Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    A Method For Establishing Site Specific Coal Pillar Design Guidelines

    By Winton J. Gale

    Coal mine pillar design formulae available to mine planners are typically based on relationships determined for specific site conditions. Application of these methods is difficult when other factors,

    Jan 1, 1992

  • SME-ICGCM
    Laboratory Studies on Creep Behavior of Grouted Tensioned Rebar in Weak Strata

    By Joseph Hirschi, Naga S. Y. Tirumalaraju, Aditya Mishra, Anthony (Sam) J. S. Spearing

    "Primary roof support in underground coal mines in the USA consists mostly of fully grouted passive rebar or grouted (partially or fully) tensioned rebar. Research conducted at two room-and pillar coa

    Jan 1, 2015

  • SME-ICGCM
    Quality Management For Grouted Rockbolts

    By Dieter Wittenberg

    The successful extension of the applications in which rockbolts can be used in the German coalmining industry is, because of the very great raining depth combined with a high degree of stress in the n

    Jan 1, 2000

  • SME-ICGCM
    Geotechnical Monitoring of Rock Mass and Support Behaviour around the UCG Georeactor: Two Case Studies in Polish Coal Mining Industry

    By Zbigniew Lubosik, Andrzej Walentek, Stanislaw Prusek, Sylwester Rajwa, Aleksander Wrana

    "Underground coal gasification (UCG) provides a solution to supply electricity from high ash coal or deep deposited seams. The coal is consumed in situ, and, accordingly, the ash is left underground.

    Jan 1, 2017

  • SME-ICGCM
    Single Point And Full Scale Laboratory Testing Of Timber Chock Construction

    By Jim Galvin

    4 and 6 point timber chock constructions are used extensively on both a systematic and spot basis by Australian longwall operators to support tailgate roadways. In 1996, the School of Mining Engineeri

    Jan 1, 2000

  • SME-ICGCM
    Tailgate Roadway Convergence: A Key Indicator Of Potential Ground Control Problems

    By Robert M. Cox

    Abrupt tailgate roadway ground failures, described as floor bumps, sometimes occur in the tailgate entry outby the face during the high-speed extraction of coal from mechanized longwall panels. These

    Jan 1, 1994

  • SME-ICGCM
    Development Cooperation Between Operator And Manufacturer - Point Anchor Resin Bolts

    By C. C. White

    Much benefit can be achieved by a mining company and a manufacturer if both parties can communicate effectively with each other and assist in product development; mutually beneficial ideas and product

    Jan 1, 1982

  • SME-ICGCM
    Bolt Load Changes During Initial Face Advance And Cross-Cut Breakthrough

    By Steve Signer

    The San Juan Mine and the National Institute for Occupational Safety and Health conducted a study to measure how development mining effected bolt loads. Twelve fully grouted, instrumented roof bolts w

    Jan 1, 2004

  • SME-ICGCM
    Critical Roof Span Approach To Selection Of Proper Coal Mine System

    By Antoni Kidybinski

    Coal mining both with longwall and room-and-pillar method often encounters severe operational difficulties due to had roof conditions. Rooffalls at entry cross-cuts or along the rib line in longwalls

    Jan 1, 1982

  • SME-ICGCM
    Study on Top-Coal Loss and the Optimum Drawing Interval of Longwall Top-Coal Caving Mining

    By Qiang Fu

    ABSTRACT This paper aims to identify the main issues concerning top-coal loss and the optimum drawing interval of LTCC (Longwall Top-coal Caving) mining by underground tests and DEM (Distinct Element

    Jan 1, 2002

  • SME-ICGCM
    Axial Performance of a Modified Fully Grouted Cable Bolt Tested with a New Laboratory Short Encapsulation Pull Test

    By Paul C. Hagan, Jianhang Chen, Serkan Saydam

    "Modified cable bolts are commonly used in underground mines due to their superior performance in preventing bed separation when compared with plain strands. To better test the axial performance of a

    Jan 1, 2015

  • SME-ICGCM
    Stepwise Support Technology For Extremely Soft Rock Roadway And Its Engineering Application

    By Xinchuan Xia

    Based on the stepwise strain features and the strength reduction law of the surrounding rock in extremely softrock roadway, this paper proposes a dynamic supporting principle. A new kind of stepwise r

    Jan 1, 2000

  • SME-ICGCM
    Case Study of Roof Behaviour and Conditions for Longwall Face Recoveries at Beltana No. 1 Mine, Australia

    By David Hill

    Over the last decade, Beltana No.1 Mine has generally been Australia?s most productive longwall operation, with a ROM output of 7.2 Mt in YEJ2007. Characteristically favorable roof conditions and low

    Jan 1, 2011

  • SME-ICGCM
    Application of New Void Detection Algorithm for Analysis of Feed Pressure and Rotation Pressure of Roof Bolters

    By Eric Keller, Jamal Rostami, Wenpeng Liu

    "Roof and rib instability is an important issue in underground mining. To optimize ground support design, enhance ground stability, and reduce the possibility of roof or rib failure with minimal use o

    Jan 1, 2016

  • SME-ICGCM
    Research on the rational structure of tensible rockbolt and the effect of surrounding rock reinforcement

    By Chao-jiong Hou

    The necessity of using tensible rockbolt in the roadway with soft rock, high in-situ stresses, mining influence and other complex conditions was discussed, the structures of three kinds of tonsibte ro

    Jan 1, 1989

  • SME-ICGCM
    Regional Horizontal Stress And Its Effect On Longwall Mining In The Northern Appalachian Coal Field

    By D. W. H. Su

    This paper presents the results of ill situ horizontal stress measurements using a Minifrac system in several northern Appalachian coal mines. The effect of stress magnitude and orientation on longwal

    Jan 1, 1995

  • SME-ICGCM
    Long Term Stability Of Mine Workings In Soft Floor Environment: Geomechanical Investigations At Cooranbong Colliery

    By Vasundhara

    Underground coal mining in soft floor environments has often led to strata control problems ranging from small scale issues such as floor heave which disrupts traffic and ventilation, rib spalling and

    Jan 1, 2001

  • SME-ICGCM
    Investigations into the Corrosive Environments Contributing to Premature Failure of Australian Coal Mine Rock Bolts

    By Elia Elias, Alan Crosky, Paul Hagan, Damon Vandermaat, Serkan Saydam, Peter H. Craig

    "The University of New South Wales (UNSW Australia) had been involved in the study of premature failure of rock bolts in Australian coal mines from the initial identification of the problem in 1999 (C

    Jan 1, 2015

  • SME-ICGCM
    Rib Access Boom for a Roof Bolter

    By Joe McQuerrey, William Kendall, Gene Wilson

    "Roof bolting is the standard for ground control in underground coal mining. Rib and truss bolting is just as important when conditions are less than desirable. As a manufacturer of roof drills, J.H.

    Jan 1, 2010

  • SME-ICGCM
    Control Mechanism of a Tensioned Bolt System in the Laminated Roof with a Large Horizontal Stress

    By Song Guo

    This paper will present the roof bolting finite element model developed at Jennmat Corporation used to study the control mechanism of the tensioned bolt system in the laminated roof with a large horiz

    Jan 1, 1997