Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Temporary Support Design for the Largest Road Caverns Ever Built in Australia – The Lutwyche Caverns

    By N McKenzie, E Taylor, S V. L Barrett, H Lagger, A Purwodihardjo

    This paper discusses the temporary support design methodology for the largest road caverns ever built in Australia—the Lutwyche Caverns—part of the Airport Link project in Brisbane, Australia. The Lut

    Sep 17, 2014

  • AUSIMM
    Water Treatment at the Waihi Gold Mine

    By B Twidle, D Bertoldi, J Meikle, R Dunne

    The Waihi Gold Mine is situated in a high rainfall area (annual average of over 2 m) on the North Island of New Zealand. Water treatment and discharge at the mine has been ongoing for the last 25 year

    Sep 26, 2013

  • AUSIMM
    Flotation of Phosphate Gangue from Magnetite Fines - Non-Ionic Surfactant as Atrac Collector Modifier

    Flotation of Phosphate Gangue from Magnetite Fines - Non-Ionic Surfactant as Atrac Collector Modifier

    Sep 13, 2010

  • AUSIMM
    Morphological Characterisation of Spongillites from South-Eastern Brazil

    By A F. D C Varajpo, R C. Weba, C Volkmer-Ribeiro, C A. C Varajpo, N S. Gomes

    This study relates to the spongillite deposits from the region of Jopo Pinheiro, in the north-west of the State of Minas Gerais, south-eastern Brazil. The deposits occur in shallow ponds (with a maxim

    Jan 1, 2008

  • AUSIMM
    Uncertainty - An Important Source of (Additional) Value for Mine Projects

    By S Watson, L Martinez

    Mine projects are complex opportunities that demand a constant assessment of uncertainty, ie risk and upside potential. This is because the value of a mine project is typically influenced by many unde

    May 24, 2012

  • AUSIMM
    Developing Process Control Standards for Optimal Plant Performance at PanAust Limited

    By D Baas, D Bennett

    This paper describes how Brisbane-based PanAust Limited develops process control strategies that are implemented at all operations and are used in functional descriptions for plant upgrades and new pr

    Sep 1, 2014

  • AUSIMM
    Active and Passive Seismic Monitoring of Cave Front Evolution

    By R A. Lynch

    The state-of-the-art in cave seismic monitoring is reviewed, with the latest developments in active seismic monitoring included. Seismic monitoring systems are routinely used by most of the world’s bl

    May 9, 2016

  • AUSIMM
    Numerical Modelling of Monorail Support Requirements in Decline Development

    This paper discusses support requirements for the proposed monorail system to be used in decline development. The monorail drilling and loading systems are systems that move on the rail (monorail) ins

    Dec 6, 2010

  • AUSIMM
    Geomechanical Modelling of the Mount Isa Copper Deposit – Predicting Mineralisation

    By R O’Sullivan, D Taylor, J G. McLellan, B Miller

    The Mount Isa copper deposit is located adjacent to the city of Mount Isa, Queensland, and lies within a series of Palaeoproterozoic to Mesoproterozoic Superbasins. The deposit is hosted almost entire

    Aug 18, 2014

  • AUSIMM
    Structural Controls on Gold Mineralisation in the South-eastern Truong Son Fold-thrust Belt and its Significance in Regional Metallogeny

    By T X. Le, H T. Tran, K Zaw, T Manaka

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Truong Son fold-thrust belt (TSFTB) is a prominent tectonic component of mainland Indoc

    Mar 18, 2015

  • AUSIMM
    Wall Control Blasting

    By D P. Blair

    There are two major aspects to wall control blasting – the potential for any blasthole to cause wall damage and the potential for a delayed sequence of blastholes to cause damage. The damage potential

    Aug 24, 2015

  • AUSIMM
    Landslide Stabilisation at the Clyde Power Project: A Major Geotechnical Undertaking

    Construction work on one of the world's largest landslide stabilisation projects is drawing to a close in Central Otago. Begun in mid 1990, major stabilisation work has been carried out on seven

    Jan 1, 1992

  • AUSIMM
    Importance of Effective Sampling and Test Work Protocols for Process Plant Design

    By N Guresin, A Cooper, L Lorenzen, H Muller, S C. Dominy

    Sampling and metallurgical test work during various phases of engineering?studies?is of?paramount importance for a robust processing plant design. When developing a process flow sheet, risks in achiev

    Aug 21, 2012

  • AUSIMM
    TankCell Flotation at SamarcoÆs Germano Concentrators

    By B Murphy, A Uliana, P STrgio de Oliveira, G Ara·jo de Souza Franco, T Miettinen

    Outotec has performed numerous research and development projects and various surveys in the study of reverse iron ore flotation. Over the past four years their TankCell-70 and TankCell-160 flotation c

    Aug 12, 2013

  • AUSIMM
    Mesothermal Gold Deposits of Westland, New Zealand and Southern Alaska: Products of Similar Tectonic Processes?

    By D Skinner, P Haeussler, D Bradley, A Christie

    Mesothermal gold deposits of southernAlaska and Westland, New Zealand have both formed at the seaward edge of major collisional zones in the Pacific basin. In Alaska, production of large fluid volumes

    Jan 1, 1995

  • AUSIMM
    A Numerical Model to Simulate the Effectiveness of Remedial Measures Aimed at Reducing Acidity and Metal Concentrations in the Ngakawau River and its Tributaries Near Stockton Coal Mine, West Coast, New Zealand

    By P Lindsay

    A numerical model has been developed to simulate the effectiveness and costs of a number of conceptual remedial measures aimed at reducing acidity and metal concentrations in the Ngakawau River and it

    Jan 1, 2006

  • AUSIMM
    Research Needs in Regard to Design, Performance Criteria, Construction, Maintenance Assessment and Repair of Coal Mine Seals

    Legislation introduced for Queensland and New South Wales Coal mines provides different levels of prescription regarding specification of mine seals û generally in relation to capacity to withstand ov

    Jan 1, 2005

  • AUSIMM
    VertiMill® Performance Updates in Secondary and Regrind Duties at Cannington Mine, BHP Billiton

    By J Allen, B Oats, S Palaniandy, M Lollback

    The Julius Kruttschnitt Mineral Research Centre has conducted an intensive VertiMill® (VTM) survey program at the Cannington mine concentrator as part of the ‘collaborative research in stirred milling

    Sep 1, 2014

  • AUSIMM
    Adequacy of Sampling and Volume Estimation for Premining Potential Acid Forming Waste Evaluation Using Statistical and Geostatistical Methods

    By A Garvie, D Kentwell, J Chapman

    "Most new mining projects require an initial assessment of the locations and volumes of potential acid forming (PAF) waste that is likely to be moved and dumped in surface waste stockpiles. This requi

    Jul 10, 2012

  • AUSIMM
    Modelling of Froth Transportation in an Outokumpu 3 m<sup>3</sup> Tank Cell

    By J-P Franzidis, E V. Manlap

    Froth transportation characteristics have a significant impact on the flotation recovery especially in large flotation cells. The probability of an attached particle being recovered into the concentra

    Jan 1, 2005