Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Efficient Use of Explosives for Casing Advancement while Drilling

    By Vaughn Bowns, Allen Stanley, Brian Redeker

    "Running casing in drilling operations is often complicated by boulders or large cobbles.Past practices of dealing with these have included use of drop hammers, attempts to drillthrough or around the

    Jan 1, 1993

  • ISEE
    Vibration Control During the Construction of an In-Pit Lime Kiln

    By Paul Worsey, Ron Ecklecamp, Scott G. Giltner, Ronnie Inman, Terry Drechsler

    A blast monitoring program conducted at Chemical Lie Company’s new lime calcining facility near Ste. Genevieve, Missouri is discussed. The purpose was to develop blasting criteria for the construction

    Jan 1, 1996

  • ISEE
    Missouri S&T Experimental Mine Expansion and Associated Risk Safety Analysis

    By Patrick Cahill, Jacob Miller, Nolan Mundwiller, Catherine Johnson

    "The Experimental Mine at the Missouri University of Science and Technology is undergoing major developments. The underground workings are being expanded to include a ramp down to a second level which

    Jan 1, 2017

  • ISEE
    Shotrock Fragmentation Improve in Complex Lithology Condition

    By M. Syafiq Isnaya, Rahma Norfaeda, Slamet Rachman Jaka

    This paper is about project improvement to maximize energy distribution while ensuring beneficial blast results (reduce boulder condition). The main problem is how to manage complex lithology conditio

    Feb 1, 2020

  • ISEE
    Driving Continuous Improvement Through Blast Design Technologies in a Surface Quarry

    By Toby Forney, Joshua Schoonover

    In typical surface quarry operations, productivity and efficiency related to pit development begin with drilling and blasting efforts. By embedding technology within drilling and blasting operations,

    Feb 6, 2023

  • ISEE
    Value Beyond Blasting

    By Orica

    Unlicking the Possibilities ISEE Digital Detonator Workshop New Orleans, LA Wednesday, February 4, 2004

    Jan 1, 2004

  • ISEE
    Blasting Works Quality Management in Accordance with Environmental Conditions

    By Rolf R. Schillinger

    It is established to an increased extent that the basic questions about raw material extractions deal with water, dust, noise and vibrations. If it has not been definitely proven that these points won

    Jan 1, 2002

  • ISEE
    Quake, Quarry, or Quack

    By Dominic C, Gregory B. Poole

    On December 12, 2018 at 4:14 AM EST, an earthquake registering a 4.4 magnitude on the Richter Scale occurred in central Tennessee. According to a survey posted on the USGS website, this earthquake was

    Feb 1, 2020

  • ISEE
    Improving stope productivity with wireless initiation.

    By Luan Monteiro, Francisco Biulchi

    The AngloGold Ashanti - Cuiaba mine sought innovative approaches to minimize lateral development and stope extraction time while maintaining optimal gold recovery and minimizing dilution. The stope 8G

    Jan 21, 2025

  • ISEE
    Evaluating the Fragmentation Data from Copper and Gold Mines

    By Sedat Esen

    "This paper presents a critical review of the fragmentation data obtained from some large open pit copper and gold mines. Database ncludes 35 mines with Uniaxial Compressive Strength values ranging fr

    Jan 1, 2017

  • ISEE
    10th International Symposium on Rock Fragmentation by Blasting - Fragblast 10 (FB 10) 24-29 November 2012, New Delhi India

    By Agne Rustan

    The goal of this paper is to describe Fragblast 10 for those who did not have the opportunity to attend the Symposium and also give some examples of new research findings used in practise in some coun

    Jan 1, 2013

  • ISEE
    A New Way of Looking at Risk and QD Compliance

    By Lon Santis, Michael Swisdak, John Tatom

    The Institute of Makers of Explosives (IME) and A-P-T Research, Inc. (APT) have developed a quantitative risk assessment tool called IMESAFR (IME Safety Analysis for Risk) for managing risk from vario

    Jan 1, 2013

  • ISEE
    Technology for Risk Management and Decision Making in Civil Explosives

    By Johan Hawinkel

    This paper explores the journey through time of technology in the civil explosives market to provide testing, measurement, analysis and control tools. This ultimately leads to better decision-making,

    Feb 1, 2020

  • ISEE
    Technology for Risk Management and Decision Making in Civil Explosives

    By Davey Bickford, Johan Hawinkel

    Blasting and the use of civil explosives are a critical step in the mining process. Good decisions provide significant downstream benefits and create a safe and sustainable working environment, while

  • ISEE
    Use of Basic Statistics for the Overlapping Timing Analysis of a Single Blast Hole

    By Lifent Li, Jhon Silva-Castro

    Since millisecond-delay detonators were first introduced, at least two variables, among others, have been more closely considered when timing a mining blast: the accuracy and the precision of the init

    Jan 1, 2015

  • ISEE
    Half-Way House - Controlled Demolition Group "Rocks the Casbah" with Tricky Special-Effects-Laden Blast

    By Jane Wright, Brent Blanchard

    Question: When it comes to demolition projects, what could be more demanding than asking a blaster to explosively demolish a stubby, heavily-reinforced concrete structure in the heart of a third-world

    Jan 1, 2002

  • ISEE
    Drilling on the Taum Sauk Upper Reservoir Rebuild Project

    By Randall Head

    The drilling at the Taum Sauk Reservoir was a unique compilation of the latest technology and everyday common sense. This site is comprised of rhyolite, which is 30 times harder than limestone in comp

    Jan 1, 2010

  • ISEE
    Community Response To Airblast And Vibration From Surface Charges

    By L. Wilson, M. Kotzel, T. Pienaar

    An empirical equation is presented for the maximum airblast from unconfined charges. This has been tested at a number of sites and with charges ranging from 0.1kg to 311kg. The equation is developed t

    Jan 1, 2011

  • ISEE
    Journal: 100 Years / The Piercing of The Simplon The Century Magazine New York June 1905 / Driving Headings in Rock Tunnels

    By Robert Hopler

    THIS paper deals specifically with heading-driving as distinguished from the broader term tunnel-driving. A heading is a pilot or path-finder for the main tunnel. Some headings are complete tunnels in

    Jan 1, 2010

  • ISEE
    Improving open-pit blast design through rock hardness estimation and prediction based on Measurement-While-Drilling data: Applications in large copper mines in Chile.

    By Sebastián Seria, Jorge Álvarez, Diego Cáceres

    The capacity to break the rock into adequate size fragments and in a cost-effective way is one of the main challenges in large open pit copper mines in Chile. That capacity is often compromised by the

    Jan 26, 2026