Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
OFS Branch (77a18226-8b49-4900-9b6e-8e81766e5988)OFS Branch Committee Meeting held in the Committee Room at the Welkom Club at 4.15 p.m. on Wednesday, 5th March, 1975. Progress in mineral dressing The National Institute for Metallurgy and the South
Jan 6, 1975
-
Importance of pore pressure monitoring in high walls - SynopsisBy K. L. Morton
Groundwater and associated pore pressure represent elements that can have a negative impact on surface mining and slope stability. Groundwater flow and deformation within a slope influence each other.
Jan 1, 2008
-
Avoiding structural failures on mobile bulk materials handling equipmentBy B. W. J. van Rensburg, M. J. Schmidt
Bulk materials handling systems are extensively used in the mining and minerals industry, where a fairly high incidence of structural failure is experienced, notwithstanding design compliance with app
Jan 1, 2015
-
Integrated Furnace Controls: Implementation On A Covered-Arc (Shielded Arc) Furnace At Cerro MatosoBy T. Gerritsen, R. C. Delgado, J. Janzen, E. R. Veloza
The paper describes the components of an Integrated Furnace Control system for covered-arc (shielded arc) smelting with results from the recently started 75 MW Cerro Matoso Line 2 Furnace. The paper s
Jan 1, 2004
-
Furnace Upgrade With Hatch Technology At Pt Antam FeNi-II IN Pomalaa, IndonesiaBy I. Jauhari, F. Stober, D. Fowler, B. O. Wasmund, T. Miraza, C. Nichols, A. Taofik Hidyat, K. Said
The existing PT Aneka Tambang (Antam) ferronickel smelter located at Pomalaa, Indonesia consists of two RKEF lines with reduction furnaces nominally rated at 17 MW and 18 MW, respectively. The low pow
Jan 1, 2007
-
A Comparison of Limit Equilibrium and Numerical Modelling Approaches to Risk Analysis for Open Pit MiningBy H. T. Chiwaye
Risk analysis is an important step in the design of rock slopes in open pit mining. Risk is defined as the product of the probability of slope failure and the consequences of the failure, and is gener
Jan 1, 2010
-
Energy considerations in the current PGM processing flowsheet utilizing new technologies ? SynopsisBy C. M. Rule
Energy efficiency is currently a significant area of interest due to the Eskom power situation, which led to severe power impacts to the PGM, and indeed whole SA primary industries, in early 2008. An
Jan 1, 2009
-
On Localizing Uniform Conditioning EstimatesBy O. Rondon
Localized uniform conditioning is a technique developed to spatially locate selective mining unit grades that have been derived using uniform conditioning for the assessment of recoverable resources.
Jan 1, 2014
-
Subsidence analysis and prediction based on a real caseBy B. Solar Menéndez, M. B. Díaz Aguado, I. Á. Fernández, C. González Nicieza
The analysis of subsidence due to the opening of an underground void (mining, water exploitation or civil works hole) is a problem usually hard to solve. First of all, it requires a predictive model,
Jan 1, 2003
-
Determining the value of additional drillingThe spatial distribution of copper grades at the Mansa Mina project is highly variable due to the presence of high grade copper/silver/arsenic breccia bodies. Copper grades within the breccia bodies t
Jan 1, 2003
-
Process flow sheet development for the Corridor Sands ProjectBy L. Rademeyer, P. Mazzoni, C. Kubank, F. Brown
The Corridor Sands deposits of heavy mineral sands represent the largest known economic resource of titanium dioxide minerals. The West Block of Deposit 1 alone contains Measured and Indicated Mineral
Jan 1, 2003
-
Experimental and numerical modelling of the tunnel face stabilityBy J. Trckova, P. Prochazka
Physical models from equivalent materials satisfying geometrical and physical similarity have been constructed. A special technology of simulating the excavation of an opening at the front part of a t
Jan 1, 2003
-
Improved Copper/Iron Selectivity in Solvent ExtractionBy J. J. Taute, G. Chisakuta, P. Bwando, G. Mitshabu
"BASF Mining Solutions have developed a new generation of copper solvent-extraction reagents that offer significant benefits over the existing reagents available to the industry today. Initial laborat
Jan 1, 2015
-
A heat transfer model for high titania slag blocks - SynopsisBy H. Kotzé
Titania slag is used as feedstock in the production of titanium dioxide pigment. It (titania slag) is the product of ilmenite smelting,a process whereby ilmenite is reduced at high temperature utilizi
Jan 1, 2010
-
Annual Mine Planning And Execution Buffering - A Safety Imperative ? SynopsisBy R. C. D. Phillis
The annual mine planning process is one of the most important tactical/operational steps towards achieving strategic goals. These tactical plans are part of a very comprehensive Mineral Resource Manag
Jan 1, 2011
-
Oxygen Activity Measurements In Simulated Converter Matte (e2a109c1-a92c-480a-aff7-b09fc199f5f7)By K. G. Tshilombo
It should be possible to use an oxygen probe to follow iron removal during converting, if local equilibrium is established between iron in the matte and the iron oxides in the fayalitic slag. The oxyg
Jan 1, 2007
-
Investigation Into How the Magnesia, Silica, and Alumina Contents of Iron Ore Sinter Influence Its Mineralogy and PropertiesThe influence of varying amounts of magnesia, silica, and alumina in iron ore sinter on its mineralogy, reducibility index (RI), reduction disintegration index (RDI), physical breakdown (AI and TI), a
Jan 1, 2010
-
Can Artificial Intelligence and Fuzzy Logic be Integrated Into Virtual Reality Applications in Mining?The University of New South Wales (UNSW Australia) has been a world leader in the development of innovative virtual reality technologies over the last 15 years. AVIE (Advanced Visualisation and Intera
Jan 1, 2014
-
Radio frequency propagation model and fading of wireless signal at 2.4 GHz in an underground coal mineBy A. Patri, D. S. Nimaje
Wireless sensor networks and wireless communication systems have become indispensable in underground mines. Wireless sensor networks are being used for better real-time data acquisition from ground mo
Jan 1, 2015
-
Developments Of Mechanized Technologies For Low Seam Height Mining In PlatinumBy P. Bracher
Most efforts to mechanize low seam (narrow reef) mining of platinum ore are presently based on board-and-pillar methods with1.6?1.8 m in reef excavation. This paper attempts to substantiate the benefi
Jan 1, 2003