Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Multiple Seam Highwall Mining In Appalachia (428a0473-c28a-4ef9-81d1-1ed7e6911c69)

    By David Newman

    Multiple seam underground coal mining is ubiquitous in Appalachia. Many coal properties have from two to ten or more economically mineable coal seams. Because of the ability to penetrate 600-feet to

    Jan 1, 2009

  • SME-ICGCM
    Investigating Abutment Load

    By Ihsan Berk Tulu

    In the Analysis of Retreat Mining Pillar Stability (ARMPS) program, the magnitude of the abutment loading adjacent to a gob area is calculated using an ?abutment angle? concept. The extent of the abut

    Jan 1, 2012

  • SME-ICGCM
    Three-dimensional FEM analysis to sale field measurements from deep mine accessways

    By M. J. Beus

    A shaft is truly the "lifelinen of an underground mine. Damage to the shaft lining and guides as a result of ground movement can result in serious loss of production and extensive and continual repair

    Jan 1, 1989

  • SME-ICGCM
    Prediction of surface movement with emphasis on horizontal deformation due to mining

    By Mao Bai

    In predicting the integrity of under-mined structures, surface horizontal displacements and curvatures are frequently of greater importance than the more homogeneous vertical displacements. Accurate e

    Jan 1, 1989

  • SME-ICGCM
    Numerical Modeling for Roadway Support Systems ? A Comparison for Single and Multiple Seam Mining

    By Axel Studeny

    Geomechanical-numerical methods are an established tool for planning of underground excavations worldwide. By describing the interaction between heterogeneous layered strata and support elements it is

    Jan 1, 2007

  • SME-ICGCM
    Ropes mine crown pillar rock mechanics

    By W. G. Pariseau

    A crown pillar cave occurred at the Ropes Mine in December, 1987, that resulted in closure of the mine. Production was resumed soon afterwards with the formulation of a rock mechanics plan designed to

    Jan 1, 1989

  • SME-ICGCM
    Development and Application of Geotechnical and Rockmechanical Standard Planning System for Roadway Development in German Coal Mines

    By K. H. Brandt

    A standard planning system for the development of roadways was adopted for German coal mines based on the results of geotechnical and rockmechanical investigations. Its goal is to provide for sufficie

    Jan 1, 2004

  • SME-ICGCM
    Analysis of Small-Scale Thrust Faults and Their Effect on Coal Mining in Southern West Virginia

    By Thomas Z. Jones

    Deep mining within the Sewell Coal member of the New River Formation in southern West Virginia has exposed several small-scale thrust faults and related features. The faults were en- countered in West

    Jan 1, 1986

  • SME-ICGCM
    System behavior analysis of the ground movement around a longwall

    By Jian Wu

    In this paper, the surrounding rocks and the supports in a longwall are taken as an integral, i.e. a system. The structural characteristics and behavior of the system are discussed based on in-situ ob

    Jan 1, 1989

  • SME-ICGCM
    Recent UK Experience of Working above Previously Extracted Longwalls

    By David Bigby

    In the UK, it is becoming increasingly necessary to open new longwall mining areas above old, abandoned workings. In such cases, strategic and gate roadways must often be driven and maintained acros

    Jan 1, 2007

  • SME-ICGCM
    An analysis of roof-pillar-weak floor interaction in partial extraction room-and-pillar mining

    By W. M. Pytel

    The applicability of the beam theory in analysis of roof- pillar-weak floor interaction in partial extraction room-and-pillar mining is presented. The mine structure is modeled as an equivalent multi-

    Jan 1, 1989

  • SME-ICGCM
    Trail Mountain Mine: A Case Study For Improving Locations Of Mining-Induced Seismicity With Double-Difference Relocation (2de3a4ff-91be-4a02-947a-fc4fd7ffaac8)

    By Eleanor Sonley

    In October 2000, temporary seismographic stations were installed above the Trail Mountain Mine, Emery County, Utah, USA to supplement a regional network. Over seven months, 1826 mining-induced seismi

    Jan 1, 2009

  • SME-ICGCM
    Evaluating Coal Pillar Mechanics Through Field Measurements (a8e6d7f0-5b83-40bc-b63c-ddaae2b3a526)

    By Anthony Iannacchione

    Designing coal pillars to provide resistance against overburden loads has long been an aim of rock mechanics engineers. The need for accurate pillar strength models has become more urgent as greater o

    Jan 1, 1992

  • SME-ICGCM
    Caving, Seismicity, and Mine Design in Four Utah Mines

    By Hamid Maleki

    Having developed a methodology for estimating mining-induced seismicity resulting from slip along geological discontinuities in 2003, in this paper, the importance of measurements are high-lighted in

    Jan 1, 2006

  • SME-ICGCM
    Performance Evaluation Of A Cable Bolted Yield-Abutment Gate Road System At The Crandall Canyon No. 1 Mine, Genwal Resources, Inc., Huntington, Utah

    By J. R. Koehler

    Although two-entry yield pillar-based gate roads supported by wooden cribs have been commonly used throughout longwalling in the Wasatch PlateadRoan Cliffs coalfield of central Utah, a three-entry yie

    Jan 1, 1996

  • SME-ICGCM
    Airbag Support for Ground Control in Thin Seam Coal Mining

    By Fan Shaogang

    In this paper, the airbags' structure and technical characteristics and its applications in China are described. Based on the practice of the airbags in mining thin seams, the effects on ground c

    Jan 1, 1997

  • SME-ICGCM
    Roof Control Under Conditions of Shallow Depth and High Horizontal Stress Field -A Case Study

    By Yajie Wang

    Traditionally, roof falls are usually attributed to bad roof strata and high vertical stress related to the overburden depth. However, roof falls under shallow overburden depth are oflen caused by a h

    Jan 1, 1998

  • SME-ICGCM
    A Hydrogeomechanical Study Of Overburden Aquifer Response To Longwall Mining

    By G. J. Hasenfus

    This paper presents the results of an extensive hydrological and geomechanical monitoring program which Gas conducted at a longwall coal mine in W. Va. The field program included monitoring of groundw

    Jan 1, 1988

  • SME-ICGCM
    Feasibility Study And Design Of A New Underground Coal Mine Developed From Open Cut Highwall In Indonesia (25d3d094-fa9d-4970-a166-6a4fe20badce)

    By Takashi Sasaoka

    About 200 M tons of coal were imported into Japan in 2007 and Indonesia was its second largest exporter, accounting for about 30 M tons (12% of the total imported coal). Indonesia produced about 200 M

    Jan 1, 2009

  • SME-ICGCM
    Bi-Directional Shield Recovery in a Wide Face Longwall Move with a Pre-Driven Recovery Room under Weak Roof Conditions

    By Peter Zhang

    Shield recovery in a longwall move is normally conducted from tailgate to headgate. However, if the face is wide and the immediate roof is weak, difficult conditions with considerable roof sag, excess

    Jan 1, 2007