Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    A new approach to logging and modelling faults at the Dugald River Pb-Zn-Ag deposit, North West Queensland

    By K George

    The Dugald River lead-zinc-silver deposit is located approximately 60 km north-west of Cloncurry and 87 km north-east of Mount Isa. The development project is expected to turn operational in 2018. The

    Sep 20, 2017

  • AUSIMM
    Fine-Tuning Raise Bore Stability Assessments and Risk

    By W A. Peck

    Raise boring is the preferred option for constructing ventilation shafts in Australia. The trend has been towards larger diameters and longer single-pass shafts, and if at all possible, reaming throug

    Mar 21, 2011

  • AUSIMM
    Industrial Strength Optical Image Analysis System - Mineral4/Recognition4

    By S Hapugoda, J R. Manuel, M J. Peterson, A Poliakov, E Donskoi

    ################

    Aug 12, 2013

  • AUSIMM
    A Comparison of Two Methods for Calculating the Constants K and Alpha in a Broken Ore

    By R Minnitt

    Two methods of calibrating the parameters K and Alpha for use in Gy’s formula for the fundamental sampling error were investigated. Approximately 480 kg of broken ore from Harmony’s Target gold mine i

    Jul 29, 2014

  • AUSIMM
    Geochemistry of Tailings and Seepage from Three Tailings Storage Facilities in Australia - Uncapped, Capped and Active Tailings

    By T Baumgartl, D Bradshaw, B Forsyth, M Edraki

    In a tailings storage facility, the chemistry of pore water is a function of oxidation and dissolution of sulfide minerals, containing metals and metalloids, the neutralising effect of gangue minerals

    Jul 10, 2012

  • AUSIMM
    Owner-Operator versus Contractor Production Scheduling - A Vision for the Effective Exploitation of Australian Gold Resources by Surface Mining

    By R Halatchev

    Production scheduling optimisation in open pit gold mining is a complex problem as it is driven by economic criteria reflecting particular economic interests of the concerned parties in the mining bus

    Sep 26, 2013

  • AUSIMM
    Inclusion of Safescape Laddertube to enhance emergency egress in ventilation shafts

    By B Murphy

    Safescape Laddertube provides an improved system for emergency egress in ventilation shafts. The addition of Laddertube in a rise has very little impact on ventilation flow, studies have indicated th

    Oct 12, 2022

  • AUSIMM
    Modelling Dust Plume Movement Resulting from Surface Blasting Operations

    By S Bhandari

    A model for predicting dust plume dispersion from blasting operations using the Eulerian mathematical algorithm has been developed. This model considers atmospheric stability, and wind velocity and di

    Nov 8, 2011

  • AUSIMM
    Laboratory Studies in Comminution: Part V Simulation of an Industrial Rod MIll Product

    It is possible to closely simulate the product sizing distribution from an industrial rod mill by the correct choice of parameters in laboratory batch milling. For laboratory batch rod milling, change

    Jan 1, 1998

  • AUSIMM
    Analysis on crack distribution and evolution characteristics of gangue backfilled working face roof

    By X Y. Ma, X G. Tian, P F. Zhang, T B. Zhao, Z H. Li, Z Y. Fu

    This study analysed the fracture characteristics and movement process of goaf roofs under the condition of gangue backfilled mining, based on the engineering conditions of Tangshan Mine F5001 gangue b

    Nov 29, 2022

  • AUSIMM
    Key Drivers of Energy and Cost Efficiency in Autogenous/Semi-Autogenous Grinding Circuits

    By G Lane, M Bueno

    In a recent publication (Bueno and Lane, 2011) the authors presented the analysis of a consolidated dataset composed by 137 autogenous/semi-autogenous grinding (AG/SAG) mill pilot trials. By comparing

    Oct 29, 2012

  • AUSIMM
    Scenic Railway Tunnel Upgrade in the Blue Mountains, New South Wales – An Approach to Design and Construction

    By A Hughes, S G. Rosin

    This paper presents the design and construction approach adopted for the widening and stabilisation of the existing decline tunnel forming part of the Scenic Railway Upgrade project at Katoomba in the

    Sep 17, 2014

  • AUSIMM
    Deportment of Gold in Sulfide Ores and Implications for Gold Extraction

    By J Zhou

    Gold in sulfide ores is associated predominantly with sulfide minerals and occurs as both microscopic and submicroscopic particles. In non-refractory sulfide ores, gold occurs mainly as coarse- and me

    Sep 26, 2013

  • AUSIMM
    A Review of the Influence of Gas Pressure on Block Stability during Rock Blasting

    Blasting is an essential component of most mining operations, and is used to reduce the rock mass to a workable size distribution, as well as to create stable openings and pit walls. Frequently, there

    Jan 1, 1999

  • AUSIMM
    The Role of Benchmarking and Independent Reviews

    By D Hunter, N Cusworth, J Miller

    "Recent project failures have called into question the use and relevance of benchmarking and independent reviews, forcing a rethink of traditional processes and procedures.With cost estimates and sche

    Mar 8, 2016

  • AUSIMM
    Bulk sensing for effective ore sorting – learnings over 35 years

    By H Kurth, L Balzan

    The potential for bulk diversion was identified and quickly implemented following the development of bulk sensing technologies applied to conveyed flows. In the early 1980s real time analysis of ash i

    Nov 10, 2020

  • AUSIMM
    Improved assurance for Mineral Resource and Ore Reserve estimates and reporting through peer review and auditing

    By M A. Noppé

    Mining is inherently a risk-based business and risk governance is an integral part of corporate assurance and business decision-making. Mineral Resources and Ore Reserves are the key assets for a mine

    Sep 20, 2017

  • AUSIMM
    The Domains Concept – 20 Years on Retrospective, Obstacles and Opportunities for Effective Life-of-Mine Implementation

    By B E. McCarthy

    Red Dome Mine was a highly complex gold copper operation developed over a number of phases between mid-1986 to October 1997. With only three years of production ahead at any time, a proactive practica

    Jul 16, 2014

  • AUSIMM
    Underground Auxiliary Ventilation Monitoring and Diagnostic System

    By S Viviers, G Ratner

    Ventilation is part of all underground mine operations and is undertaken in order to introduce fresh, cool air to the workings and to remove stale, affected air. It is problematic to obtain efficient

    Jul 1, 2013

  • AUSIMM
    The Benefits of Technology Partnerships during Brownfield Upgrades

    By S Morgan, L C Pagdalian, S Serdzeff, C Malaloy-on

    It is widely accepted that mineral deposits are decreasing in metal grades. To remain profitable and meet market demand, mining companies are expanding their operations by increasing the tonnage treat

    Sep 1, 2014