Search Documents

  • NIOSH
    IC 6709 Mining Methods And Costs At Granada Gold Mines (Ltd.), Rouyn, Quebec ? Introduction

    By R. L. Loofbourow

    The adjacent towns of Rouyn and Noranda, centers of the Rouyn mining district of western Quebec, are 360 miles by air line almost duo north of Toronto. Rouyn is reached from the main lines of the Cana

    Jan 1, 1933

  • AUSIMM
    Chlorine Based In-Situ Leaching of Alluvial Gold Deposits

    Alluvial mining even of shallow deposits is often economically a marginal proposition and causes significant disruption of the land surface through the need for large scale excavation. In-situ leach

    Jan 1, 1992

  • SME
    Grade Estimation And Its Precision In Mineral Resources: The Jackknife Approach

    By M. G. Hester, G. S. Adisoma

    To address the problem of grade estimation in a general three-dimensional shape and the uncertainty associated with the estimate, the technique of jackknifing/ block-kriging shortcut is proposed. A ne

    Jan 1, 1997

  • AIME
    The Annual Dinner

    By AIME AIME

    WEDNESDAY night, by long tradition, is al- ways set aside for the annual dinner, even when, as it was this year, it is Ash Wednesday. Whether the somewhat smaller attendance than last year is attribut

    Jan 1, 1931

  • AIME
    Influence Of Geophysics And Geochemistry On The Professional Training Of Geologists

    By W. C. Krumbein

    GEOLOGICAL problems are approached from a geometrical (space relations) viewpoint, a kinematical (time sequence) viewpoint, or a dynamical viewpoint. The first two require sound training in convention

    Jan 1, 1941

  • NIOSH
    RI 5105 Beneficiation Studies Of Columbium-Tantalum-Bearing Minerals In Alluvial Black-Sand Deposits ? Introduction

    By J. E. Shelton

    This presentation covers the results of laboratory studies conducted by the Bureau of Mines Mineral Dressing Section, Northwest Electrodevelopment Laboratory, Albany, Oreg., on alluvial sands from Dis

    Jan 1, 1955

  • SME
    Stress Redistribution Determination Through Coupled Laboratory Testing And Numerical Modeling

    By Rudrajit Mitra, Wesley B. Johnson, Erik C. Westman

    The ability to understand stress redistribution within a mine allows greater extraction efficiency with reduced safety concerns. Stress redistribution has been examined at the laboratory scale using u

    Jan 1, 2005

  • SME
    New Developments In The Recovery Of Manganese From Lower-Grade Resources (444eb20b-69a4-4c4b-b903-e25e4ea9e5f8)

    By N. Chow

    The recovery of manganese from lower-grade resources has been studied for a number of years. Of key importance in prior work was the discovery that higher-valent manganese can be readily leached with

    Feb 1, 2012

  • CIM
    Pit Design by Computer at Gaspe Copper Mines, Limited

    By F. J. Gauthier, R. G. Gray

    "The possibilities of expanding the production rate from the Copper Mountain Mine have been examined using computer programs for analysing a complete range of data, beginning with the diamond drill as

    Jan 1, 1971

  • SME
    Coal Preparation Projects In The UK

    By John Hillman

    The reconstruction of the British mining industry which began shortly after nationalisation in 1947 continued until well into the 1950s with the support of the Government. This support diminished as p

    Jan 1, 1978

  • SME
    The Interdependence Of Economic And Hydrologic Criteria In Planning Water Resources Development

    By S. W. Mao

    Hydrologic and economic criteria figure in many obvious ways in water resources development, but they are rarely linked quantitatively, and most of the applications are pertinent only to the case-in-p

    Jan 1, 1967

  • CIM
    Blind drilling for shaft development

    By James H. Cobbs

    Blind boring of shafts is becoming an increasingly important part of shaft sinking. Blind-bored shafts have reached diameters of 25 It in Europe and 16-1/2 ft in the United States. Much of the technol

    Jan 1, 1979

  • CIM
    Where Are We Going In This Hand Basket?

    By Lawrence Devon Smith

    What is a Failed Project? For mining projects, some key indicators of a ?failed? project are: ? Cost is more than it should be (particularly capital) ? Schedule ? It takes longer to build than exp

    May 1, 2010

  • NIOSH
    RI 7854 Dispersion of Dust in a Channel by a Turbulent Gas Stream

    By C. C. Hwang

    The Bureau of Mines formulated a method for calculating the concentration of entrained dust from a dust deposit by a turbulent gas stream. In particular, a diffusion equation is used to calculate dust

    Jan 1, 1974

  • SME
    Impact of High-Speed Operation on Tunnel Planning - NAT2024

    By Bernd Hagenah, Petr Pospisil, Colin Santangelo

    This paper explores the profound implications of high-speed train operation on tunnel planning, specifically investigating ongoing high-speed rail projects in California and Texas. The paper delves in

    Jun 23, 2024

  • AIME
    A New Method of Weighting Core and Cuttings in Diamond Drilling

    By Josiah Royce

    To evaluate chemically the sample of rock obtained by diamond drilling, it has long been recognized that the analyses of the two components of the sample, core and sludge, must be given appropriate in

    Jan 1, 1949

  • NIOSH
    RI 5873 Continuous Analysis Of Helium In Natural Gas By Chromatography ? Summary

    By C. L. Klingman

    In extracting helium from natural gas at Bureau of Mines helium plants, a continuous analysis of the helium content of inlet and outlet gas streams is required to determine extraction efficiency. An a

    Jan 1, 1961

  • AIME
    Microseismic Monitoring for Underground Stability

    By Wilson Blake

    Rock deformation and failure taking place around underground openings is usually both accompanied and preceded by the phenomena of rock noise or microseismic activity. These small-scale releases of se

    Jan 1, 1983

  • AUSIMM
    Prediction of Burden at the Sungun Copper Mine by Artificial Neural Network

    By H Khoshrou, A Siamaki

    Blast designs can have productive and non-productive impacts on downstream stages, mine productivity and operating costs. On the other hand, ground vibration, fragmentation, and back break caused by b

    Sep 26, 2011

  • TMS
    Some Challenges In The Nitride Metallurgy: Synthesis Of Complex Nitrides, Phase Equilibria And Chemical Potential Measurements (Invited)

    By Toru H. Okabe

    As part of a systematic study on the thermodynamic properties of complex nitrides, phase equilibria of the system Li-M-N (M Mg, AI, Ga) at 900 K were investigated. An attempt to determine the thermody

    Jan 1, 2003