled piers or one of several pile types. The choice of drilled piers or piles is typically one of comparative costs. The
Jan 1, 1988
-
Quality Control For Installation Of Augered Cast-In-Place PilesBy Francis J. Arland
The installation of augered cast-in-place (ACIP) piles requires careful quality control to assure a successful pile installation. Unlike steel, pre-stressed concrete or other types of driven piles, wh
Jan 1, 1997
-
The Equilibrium Point Method Of Analysis For The Statnamic Loading Test With Supporting Case HistoriesBy R. G. Horvath
The Statnamic loading test is a new and innovative method for testing deep foundations. The test is relatively inexpensive, quick, easily mobilized, provides for direct measurement of applied load and
Jan 1, 1993
-
Large Diameter Drilling Operations Of Multi Head Down The Hole Hammer Drill Through Boulders And Granite - Mach Drilling System And Some Construction ExamplesBy J. Nakayama
Construction of foundation piles or diaphragm walls through rocky or boulder containing formations has been long-standing difficulty. It has been widely understood that the down-the-hole hammer is t
Jan 1, 1989
-
The Heritage of Swedish Foundation EngineeringBy Stefan Aronsson, K. Rainer Massarsch
"ABSTRACT The geology of Sweden is characterized by the most recent glacial period with deposition of very soft clays and loose sand. Due to these difficult geotechnical conditions, new, innovative fo
Jan 1, 2014
-
Appropriate Field Measurements For Testing Capacity-Prediction Methods For Piles Installed By Vibration - IntroductionBy Michael W. Neill, O&apos
The engineering profession generally does not accept vibro-driven piles as bearing piles unless their capacities can be verified by restriking with an impact hammer, which significantly reduces the ec
Jan 1, 1989
-
Non-Destructive Testing, Evaluation And Optimization Of Existing Deep Foundations For Re-Use Along The East CoastBy Matthew E. Meyer
Renovation, rehabilitation, restoration and expansion of existing residential, retail, commercial, hospital facilities and historic structures requires assessment and evaluation of foundation systems
Jan 1, 2011
-
Instrumented Rock-Socketed Drilled Piers Hamilton General Hospital ? IntroductionBy R. G. Horvath
In the Hamilton area, and in many other areas of Ontario and around the world, large diameter drilled pier (caisson) foundations are frequently selected as the most appropriate foundation system for h
Jan 1, 1987
-
Pile Load Test Results For Highway 280 Pile Uplift Test SiteBy Douglas Brittsan
This paper presents pile tension and compression load test results for the Southern Freeway Viaduct (North) pile load test site. The testing program represents a collaboration between California Depar
Jan 1, 1993
-
A New Method Of Analysis Of Pile Displacement In Soil With Respect To TimeBy M. England
A method for the analysis and prediction of single pile displacement behaviour is described. It is the displacement in time, under constant load, based on the use of hyperbolic functions to characteri
Jan 1, 1993
-
New Focus: Environmental Impact Reduction of Proper Slurry Waste ManagementBy Zachary Q. Maassen
The purpose of this paper is to highlight the environmental benefits of properly managing slurry waste as it is generated on site. The following projects will be used to illustrate the importance of p
Jan 1, 2018
-
Numerical Analysis of CFA Piles for High-Rise Building of Administrative Centre Lakeside Park in BratislavaBy J. Stacho, Frankovská. J.
"Abstract The use of continuous flight auger (CFA) piles in Slovakia has increased significantly in recent decades. High-rise building of administrative centre Lakeside Park in Bratislava is based on
Jan 1, 2014
-
Assessing the Bearing Capacity of Existing Wood Pile FoundationsBy Almer E. C. van der Stoel
"Abstract This paper deals with assessing the bearing capacity of existing wood pile foundations. With a wide range of restoration projects being performed in the Netherlands, on many locations deep e
Jan 1, 2014