A Two-Phase Backfill Approach to Dilution Control at the Doyon MineBy Emilie S. Williams
The Doyon Mine?s Zone 1 (Altered Zone), found along the southern boundary of the mine, encompasses approximately 20% of the mining reserves. The mineralisation is found in a series of steeply dipping
Oct 1, 2004
-
THE SSW PROBE: A new High-Tech Tool to Raise Ore Grades by Reducing Dilution Within Metal Mines.By Pierre Gaucher
It is possible to selectively mine an orebody by combining the use of the SSW probe with any bulk mining methods as well as narrow vein exploitations. In other words, thanks to the use of the SSW prob
Oct 1, 2001
-
Flowsheet Design Using Flotation Rate, Selectivity and RTD DataBy Manqiu Xu, Peter Wells, Gord Bacon
"A methodology is proposed for milling flowsheet design using flotation rate, selectivity and residence time distribution data. The flotation rate data and the difference in flotation rates between th
Jan 1, 2005
-
Use of the Enviro-Clear Thickener at Quirke MillBy H. Ewaschuk
"INTRODUCTIONRio Algom's involvement with the Enviro-Clear thickener began in May 1975, when tests on a laboratory waif were carried out by our Research and Development group. Commencing in June, furt
Jan 1, 1977
-
Novel Dewatering Aids for Mineral Concentrates and CoalBy M. Kerr, Petra Lampinen, Jinming Zhang, Petra Brodin, C. Hull, Nils-Johan Bolin, R. Asmatulu
"According to Darcy’s equation, the rate of dewatering varies as inverse square of the surface area of the particles to be dewatered and is proportional to the pressure drop across a filter cake. Thus
Jan 1, 2005
-
Marked Ball Wear TestingBy G. D. West, J. D. Purdue
"Marked Ball Wear Testing (MBWT) employs identified grinding balls which are placed in an operating mill for a period of time, retrieved from the mill, and then measured to determine the amount of wea
Jan 1, 1991
-
A Novel Sustainable Process for Anode Slime PurificationBy E. Roman E.
A novel anode slime purification process was developed and tested at pilot scale in the Chuquicamata Refinery. The process consists of three main stages: First, an atmospheric alkaline leaching at 90°
Jan 1, 2007
-
Paste Backfill Strength Behaviour Using Different Binding Agents and Binder CombinationsBy Philip A. Dirige
This paper presents the variability of responses of paste backfill specimens that have been prepared with varying binding agent and binder combinations, when subjected to uniaxial compressive strength
May 1, 2006
-
Geochemical and Isotopic Studies, Noranda & Matagami AreasBy S M. Roscoe
Relationships of Noranda sulphide deposits to volcanic rocks are reviewed and chemical variations within the volcanic sequence are described. The assemblages of minor elements in the pyrites and pyrrh
Jan 1, 1965
-
Seismic source parameters used to monitor rockmass response at Brunswick mine (5a673da7-13e1-42d4-880a-c4441be71d76)By B. Simser, V. Falmagne
"Noranda’s Brunswick mine is a 10 000 t/d producer of lead-zinc-copper-silver ore that has been in operation since 1964. Mining of this multiple lens deposit is primarily by blasthole stoping techniqu
Jan 1, 2004
-
Seismic source parameters used to monitor rockmass response at Brunswick MineBy B. Simser
Noranda?s Brunswick mine is a 10 000 t/d producer of lead-zinc-copper-silver ore that has been in operation since 1964. Mining of this multiple lens deposit is primarily by blasthole stoping technique
May 1, 2004
-
Island Copper Mine Milling for Copper and MolybdenumBy Chris Brown
"The Island Copper plant was designed and built by Fluor Utah Ltd, in conjunction with Utah design staff, Originally designed to treat 33,000 tons/day (t/d) of ore, the current average milling capabil
Jan 1, 1975
-
Analysis of Decisive Factors in Opening an Underground Dimensional Limestone QuarryBy I. Cotman
Dimensional stone processing has become an important part of the world extractive industry, and today?s total stone block yearly production is estimated to be around 134.000.000 tons and is still grow
Aug 1, 2013
-
Column Flotation Experience at the Sarcheshmeh Copper MineBy S. Banisi, M Nesari, J. A. Finch, N. Nobari, H. Javani
"The flotation circuit of the Sarcheshmeh copper mine, which processes 40,000 t/d of ore at 0.9% Cu, consists of rougher, cleaning and recleaning stages. Mechanical flotation cells are used in all sta
Jan 1, 2000
-
Converting the Key Lake Mill Process for McArthur River Ore"The Key Lake mill was commissioned in 1983 to process the two Key Lake ore deposits. With the depletion of these ore bodies in 1999, the plant was converted to mill the exceptionally rich McArthur Ri
Jan 1, 2001
-
How to be a SurvivorBy W. G. Johnson
"As we move into 1983, Canada is not only in a deep recession, there are major changes taking place.International competition is growing fiercer.Major core industries such as automobile, steel, mining
Jan 1, 1983
-
Setting the Record Straight (1e43186a-ec2a-4801-b2d8-fe8de2f5f8ed)By Don Thompson
Canada’s oil sands are a controversial topic and virtually every newsmaker and layperson seems to have an opinion about this 179 billion barrel resource. The oil sands represent 97 per cent of Canada’
Jan 1, 2010
-
Prevention of Losses in Rail Shipment of Concentrate at Mattagami Lake MinesBy K. V. Konigsmann
"Mattagami Lake Mines Ltd operate a zinc-copper mine with an annual output of about 200,000 tons of zinc and 30,000 tons of copper concentrates. Zinc concentrates arc shipped to a company owned smelte
Jan 1, 1975
-
Startup of New Facilities to Planned Performance LevelsBy A. Rajan
"Drawing upon the experiences of a gold extraction plant startup in the Southern Pacific, this paper will describe the importance of the commissioning phases to the project outcomes to achieve early t
Jan 1, 2000
-
Potash Processing: 25 Years of Process DevelopmentBy A. F. Banks
"Potash processing in Canada commenced on a commercial scale in 1962. Over the last 25 years it has grown into a world-class industry with many advances in processing technology. As it is a relatively