    Pile Installation Overcomes Numerous Problems At Rocket Motor Component Manufacturing Facility - Introduction

    By Jon H. Gould

    This paper describes the following at the new Advanced Solid Rocket Motor (ASRM) nozzle manufacturing facility, which is being constructed inside an existing manufacturing facility: 1) generalized sub

    Jan 1, 1992

  • NIOSH
    Formula Predicts The Spontaneous Combustion Potential Of Bituminous Coals ? Objective

    To predict the spontaneous combustion potential of bituminous coals using a simple expression based on an easily acquired coal property. Background Approximately 20% of underground coal mine fir

    Jan 1, 1989

  • SME-ICGCM
    Ground Movements Associated With Pillar Extraction Coal Mining In Northern West Virginia (38f818ad-9d3b-4ecb-b624-667cef121309)

    By Robert W. Bruhn

    An investigation was male of ground response to pillar retreat mining in a 1.7 meter thick seam at 108 meter depth at a site in northern West Virginia. This paper describes mining-related stress chang

    Jan 1, 1984

  • NIOSH
    RI 7761 Physical Aspects Of Copper Cementation On Iron

    By Walter W. Fisher

    A study of copper cementation on iron was initiated to determine the effect that deposited copper has upon subsequent cementation. A microscopic investigation of cementation on an iron surface showed

    Jan 1, 1973

  • ISEE
    Effects of Aggregate Production Blasting on an Adjacent 42” (1.067m) Pipeline

    By John Babcock, Bryan C. Smith

    In a partnership between Luck Stone Corporation and Loudoun Water, a 42” (1.067m) steel pipeline was constructed along the perimeter of an extensive permitted reserve of diabase rock Luck Stone was ab

    Jan 1, 2019

  • AUSIMM
    Modified Nano-filtration Membrane Treatment of Hyper-saline Goldfields Water – An Overview and Benefits to Gold Plant Operation and Economics

    By N Stoitis, L Lien, B Tapley

    The treatment of hypersaline waters originating from numerous gold projects within the Western Australian Goldfields region via membrane technology has been assessed. A combination of Ultra-filtration

    Sep 7, 2015

  • AUSIMM
    Rock fill consolidation for the extraction of sill pillar stopes at Toguraci gold mine

    By A Proudman, J Isles, R Lawolo, G Forster

    PT Nusa Halmahera Minerals (PT NHM) is an Indonesian joint venture company owned by Newcrest Mining Limited (75 per cent) and PT Aneka Tambang (Persero) (25 per cent). PT NHM operates two underground

    Oct 16, 2017

  • CIM
    Selective Highwall Mining at the Dome Open Pit Mine

    By J. G. Henning

    Following completion of planned mining operations at the Goldcorp Dome Open Pit Mine, a high-grade Shaft Pillar located in the pit highwall was recovered. Mining of this Shaft pillar faced numerous ro

    May 1, 2009

  • SAIMM
    7.1 Spangenberg - Sampling Standards In Anglogold Ashanti Gold Mines In Sa

    By Conné Spangenberg

    Contents ?Introduction ?Metal accounting environment ?Problem statement ?Investigations & Achievements ?Metal Accounting ?Principles ?Standards ?Audits ?Questions

    Jan 1, 2005

  • DFI
    Integrity Testing - Friend Or Foe?

    By Bernard H. Hertlein

    Transportation system structures have come under very close scrutiny in the last couple of years, largely due to the damaging effects of disasters, both natural and man-made. In the Pacific northwest

    Jan 1, 1998

  • CIM
    Performance Enhancement of Semi-Autogenous Grinding Mills Through the Use of Instrumentation Based on Acoustic Signals

    By David G. Almond

    "Economies of scale and the variable characteristics of many large ore deposits have resulted in grinding installations having large SAG mills fitted with variable speed drives. Problems associated wi

    Jan 1, 2005

  • AIME
    Institute of Metals Division - The Study of the Structural and Transformation Characteristics of the Pressure-Induced Polymorphs in Bismuth

    By T. E. Davidson, A. P. Lee

    It is known from the early work of Bridgman that the two lowest-pressure transitions (I-II and II-III) are accompanied by substantial and abrupt changes in resistivity and Volume. However, unlike the

    Jan 1, 1964

  • NIOSH
    OFR-14-76 Data Flow Requirements For Remote Supervisory Control Of Continuous Mining Machines - I. Introduction - A. Summary - 1. Objective

    By Harvey L. Pastan

    The purpose of the investigation and analysis described in this report is to assess the data flow requirements that are required for remote supervisory control of a continuous mining system. Since the

    Jan 1, 1975

  • NIOSH
    Liquid-Cooled Clothing For Hot Mine Rescue Work - Objective

    Protect mine rescuers from heat-induced stress that drastically cuts their endurance and saps their strength. Approach To prevent exhaustion caused by thermal stress, a rescuer can wear a liquid

    Jan 1, 1979

  • NIOSH
    OFR-3-82 Monitoring Of Mine Air Diesel Pollutants: Tailpipe Emissions Measurement Apparatus, Detector Tube Interferences, And Exhaust And Ventilation System Control

    By John H. Johnson

    Diesel tailpipe CO, C02, NO, and N02 concentrations by the Emissions Measurement Apparatus (EMA) were found to compare satisfactorily with simultaneous concentrations by instruments in the MSHA engine

    Jan 1, 1980

  • DFI
    Design-Build of Watertight Underground Structures for Tunneling in Miami, Florida - The Norris Cut Utility Relocation Project

    By Eugene Mirsky, Eloy Ramos, May ElKhattab, John Wise, Terrence Carroll, Jose Torres

    In 2017, Nicholson Construction Company completed a $72.1 million design-build contract for Miami Dade Water and Sewer Department to replace an existing 54-inch diameter pre-stressed concrete force ma

    Jan 1, 2018

  • AUSIMM
    Recovery of the Undercutting Front in a Mine with Conventional Panel Caving – Case Study at North Reserves Sector, El Teniente Mine

    By N Rivera, A Music, C Cisternas

    In an underground mine operated with panel caving and subjected to high stresses, geotechnical events such as collapses or rock bursts are fairly recurrent. Both situations can involve risks for peopl

    May 9, 2016

  • IOM3
    Framework for modelling of metallurgical processes

    By W. R. Paterson, W. Morton, D. B. Cameron

    The Massbal II computer simulation program has been used to develop a general framework for the building of thermochemical models of metallurgical processes. The framework allows the rapid, simple con

    Apr 1, 1991

  • SME
    Partially Fluxed Pellets With Low Silica For Blast Furnace at Samarco Mineração S.A.

    By J. A. M. Cano

    Since the beginning of operations at the pellet plant at Ponta Ubu ES, Samarco Mineração SA has produced pellets for direct reduction and blast furnace processes. Of the total amount of pellets produ

    Jan 1, 1995

  • NIOSH
    IC 6798 Sand And Gravel Excavation; Part I: The Power Shovel, The Dragline Excavator, And The Excavator Crane ? Introduction

    By J. R. Thoenen

    This circular is the third of a series summarizing the technical problems involved in the production and preparation of sand and gravel. The first, Information Circular 6668, published in December 193