Predicting Tunnel OverbreakBy P. R. Mohanty, Kaushik Dey
Blast-induced tunnel overbreak prediction in the past has been based on peak particle velocity measured far from the blast site with necessary extrapolation. This has often resulted in suggesting high
Jan 1, 2004
-
Flyrock Prediction and Control in Surface Mine BlastingBy J Lyall Workman, Peter N. Calder
Flyrock can be a serious hazard associated with blasting. Many surface blasting accidents involving injury result from excessive flyrock beyond the protected blast zone. Numerous cases of equipment da
Jan 1, 1994
-
Rock Drilling on a Vertical Wall: Problem solving at Crazy Horse MemorialBy Jeff Hermanson
Every construction project has site specific problems that need to be dealt with. These problems may be created by the geology, location, weather, time constraints, etc. Once these problems have been
Jan 1, 1996
-
Results of Blasting in Close Proximity to Water Wells at the Sleeper MineBy Roy Rose, Bruce Bowles, Wesley L. Bender
Numerous large diameter water wells are used to dewater the pit at the Sleeper Mine. Occasionally, a well will be located inside the boundaries of a blast. Although one might expect that wells so loca
Jan 1, 1991
-
Drilling Productivity and Total Drilling CostBy Karl Ingmarsson
A model for drilling productivity and total drilling cost is presented. It specifically addresses down-thehole drilling, but also covers other drilling methods. The important factors are: 1, productiv
Jan 1, 1998
-
Blasting for Underground UtilitiesBy James E. Jr Hargroves
With the ever-increasing population growth and modern trend to urban development, the expansion of utilities is a stable, mad or, and constant source of income for many. Blasting is a "necessary evil"
Jan 1, 1977
-
Computer Aided Design of Ring BlastsBy Calvin Konya, Theodore R. Myers, Robert Lundquist
The design of a single, large mass blast using ring drilling may take two to three months. This time requirement inhibits the evaluation of multiple designs. It also reduces the flexibility to redesig
Jan 1, 1990
-
Capture of a Groundwater Contamination Plume in Fractured Bedrock by an Artificially Produced Fracture Zone Created Through Controlled BlastingBy Robert J. Nothnagle, Kristen Franz Begor, Rodney W. Sutch
Recovery of contaminated groundwater in a fractured bedrock system presents some unique problems. Typically, the most common problem occurs from the inability to adequately characterize the discrete f
Jan 1, 1988
-
Blasting Techniques Used On The Clif Avenue Reconstruction ProjectBy Doug Hoy
The scope of the Cliff Avenue Reconstruction Project in Sioux Falls, South Dakota was to widen a two lane highway to five lanes, along with removing and reconstructing both above and below ground util
Jan 1, 1992
-
The Effect of Water Table on Peak Particle Velocities from Blasting OperationsBy Michael Beattie
A large open-cast limestone mine had its blasting operations severely restricted by the imposition of limiting PPV levels to protect a water pipe-line passing through the mine property. Attempts were
Jan 1, 1992
-
The Effect of Available Energy on Blast DesignBy Lyall Workman, P D. Katsabanis
Energy released by the explosive is typically partitioned in brisance, heave and losses. The fact that energy released in the P-V expansion curve below a certain point is lost has resulted in the conc
Jan 1, 1998
-
Boosters for ExplosivesBy E E. Cloete, R I. McCrindle
Permitted explosives were previously nitroglycerine based and cap sensitive. Due to safety, health and environmental requirements, water-containing explosives, such as watergels and emulsions, were us
Jan 1, 1999
-
Assessment and Mitigation of Ground Vibrations and Flyrock at a Limestone QuarryBy R M. Bhatawdekar, A I. Theresraj, H S. Venkatesh
Wadi Limestone Quarry is one of the largest captive mines of Associated Cement Companies Ltd, India. The mine management wanted to extend the excavation as close to the plant as possible for maximum e
Jan 1, 1999
-
Cost DeterminationBy Gary B. Hemphill
Estimators will agree that estimating for excavation is the most difficult costing task. Equipment costs and production rates are the toughest to determine. The following illustration is a method that
Jan 1, 1976
-
Experimental Investigation on Forced Transition of Gaseous Explosives from Combustion to Detonation in PipesBy Chen Aiping, Wei Banyun, Chen Canchang
"The gaseous explosives consisting of combustible gas and combustion-supporting gas wereused in the opening end of a steel pipe and the ignition was in the closed end of the pipeusing continuous air f
Jan 1, 1993
-
Blast Design Optimization to Minimize Effect of Air BlastBy Michail G. Egorov
As well as destruction and moving rock, the blast energy sets up a seismic wave in the ground and a shock wave in the air, which can present danger to buildings and disturbance to human occupants. Thi
Jan 1, 1996
-
Blasting-Induced Damage in CoalBy Kaby K. Kabongo
The paper is drawn from a project intended to explore a technique of prediction, control and optimization of fracture in coal induced by blasting. It evaluates the fines generated in coal submitted to
Jan 1, 1995
-
Effect of Geology on Burden DisplacementBy Rahim G. Haghighi, Calvin J. Konya
Fragmentation is the fundamental concern of rock blasting and it measures the effectiveness of blasting. Fragmentation is sensitive to not only the interrelationship among the design variables, but al
Jan 1, 1986
-
-
On the Influence of Powder Factor on Mucking RateBy Lina Lopez, Jose Sanchidrian, Manuel Lopez, Pablo Segarra
Previous work in which rock properties and blasting parameters (geometry, charging and timing) were reported together with truck filling times, is taken as a starting point for a thorough analysis of
Jan 1, 2008