Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The changing role of the Construction Group of the Project Development Division of Placer Dome Inc.

    By M. A. Creaney

    "The Construction Group is responsible for the construction of all of Placer Dome’s major projects and contributes to the development of most major feasibility studies. This group includes an internat

    Jan 1, 1998

  • CIM
    The Use of Diagnostic Testwork and CIP/CIL Modeling to Improve the Metallurgical Performance at Two IAMGOLD Operations

    "A simple approach to optimizing the performance of an operating carbon in pulp (CIP) or carbon in leach (CIL) plant is presented. It is possible to reproduce the performance of an operating CIP or CI

    Jan 1, 2011

  • CIM
    The Design of Gold Mills: What Could Be Simpler

    By R. Nendick

    "IntroductionThe Ancient Egyptians recovered gold from the mud in the bottom of ponds by having teams of maidens sit around the pond dipping goose feathers dipped in grease into the mud. The gold woul

    Jan 1, 1986

  • CIM
    Particle Composition Distribution: Measurement and Prediction in Mineral Processing

    By G. Barbery

    "Particle composition distribution is an essential feature of materials processed by physical separation methods. The amenability to segregate a feed material in a concentrate and a tailings stream de

    Jan 1, 1986

  • CIM
    Design and Operation of a Future Mill

    By D. E. Pickett, J. A. Roland Faucher

    "INTRODUCTIONMineral processing is undergoing growth and change at a rapid rate. The modern flotation process was discovered only in the mid-twenties, and uranium leaching in the mid-fifties. The grow

    Jan 1, 1979

  • CIM
    Modelling of Cracking in Concrete Tunnel Lining by Continuous-Discontinuous Approach

    By J. L. Feng, F. Zhang, S. K. Hu

    "Cracking is one of the most serious damages in tunnel linings, which is often observed by in-situ inspection to tunnel engineering. It is difficult to better characterise for the deformations from co

    Jan 1, 2015

  • CIM
    Comparisons of the Geology and Proposed Underground Mining Methods of the Panda and Koala Kimberlites at the EKATI Diamond Mine

    By Peter A. Oshust

    The EKATI Diamond Mine has successfully completed the development and commissioning of the Panda Underground Project to extract the ore below the Panda open pit. The dominant kimberlite domain of the

    May 1, 2006

  • CIM
    Beneficiation of Concentrated Ultrafine Suspensions with a Falcon UF concentrator

    By Jean-Sébastien Kroll-Rabotin, Éric Climent, Florent Bourgeois

    "Falcon concentrators are enhanced gravity separators designed for concentrating fine and ultrafine slurries. The Falcon UF model is unique in that it is dedicated to beneficiation of ultrafines, one

    Jan 1, 2011

  • CIM
    Low Temperature Heat-Treatment Cycle on AlSi10mg_200C Alloy Fabricated By Direct Laser Metal Sintering: Microstructure Evolution and Corrosion Resistivity

    By M. Rafieazad, P. Fathi, M. Mohammadi, A. M. Nasiri

    This study examines the impact of low-temperature heat-treatment cycles on microstructure and corrosion performance of Direct Metal Laser Sintered (DMLS) AlSi10Mg_200C alloy. It is known that the morp

    Jan 1, 2018

  • CIM
    Mine Planning Guidelines for Developing Sustainable Closure Drainage Systems

    By Leslie F. Sawatsky

    Failure of drainage works is one of the principal threats to the sustainability of mine closure facilities but the risk can largely be remedied by appropriate design of mine closure drainage facilitie

    May 1, 2004

  • CIM
    Establishing the Best Practice Guidelines in Mineral Processing for NI 43-101

    By Tony Lipiec, Chris Fleming, Larry Urbanoski

    In 2009, the Canadian Mineral Processors (CMP) became aware that Canadian securities regulators were amending the contents of National Instrument 43-101. NI 43-101 is a set of regulations which establ

    Jan 1, 2011

  • CIM
    CIM 2011 - Process Development for Primary and Weathered Ores at the London Mining Marampa Iron Ore Project, Sierra Leone

    By Peter Dunn

    London Mining Plc. is developing an iron ore project in Sierra Leone. The Marampa mine is a brownfield development effort, having been operated by others since the 1930?s until low iron ore prices for

    May 1, 2011

  • CIM
    Acid mine drainage prevention and control options

    By N. Kuyucak

    "Acid mine drainage (AMD) is one of the most significant environmental challenges facing the mining industry worldwide. It occurs as a result of natural oxidation of sulphide minerals contained in min

    Jan 1, 2002

  • CIM
    An Improved Definition of Rock Quality Designation, RQDc

    By L. Li

    The rock quality designation (RQD) was initially introduced by Deere (1963) for civil engineering. But, its application has been largely extended to rock mechanics and has become a fundamental paramet

    May 1, 2009

  • CIM
    Sources de dilution dans les mines souterraines : Méthodes de calcul

    "RÉSUMÉOn discute les principales sources de dilution au cours d’une exploitation souterraine. Les différentes définitions de la dilution en usage sont analysées. Une nouvelle méthodologie de calcul s

    Jan 1, 2001

  • CIM
    Geostatistical resource estimation for the Poura narrow-vein gold deposit (4178b3ee-8316-4d7e-a069-b76cea76f353)

    By P. K. Frempong, S. D. Butt

    "A case study for the application of a novel geostatistical technique for resource estimation of a narrow steeply dipping, gold-silver mineralized quartz vein deposit is presented. The technique is no

    Jan 1, 2004

  • CIM
    Geostatistical resource estimation for the Poura narrow-vein gold deposit

    A case study for the application of a novel geostatistical technique for resource estimation of a narrow steeply dipping, gold-silver mineralized quartz vein deposit is presented. The technique is nov

    Feb 1, 2004

  • CIM
    Developing Solutions to Complex Flotation Problems

    By B. K. Gorain

    "Mining of low grade deposits along with the necessity to design and operate flotation plants with high throughput presents unique metallurgical and environmental challenges that need to be addressed

    Jan 1, 2013

  • CIM
    Millerite and Its Impact on Cu/Ni Separation

    By F. D. Ford, Z. Dai

    "Vale’s Ontario Operations re-introduced Cu/Ni separation at Clarabelle Mill in 2006. The mill processes ores from a number of mines in the Sudbury basin. A saleable Cu concentrate is produced at 30-6

    Jan 1, 2011

  • CIM
    Applicability, Challenges and Recent Application Experience of WLAN and Ethernet as Integrated Mine Communication Backbone

    By Christoph Mueller

    Broad band mine communication traditionally is characterized mainly by individual solutions, which have in common their long development phases and their high cost for development, operation and servi

    May 1, 2006