Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Characterizing Internal Macropores Using Cross-Specimen Acoustic Tomography: Initial Two Dimensional Results

    By Christopher Sherman

    The engineering properties of a geologic material are greatly affected by the presence of macropores. Previous research has demonstrated that the size, location, and proximity of macropores influences

    May 1, 2009

  • CIM
    Haulage Evaluation for an Underground Deposit

    By David L. Sprott

    This paper presents an evaluation of underground-to-surface haulage options for a relatively large deposit. Specifically, it presents a recommended haulage option to provide the greatest value to the

    May 1, 2008

  • CIM
    Open Stope Exposure Time and Stope Dilution

    Unplanned open stope hanging wall dilution is a significant cost for many open stope mining operations. Significant advances in empirical and analytical approaches for estimating stope dilution have b

    May 1, 2003

  • CIM
    The Use of the Portaspec At Manitou Barvue

    By Giles St. Pierre

    "The purpose of this paper is to report in a general way on the use of the Portaspec X Ray Spectrograph.At Manitou Barvue, we are milling two types of ores, copper and zinc. The control assay practice

    Jan 1, 1971

  • CIM
    Leadership Review: Trolley Assist

    By Donald Lindell

    Safety Share ?Dad receives fryer for Christmas 2009 and makes delicious sweet potato fries ?When the oil fryer was pushed back on the stove for cooling, the back edge comes into contact with the sto

    May 1, 2010

  • CIM
    Effect of Core Diameter on the Bond Impact Crushing Work Index Test (Phillips Enterprises LLC, DJB Consultants, Inc, Alex G. Doll Consulting Ltd )

    By R. Phillips, A. G. Doll, D. J. Barratt

    "The Bond low energy impact (crushing) work index test is specified to be performed on rock specimens between 50 mm and 75 mm in effective diameter. NQ-diameter drill core, frequently used in mineral

    Jan 1, 2012

  • CIM
    Stratigraphy, Structure, and Geochemistry of the Halfmile Lake Massive-Sulfide Deposit, New Brunswick (a738daf4-2f2a-4901-b06d-657f347a1821)

    By Robin N. Adair

    The Halfmile Lake stratiform volcanogenic massive-sulfide deposit consists of pyrrhotiterich breccia-matrix sulfides and pyrite-pyrrhotite-rich layered sulfides that form a laterally continuous sheet

    Jan 1, 1992

  • CIM
    Effect of Basicity on the Crystallization Behavior of Synthetic Slags

    By S. Esfahani, M. Barati, K. Danaei

    "Substituting Portland cement with slag cement is one of the most economically attractive uses of slags. For this application, high cooling rates are required to form an amorphous structure. However,

    Jan 1, 2014

  • CIM
    From Microbes to Plasma Spectrometer: An Evaluation of Ore Dissolution Efficiency (22cf60df-b55a-4f5d-92c1-f5f6ac49fa74)

    By Aimee Williamson

    Bio-mining is a cost-effective, energy efficient and potentially environmentally protective method of exploiting a variety of ore deposits, from high-grade base metal deposits of nickel to lower-grade

    Aug 1, 2010

  • CIM
    Electronic protection systems for mining

    By James A. Deeks

    "Motor failures and equipment bearing failures are responsible for reduced productivity.With the introduction of computers and data acquisition systems, users are now able to monitor, report and trend

    Jan 1, 1992

  • CIM
    New Mechanism of Coal Mine Slope Failure

    By K. N. Karparov

    ?Two highwall failures in a South African coal mine defied analysis by widely accepted limit equilibrium methods. ?The geological conditions were complex, with undulating coal-bearing strata overlyin

    May 1, 2007

  • CIM
    The Plant Engineering and Maintenance Association of Canada

    By Norm Clegg

    The Plant Engineering and Maintenance Association of Canada PEMAC is a national, not-for-profit industry association for plant and facility maintenance, engineering and physical asset management in a

    Feb 1, 2008

  • CIM
    Multi-Component Autogenous Pilot Trials (2276d61f-fbab-4986-8788-619a8e669f37)

    By N. Plint, D. Philips, J. Sweet, B. Durant

    A pilot scale AG milling campaign was conducted at the AngloAmerican Platinum pilot plant in South Africa. Different blends of hard: soft (silicate: chromite) and coarse: fine particles in the AG mill

    Jan 1, 2012

  • CIM
    Using Dynamic Railcar Weighing For Loadout Operations

    By Felix D. Klebe

    Efficient, high volume, mine load out operations have evolved in recent years to include more sophisticated control systems that integrate with mission critical equipment such as weighing systems. Tra

    May 1, 2008

  • CIM
    Investigation into Laboratory Scale Tests for the Sizing of High Pressure Grinding Rolls (36201383-38b6-40ff-a8ef-b5e69088dfb5)

    By J. Drozdiak

    In this paper we present the results of preliminary investigations into the applicability of new laboratory scale tests for the prediction of operating gap and specific throughput in high pressure gri

    Jan 1, 2012

  • CIM
    Cadia Expansion – From Open Pit to Block Cave and Beyond (4a1cbd75-8ba9-4485-8c66-2de027979f5e)

    The Cadia mine is shifting from the open pit operation to the Cadia East underground block cave. The resulting increase in milled tonnes and the decrease in fines production through shifting to block

    Jan 1, 2012

  • CIM
    Measuring, Predicting and Managing Grinding Media Wear (9876220d-bfc9-4061-8977-6c93ce000242)

    By J. Seidel

    In 2009 Newmont Mining Corporation’s annual global spend on grinding media reached $94M USD, having doubled in the five years since 2004. The major contributing factor to the spend escalation during t

    Jan 1, 2012

  • CIM
    Moisture Effect on CO Oxidation over Supported Gold Catalysts

    By Masakazu Daté

    Moisture effect has been studied for the CO oxidation over Au/TiO2, Au/Al2O3 and Au/SiO2, in the range of H2O concentration over four orders of magnitude. It has been found that the catalytic activity

    Oct 1, 2003

  • CIM
    Achieving 15% Productivity Improvement with the Intellimine System and Change Management Services

    By Chigova. Terence

    In 2008, Anglo installed the Modular IntelliMine® System at its Kleinkopje Mine (AKK). As part of this deployment, Anglo also used the Change Management Consulting Service offered by Modular to ensure

    May 1, 2010

  • CIM
    Two-Stage Fluid Bed Reactor for Arsenic Removal and Fixation

    By K. Adham, C. T. Harris

    Arsenic is often associated with copper, nickel and gold in sulphide deposits. This paper describes a two-stage high-temperature fluid bed reactor for the removal and fixation of As from ores and conc

    Jan 1, 2014