Probabilistic Approach to Coal Pillar DesignBy Ben Fahrman
The classical approach to engineering design involves the purely deterministic calculation of the factor of safety, the ratio of strength to stress. The factor of safety is an easy calculation to perf
Jan 1, 2013
-
Measurements of Horizontal Shear Movements Ahead of Longwall Mining and Implications for Overburden BehaviourBy Jesse Puller, Ken W. Mills, Owen Salisbury
"An underground coal mine located in New South Wales has a target coal seam located 160-180 m deep directly below a 16-20 m thick conglomerate unit that has been associated with significant periodic w
Jan 1, 2015
-
Review of Evaluation and Design of Secondary Support Performance in Longwall Ventilation EntriesBy Erik Westman, Benjamin Mirabile
"Quantitative evaluation of secondary support performance in longwall tailgates in U.S. coal mines was introduced with the U.S. Bureau of Mines (USBM) Wood Crib Performance Model. This model evaluated
Jan 1, 2018
-
Understanding the Connection between Blasting and Highwall StabilityBy R. Quentin Eades, Kyle Perry
"Surface mines continue to implement highwalls for several reasons, such as increasing recovery, improving margins, and justifying higher stripping ratios. Highwall stability is a complex issue that i
Jan 1, 2018
-
Optimizing Drilling Parameters for Improved Bolting Safety and PerformanceBy Darin Cotton, Tim Burgess, Tim Martin
"As the leading US supplier of roof control drills, J. H. Fletcher and Company® has encountered an extensive set of roof strata challenges and has overcome various drilling issues by varying machine p
Jan 1, 2015
-
Slope Stability at Open Cut Mining Due to Subsidence on Old Underground Mining AreaBy Andre Zingano
An underground mine using room and pillar and retreat mining methods was developed during the 1950?s. In 2009 an open cast mine was opened in the same reserve with the objective of mining five coal se
Jan 1, 2013
-
Multi?stage Testing Procedures, Verification, and Results for Strong, Brittle SandstoneBy Michael Murphy
A multi-stage triaxial procedure has been developed for the enhanced servo controls and feedback systems at the National Institute for Occupational Safety and Health (NIOSH) rock mechanics laboratory.
Jan 1, 2014
-
Numerical Modeling the Interburden Impact on Multiple-Seam Coal Mining in Western ChinaBy Jimin Su, Enguang Zhu, Kangning Zhang, Yang Li
"The effect of interburden on overlying strata movement during the mining of a lower group coal seam is still a challenge in China. Based on the multiple coal seams in western China, numerical simulat
Jan 1, 2017
-
New Developments in the Area of Influence of Longwall ExcavationsBy Denise Weber, Jürgen Kateloe, Marku Papst, Laurenz Preusse, Axel Preusse
"The angle of draw (in Germany, referred to as Limit Angle) plays a significant role in the field of mining subsidence engineering. This applies both to the assessment of the affected area by undergro
Jan 1, 2015
-
Challenges in German Subsidence Research—Retrospectives and PerspectivesBy Denise Müller, Axel Preusse
"Due to multilateral underground use, mining subsidence is discussed more and more with regard to issues other than mining, such as post-mining topics, storage, or geothermal use. These discussions an
Jan 1, 2018
-
The Slope Stability Assessment in the Wall Overlooking the Sungun Copper Concentrator PlanBy S. Mehrdad Heidari
The concentrator plant is located near a very high (105m), large (- 500m) and steep (a, > 45' ) wall. Geologically, the wall was composed of very complicated formations and broad range of soils a
Jan 1, 2005
-
Improved Pull out Strength of Fully Grouted Roof Bolts through Hole Geometry ModificationBy Luis Giraldo
Rock bolt installation characteristics near roof falls have been identified as contributing to failure. One documented and regularly occurring failure mechanism is loss of anchorage between the grout
Jan 1, 2005
-
Merging Coal Mine Geologic Hazard Mapping with Mine Production Rates—Industry ExperienceBy Kevin Andrews, Scott Nelson, Terry Hamrick
"In the process of Geologic Hazard Mapping (GHM) for underground coal mining, geologists evaluate the effects of various geologic and geotechnical conditions to assist with optimization of mine produc
Jan 1, 2018
-
Half a Career Trying to Understand Why the Roof Along the Longwall Face Falls in from Time to Time?By Russell Frith
Probably the most expensive but least well understood roof falls in underground coal mining, are those that occur ahead of the powered supports in the centre of longwall face. Even small roof cavities
Jan 1, 2005
-
Highwall Control At Homestake's Open Cut MineBy Don Berger
Highwall scaling, bolting and technical blasting are important aspects in the remediation of existing highwall exposures. Proper planning, design and research are important first steps in the developm
Jan 1, 1996
-
Basics on the Dimensioning and the Extraction of Shaft Safety ZonesBy Anton Sroka
The dimensioning of shaft safety zones is a substantial task of mining subsidence engineering. On the one hand, the coal reserves in shaft proximity are to be mined as complete as possible, because th
Jan 1, 2005
-
Development of a Laboratory Facility for Testing Shear Performance of Installed Rock Reinforcement TendonsBy L. Mahony
This paper describes the design, construction and commissioning testing program for a laboratory facility at the School of Mining Engineering, UNSW, Australia, aimed at evaluating reinforcement tendon
Jan 1, 2005
-
Field Measurements of Overburden Strata Deformation Response to Longwall MiningBy Xinzhi (Thomas) Du
"In order to monitor the overburden strata deformation over a longwall mining area in the Pittsburgh Coal Seam, three boreholes were drilled across the longwall panel. Each borehole employed multiple-
Jan 1, 2018
-
Cemented Coal Gangue-Fly Ash Backfill TechniqueBy Baogui Yang, Jie Yang, Anthony Iannacchione
"The cemented coal gangue-fly ash backfill technique (CGFB) has commonly been used to control subsidence damage caused by underground coal mining. This paper discusses the CGFB backfilling process use
Jan 1, 2018
-
Longwall Shield Recovery, Using Phenolic Foam Injection for Gob Control As An Alternative to Recovery MeshBy James D. Pile
Following a methane ignition in the active panel of a longwall coal mine, the affected panel was successfully isolated from the rest of the mine. This allowed for the remainder of the mine to return t
Jan 1, 2013