Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Risk Management in Blasting: Lessons Learned the Hard Way

    By Ralph E. Burnham, Jeff Taylor, Jonson Montgomery, J. Kelly Ratliff, Rennie Montgomery, Martin Brashear

    Top priorities for all blasting companies and individual blasters are risk management, safety of company personnel and the general public, regulatory compliance, and liability protection. On a daily b

    Jan 1, 2018

  • ISEE
    Crystal Falls Dam Demolition and Protection Techniques Using an Air Curtain

    By Alex Chapman, Cam Thomas, Bryan Karney

    "During the early summer of 1989, Ontario Hydro removed a concrete portion of the North Channel Dam at Crystal Falls Generating Station by blasting and excavating in marine conditions. Because of the

    Jan 1, 1992

  • ISEE
    The Effect of Faults, Delay Time and Scaled Distance on Vibration Parameters

    By Enver Alan, MerkeziYapı

    People are migrating because of economic, social, natural and political reasons. These natural and humane factors effects the distribution of populations. The need for tunnels has grown in order to pr

  • ISEE
    Presplitting Techniques for Conventional, Air Deck and Dimension Stone Applications

    "The objective in controlled blasting is to reduce overbreak to control the final pit wall slope, shaft, drift ditch, bench, etc. to the final planned excavation limit. The six main types of controlle

    Jan 1, 1994

  • ISEE
    A Practical Approach to Managing Control of Flyrock

    By Simon St. John Tose

    We have had a long history in supporting the development of training material to ensure “safe” blasting. This has been provided as both significant technical guidance to the industry and input into th

    Jan 1, 2013

  • ISEE
    The Effects of the Topographic Bench on Ground Motion from Mining Explosions

    By Jessie L. Bonner, W. Stephen Blomberg, Mark Leidig, Heather Hooper

    Understanding the effects of the bench on ground motion can improve the design of cast blasts and achieve improved blast efficiency while remaining below vibration requirements. A new dataset recorded

    Jan 1, 2005

  • ISEE
    Crater Blasting Techniques and Designs in Compacted Soils

    By Patrick D. McLaughlin

    Crater blasting techniques have had relatively little application in the surface mining industry. This is not surprising, considering the geometry required to efficiently use cratering. The more widel

    Jan 1, 1992

  • ISEE
    Blast Designs and Controls in Steeply Dipping Coal Seams

    By Ricardo Gaviria, Vincinte Acosta

    There are major blast design and field procedures differences between conventional blasting in horizontally bedded coal seams and blasting underneath coal seams in a multi seam deposit with seam incli

    Jan 1, 1995

  • ISEE
    Application and Economics of Overburden Casting: Can it Work for You?

    By Conny Postupack

    To make money in mining coal you have to sell it for a lot more than it cost you to get it out of the ground. And yet, every year it cost us more and more to stay inbusiness, while the price we get fo

    Jan 1, 1990

  • ISEE
    Journal: Junction Chamber Blasting November 22,1999

    By Edward Walter

    Rock excavation for tunneling projects occurs on a regular basis in the Cleveland area. These tunnels are being constructed to increase the capacity of the sanitary sewer system. Controlled blasting m

    Jan 1, 2001

  • ISEE
    Garbage Plug Demolition Using a Low Detonation Velocity Explosive in “Presa Mixcoac” Dam, in Mexico City

    By Enrique Albarrán, Julian Hernández

    "In 1942 The “Presa Mixcoac” dam was built, along with 15 other dams, to control the rain fall waterin the mountains west of Mexico City. Mexico City’s population at that time was around 1.5 millionpe

    Jan 1, 2016

  • ISEE
    Applications of GPS and Equipment Monitoring Technology to Blasting Operations in Surface Mining

    The objective of current efforts by AQUILA Mining Systems Ltd. is the continued development of computer-based systems and techniques to automatically process and interpret monitored performance data f

    Jan 1, 1995

  • ISEE
    Computer and Centrifuge Modeling of Decoupled Explosions in Civilian Tunnels

    By Neil T. Davie, Thomas K. Blanchat, Thomas C. Togami, Joe R. Weatherby, Dale S. Preece, Robert A. Benham, James J. Calderone

    "Geotechnical structures ,such as underground bunkers, tunnels, and building foundations aresubjected to stress fields produced by..the gravity load on the structure and/or any overlyingstrata. These

    Jan 1, 1998

  • ISEE
    Immediate Internet distribution of vibration data from the historic Byward Market, Ottawa, Canada

    By Robert Lee, Jeff Corace, Rob Cyr

    Blasting in the heart of the historic Byward Market District of Canada’s capital, Ottawa, presents a unique set of challenges. The obvious difficulties arising on projects requiring blasting within 3

    Jan 1, 2006

  • ISEE
    A Model for Near and Far Field Blast Vibration Based on Multiple Seed Waveforms and Transfer Functions

    By Ruilin Yang

    Blast vibration in the highwall from a cast blast in open pit mines or in the hanging walls from a stope blast in underground mines is a common concern. Vibration in such cases is a typical near-field

    Jan 1, 2010

  • ISEE
    Journal: 100 Years / THE ST. MARY’S PARK TUNNEL, N.Y.C. & H.R.R.R.

    By Robert Hopler

    As a part of the depression and rectification work on the Port Morris branch of the Harlem Division of the New York Central & Hudson River Railroad, a short tunnel is being driven under St. Mary’s Par

    Jan 1, 2006

  • ISEE
    CEE BEE ZERO TWO Construction to Destruction - A Case Study

    By Deepak Vidyarthi

    This paper deals with various measures adopted in protecting a conveyor duct (named after a Conveyor Belt that was numbered as ‘02’) housing a 1600 mm (63 inches) belt conveyor system in a large, heav

    Jan 1, 2008

  • ISEE
    Measuring and Analysing Percussive Pulses to Extend Depth in Top-hole Percussion Drilling

    By Gary Cavanough, Stuart Addinell, Hector Parra

    Drilling deep, straight, accurate holes in hard rock to achieve efficient blasting is a challenge for the mining/quarrying industries with short holes normally drilled using “top hole hammer” (THH) an

    Jan 1, 2013

  • ISEE
    3D Computer Simulation of Bench Blasting with Precise Delay Timing

    By Dale S. Preece

    "Detonation delay timing has been an important aspect of quality rock blasting for decades. Detonators that enable delay timing have improved over the years especially with the recent advent of precis

    Jan 1, 2009

  • ISEE
    Design and Testing of Bubble Curtain at Whirl Bay, BC

    By Alastair Grogan

    In October of 2002, the author was retained by Public Works and Government Services Canada, on behalf of the Department of National Defense, to design, construct and test the effectiveness of a bubble

    Jan 1, 2005