Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The ZLD Treatment of Mine Impacted Water to Potable Water QualityBy J. A. Lombardi
"EXECUTIVE SUMMARY The use of membranes for the treatment of Acid-Mine-Drainage (AMD) water has been a 35 year mining industry quest that has only recently produced commercial scale Zero-Liquid-Discha
Jan 1, 2015
-
Tunnel Lining for Drill and Blast TunnelsBy Björn Johansson
"SUMMARY Every tunnel designer has to consider the power of water ingress when designing a new tunnel. Either you choose solutions with simple methods to divert the ingress water or a robust system wi
Jan 1, 2016
-
Innovative Support of Cross-Passage Openings in Segmented LinerBy Karel Rössler, Petr Vítek
"The Ejpovice tunnels in Czech Republic were built by EPBM in soft Clyashale, and in weathered profile with low soil overburden. The segmented liner at the cross-passage openings required support, whi
Jan 1, 2016
-
A New Potential Standard in Monitoring and Optimizing Deposit Control in Mining Process WatersBy W. J. González
With the increasing demand for minerals and the decline in the quality of ore reserves, technologies to maximize recovery are critical to a mine?s economic success. Many mining waters exhibit the pot
Feb 23, 2014
-
Next Generation Mine Planning: Advanced Scientific Approach to Optimize the Extraction SequenceBy D. Spitty
There are enormous complexities with mine planning and the problem itself presents a huge challenge to the existing mine planners performing this activity. Mine planning optimization supports planner
Feb 23, 2014
-
Novel Method to Locate and Profile the Bed in a ThickenerBy R. D. Cook, J. L. Johnson
"Measuring mud bed level in a sedimentation device is an important control variable. Methods used to date for this purpose have had limited success providing continuous, consistent measurements at a r
Jan 1, 2015
-
Project Optimization and Competitiveness Enhancement Trough an Intergrated Health and Safety Management – Safety for Construction Work UndergroundBy J. Herhold, S. Plaum
"Current and future operational processes in the mining and underground construction sector are under the influence of the prevalent competition and the acute necessity of optimization approaches conc
Jan 1, 2017
-
Streamlining Open-Pit Operations With Automated Equipment MonitoringBy M. Baumann
Operating and maintaining the heavy equipment used in open-pit mining operations is an ongoing challenge for mines. Typical operations employ a combination of shovels, wheel loaders, and haul trucks t
Feb 23, 2014
-
Remote Control And Monitoring Of Ventilation At The Henderson MineBy Bradley V. Nelson
A number of improvements in the ventilation system at the Henderson Mine have been made during the past several years. A key to these improvements was the installation of a computerized monitoring and
Jan 1, 1995
-
Filtration Of Mineral Concentrates With Outokumpu Ceramec Pc FiltersThe CERAMEC pressure filter is used for the filtration of fine materials whose cake moisture cannot be achieved with vacuum. Development work has been carried out to achieve a well-controlled cake for
Jan 1, 1999
-
The Role of Waste Rock Characterization in Mine Development and Permitting: An Operator’s PerspectiveBy R. H. Clarke
"INTRODUCTION Characterization of waste rock is frequently an oversight in mine planning which can contribute to significant delay in permitting and ultimately development. Thorough waste rock charact
Jan 1, 2015
-
Material Parameters and Who’s Influence on the Behavior in Backfilled MassesBy F. Schreiter
"One method to increase the exploitation rate of a mine is the use of backfill with residual materials in exploited areas. The backfilled material is meant to support both, the walls of galleries and
Jan 1, 2015
-
A risk-management approach to improve coal-pillar extraction - SME Transactions 2012By C. J. Bise, P. Bucks
Central Appalachian coal reserves are a valuable natural resource in high demand, both domestically and internationally, justifying efforts to increase percentage recovery through pillaring. Unfortuna
Jan 1, 2012
-
Artifact Reduced Localization of Uncertainty – Lipstick on a PigBy J. Boisvert, E. Daniels, C. Deutsch
"INTRODUCTION Conventional mine planning is performed on a single resource model at a selective mining unit (SMU) scale deemed appropriate for the deposit and mining method. Estimation methods such as
Jan 1, 2015
-
Upgrading the Coal Creek Trunk Sewer - RETC2021By Joseph Clare
It’s not the 1960s anymore. Upgrading wastewater pipelines in the current era demands the latest trenchless technology to minimize impacts. King County Wastewater Treatment Division in Seattle, Washin
Jun 13, 2021
-
The Pulp Rheology Of Some Australian Gold OresBy Janine L. Beazley, James H. Kyle
The effects of pH, pH modifier (lime or caustic soda) and cyanide on the pulp rheology of a number of ore types ranging from highly siliceous to highly kaolinitic has been investigated. All experiment
Jan 1, 1989
-
A New Era of Tunneling Planned for Houston—Going Deep to Solve Regional Water Supply, Wastewater, and Drainage Problems - RETC2021By Eric Hansen, Todd Wanless, Chris Mueller, Shannon Dunne, Scott Elmer
Between 2010 and 2018, Houston added more than 1 Million residents; the third largest rate of growth in the nation. With growth, the region faces new challenges with water supply, capacity of its wast
Jun 13, 2021
-
Historic Rock Tunnel Rehabilitation—Designing for the Unknown - NAT2022By Ryan Marsters, Adam Pring, Robin Dornfest
Raw water supply in the central Rocky Mountains often relies on trans-basin conveyance. Many of these older diversions incorporate high-elevation, miles-long tunnels driven over a century ago in hard
Dec 1, 2022
-
Reconciling Mine Plans with Mine Operations at Freeport-Mcmoran SierritaBy R. E. Vivas, J. Garcia
"INTRODUCTION Freeport-McMoRan is a leading international natural resources company that operates large, long-lived, geographically diverse assets with significant proven and probable reserves of copp
Jan 1, 2015
-
“They Want to Dig a 100-Foot Hole in Front of My House for Two Years!” - Community Mitigation and Outreach for DC Water’s First Street TunnelBy Carlton M. Ray, William P. Levy, Thomas Lindberg
"The District of Columbia Water and Sewer Authority (DC Water) is implementing its $2.6 billion DC Clean Rivers Project to reduce combined sewer overflows to the District’s receiving waterbodies and m
Jan 1, 2016