Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Mineral Processing—Responding to Economic and Environmental PressuresBy A. English, Edward Martinez, L. A. Haas, N. W. Johnson, Harrison Copper, M. E. Tawil, C. C. Harris, G. V. Jergensen, D. Halbe, M. P. Amsden
Declining US ore grades along with skyrocketing energy, materials, labor, and regulatory costs underscored the urgency for technological innovation in the mineral processing area. Re¬liance on the sca
Jan 5, 1980
-
Preserving The Retrieval Option In The Design Of High-Level Waste RepositoryBy N. S. Tanious
Retrievability of emplaced nuclear waste from the geologic repository is a performance objective imposed by Federal Regulations. This requirement is designed to provide confidence in the Department of
Jan 1, 1989
-
A Comparison Of Rock Deformability Measurements By Petite Sismique, The Goodman Jack And Flat JacksBy Z. T. Bieniawski
Results of in situ investigations are discussed providing comparisons of rock mass deformability measurements by three methods: 'petite sismique' technique, the Goodman borehole jack and fla
Jan 1, 1979
-
A Large Underground Opening Measured Versus Predicted Rock DeformationsBy Norman F. Sweeney, H. John Hovland
Over one million yards of granite were excavated for the Helms Pumped Storage Project, including a large underground powerhouse complex. Site investigations and in situ stress measurements were essent
Jan 1, 1981
-
Efficacy And Equity Of The Management Of Large Underground ProjectsBy Alan M. Muir Wood, Gerhard Sauer
There axe two essential features of administrative practices in tunnelling in order to provide proper encouragement to innovative and economic tunnelling: first, that there should be a continuity in t
Jan 1, 1981
-
Jim Walter Resources, Inc.'s Booster Fan Proposal - A Case StudyBy John W. Stevenson, Ted L. Sartain
Underground booster fan installations are currently employed in hundreds of coal mines throughout the world. Such installations, when properly designed and maintained, have proven to be safe and effec
Jan 1, 1989
-
Excess nonequilibrium collector adsorption and flotation ratesBy D. W. Fuerstenau
Experiments using an optically polished Pyrex disk and aqueous dodecylammonium acetate (DAA) films showed that the velocity with which the films recede increases markedly if the runs are repeated at s
Jan 1, 2002
-
The Study on the Micro-climate in a Mine Central Pump and Power StationBy Yiyin Ma, Yuqi Chen
Based on two in-situ measurements and mathematical analysis, the micro-climate in a large central underground pump and power station has been discussed in this paper. It is found from the research tha
Jan 1, 1991
-
Sharing Best Practices from Other Industries and Identifying the Gap Using the MaintenancescoretestBy C. Frenzel, N. Blechschmidt
"INTRODUCTION There is no doubt about the time and effort companies put in establishing and maintaining their equipment. However, the question about how these companies can map the benefits comes up.
Jan 1, 2018
-
Groundwater Control for Shaft and Tunnel Construction inSoft Ground at West Leg Interceptor Contracts 1R and 2,Cleveland, OhioBy Robert J. Auber, Thomas R. Scotese
The West Leg Interceptor is part of a new sanitary sewer system in the southwest suburbs of Cleveland. The first two construction contracts were excavated in glacial soils varying from hard tills to p
Jan 1, 1999
-
Small Scale Model Testing A New Approach In TBM DevelopmentBy Pieter Barendsen, Olivier Dubugnon
INTRODUCTION There are three fronts on which development efforts are being concentrated to extend the application domain of Tunnel Boring Machines (TBM), which is potentially very large - Assessme
Jan 1, 1985
-
Modern Engineering and Construction Methods in the Execution of Mineral ProjectsBy Edwin J. Connell, O&apos
Investment in mining and related process facilities will be more costly and complex in the 1980s than ever before. Interest rates and inflation are soaring; regulations are expanding; and in order to
Jan 10, 1980
-
Modified Approaches For High Pressure Filtration Of Fine Clean CoalBy J. G. Groppo, B. K. Parekh
Removal of moisture from fine (minus 28 mesh) dean coal to 20 percent or lower level is difficult using the conventional vacuum dewatering technique. High pressure filtration technique provides an ave
Jan 1, 1995
-
Core-shell Nanocomposites-New Materials for Functional FillersBy P. Somasundaran, T. Chen, Diptabhas Sarkar
We have developed a layer-by-layer deposition technique for preparation of nanocomposite particles. Using this process, it was possible to make nanocomposites of various oxides with desired local comp
Jan 1, 2003
-
Rock index properties for geoengineering in underground developmentBy J. E. Rourke, O&apos
This paper describes the use of index testing to obtain rock properties that are useful in the design and construction planning of an underground development for civil engineering or mining projects.
Jan 1, 1990
-
Heap Leach Construction Over Tailings SlimesBy William J. Attwooll
The development of gold heap leach projects in the Cripple Creek, Colorado, mining district has required utilization of heap leach pad sites other than relatively level natural ground. This paper desc
Jan 1, 1987
-
Inclined-Hole Drilling With Large Blasthole Drills Can Sometimes Be UsedBy Stuart R. Cotterill, Jack D. Nelmark
Introduction Opencast surface mining requires blasthole drilling to achieve mine planning. No single method of mining is right for all conditions. Occasionally, mine planners introduce a project with
Jan 9, 1984
-
Thermo-adhesive Separation - A Novel Dry Coal Beneficiation Technique - SME Annual Meeting 2022By D. P. Patil, B. K. Parekh
Water is the mainstay for beneficiation of fine size coal and minerals; however, it is also the least desirable constituent in the final product. The basic concept of the novel process described in th
Mar 2, 2022
-
Short-Term Planning In Sublevel Stoping Methods - IntroductionBy Fernando Muge
A complex pyrite orebody located in the South of Portugal (MO INHO) was exploited in the past by cut and fill methods until a certain level. It was decided to design a new plant for non ferrous met
Jan 1, 1979
-
Integrating Control Of Flocculant Delivery In A Phosphatic Clay Thickening CircuitBy S. Nygren
Nalco Chemical Company and a North Carolina Phosphate operation have formed a successful supplier/customer team effort that has resulted in major improvements in the operation of the clay thickening c
Jan 1, 1998