Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Post-Mine Leaching of Galena and Marmatite at Broken Hill (ea61d7ab-2e88-4fdc-9bea-cd90f66cb557)

    By Blanchard R

    The discussion submitted by Drs. Stillwell and Edwards is at once helpful and gratifying to the authors. Their contribution deals with two phases of the problem-(I) an additional suggestion for the re

    Jan 1, 1943

  • AUSIMM
    Characterisation of Coal Seam Gas Waters in New Zealand

    By D Nobes, D Trumm, D Manhire, A OÆSullivan, M W. Milke

    Coal seam gas (CSG) exploration and development requires the abstraction of significant amounts of water. This is so because gas desorbtion in coal seams takes place only after aquifer pressure has be

    Jan 1, 2005

  • AUSIMM
    Enhancing magnetite concentrate granulation by blending with hematite ore

    By J Addai-Mensah, M Adam, W Skinner, J Begelhole, K Quast

    Granulation of iron ore fines into robust granules is critical to successful sintering and blast furnace operations in iron and steelmaking. Iron and steelmakers desire iron ore granules with high str

    Jul 24, 2017

  • AUSIMM
    Contributed Discussion "Instantaneous Outbursts of Coal and Gas - A Review" by Alan J. Hangraves ( Proceeding No. 285, March. 1983)

    By Rixon K. L

    Hargraves (1983) has reviewed the phenomenon of instantaneous outbursts of coal and gas with special attention to Australian occurrences. The purpose of this discussion is to highlight some problems a

    Jan 1, 1983

  • AUSIMM
    The Thames-Hauraki Pumping Plant at Thames, New Zealand

    THIS paper proposes to give a general description of the pumping and other machinery in use at the Thames Hauraki Pumping Station, situated on the Thames goldfields of the North Island, New Zealand. A

    Jan 1, 1912

  • AUSIMM
    Sedimentary Structures in the Metamorphic Rocks and Orebodies of Broken Hill (7122c7bd-f6fa-43f0-828a-39df96a7a19e)

    B. P. Thomson (South Aust. Dept. of Mines): Dr. A. B. Edwards presents in the published discussion on the above paper, his interpretation of the dolerite dyke-lode relationship as a major objection to

    Jan 1, 1959

  • AUSIMM
    The Upgrade of the Ore Haulage Facilities at Z.C. Mines, Broken Hill

    A Feasibility Study to determine the future of ZC Mines was completed in mid 1987. Early in this study, which lasted two years, it was identified that significant reductions in treatment costs would r

    Jan 1, 1988

  • AUSIMM
    Preparation of Low Ash Coal for Carbonization and Conversion Processes

    Properties of coal which are significant in relation to preparation for carbonization and conversion are reviewed, and existing coal preparation technology which has been used for production of cleane

    Jan 1, 1980

  • AUSIMM
    Tubular Steel Headframe for Winze Sinking at North Broken Hill Ltd., Broken Hill

    Winzes are usually sunk 9 ft. 6 in. long by 6 ft. 0 in. wide and are divided into two compartments, 4 ft. 0 in. by 5 ft. 0 in. inside the timbers. The general practice is to sink the winze to a depth

    Jan 1, 1941

  • AUSIMM
    Operation of a Rapped Sieve Bend

    By Firth B. A

    The classification performance of a Dutch State Mines (DSM) Rapped Sieve Bend has been investigated in a series of experiments. Coal slurries of a nominal 0.5 mm size were classified in the separation

    Jan 1, 1983

  • AUSIMM
    The Breakdown of Shales in Water

    By Whitmore R. L

    The action of water on a number of Queensland shales which are associated with particular coal measures and oil shales has been studied. The results suggest that the disintegration of some of the shal

    Jan 1, 1982

  • AUSIMM
    Path Planning and Position Control for Autonomous Loading Operation by Wheel Loader

    Authors have been conducting research on autonomous loading operation by wheel loader. Autonomous loading cycles has been demonstrated with real size experimental model. In V shape loading operation,

    Dec 6, 2010

  • AUSIMM
    A Convenient Index for the Assessment of Coal Cleaning Processes

    By Nicol S. K, Firth B. A

    Much effort over the years has been put into the task of devising parameters which adequately assess the metallurgical efficiency of mineral processmg operations. One of the most celebrated of these m

    Jan 1, 1978

  • AUSIMM
    Leaching Studies with Pentlandite and Pyrrhotite

    By Lavers G

    Factors governing the dissolution of nickel and iron in pentlandite and pyrrhotite concentrates from Mt. Windarra were studied for aqueous solutions at normal temperatures and pressures. The effects o

    Jan 1, 1976

  • AUSIMM
    Tungsten at Hatches Creek, Central Australia Mining and Treatment

    Local conditions at Hatches Creek are described, together with the mineralogy, mining and treatment of tungsten ores, with particular reference to procedures adopted by Pimer Mines, N.L.The Hatches Cr

    Jan 1, 1955

  • AUSIMM
    Different Methods of Alluvial Mining in Victoria

    Amongst representative men directing alluvial mining of erations in Victoria, some difference of opinion exists as to the best system of working the deep leads. The developmental operations of shaft-s

    Jan 1, 1902

  • AUSIMM
    The autonomous rail conveyor significantly reduces ore haulage costs

    By T Graham

    The invention of the traditional belt and idler conveyor system is attributed to Thomas Robins in 1892. This basic concept, ubiquitous in most mining operations, has not changed markedly in 125 years

    Jul 24, 2017

  • AUSIMM
    Drilling and Blasting at Mount Morgan

    By McIntosh A. H, Torlach J. A

    Since the last paper on mining methods was presented to the Annual Conference of the Australasian Institute of Mining and Metallurgy in 1:960, numerous advances have been made in drilling and blasting

    Jan 1, 1965

  • AUSIMM
    Water, By-Products and the Environment

    A Good Product Range - So What! While in terms of water, waste management and environment protectrion, the Gippsland Basin may appear to have a good product range, what does this really mean? What i

    Jan 1, 1992

  • AUSIMM
    Optimum scale of an open pit operation: discount rate and risk

    For a large scale open pit mining and concentrating operation, on a low-grade disseminated ore body, it is possible to set an approximate lower bound on economically feasible operating scales and an a

    Jan 1, 1986