Influence of Presence of Overlaying Sand on Rock Socket Length of Bored PileBy Priyadharshini M. R., Premalatha K
"Abstract With the development in the construction of heavily loaded structures, the necessity of pile foundations has increased. For the transfer of heavy loads, it is mandatory that the piles need t
Jan 1, 2014
-
Execution And Evaluation Of High Capacity Caisson Load Tests In Glacial DepositsBy Franklin M. Grynkewicz
As part of the Boston Harbor clean up project, the new 1,000 mgd Deer Island Sewerage treatment plant includes ten 240 feet high egg-shaped "residuals" tanks. Contract documents called for these struc
Jan 1, 1992
-
Evaluating Degree of Consolidation of Soft Soil by Using Asaoka, Hyperbolic and Back Analysis MethodBy Aminul Islam, Vinay M. Kumar
"About 100 Hectares of land reclamation over the very soft to soft marine clay at Uran Creek in Maharashtra is planned. The depth of marine clay varies from 10m to 24m as observed from the geotechnica
Jan 1, 2017
-
Bending Strength Of Threaded Micropile ConnectionsBy Steven R. Musselman
The bending strength and flexural stiffness of a micropile at its threaded connection is less than its intact strength and may fail due to thread slippage or by fracture through the pin (reduced cross
Jan 1, 2007
-
Evaluating Efficiency of Geo5 in the Analysis of Pile FoundationBy Elizabeth Varghese, Sanket Rawat, Prachuryya Kaushik, Ravi Kant Mittal
"Geo5 Software is gaining popularity worldwide due to its expediency in analysis and design of pile foundation. The analysis is based on various theoretical, empirical and semi-empirical methods avail
Jan 1, 2017
-
Deep and Shallow Soil Mixing for the SR-83/US-331 Choctawhatchee Bay Bridge Project in Santa Rosa Beach, FloridaBy Alessandro Bertero, Dylan Pearson, Wesley Schmutzler, Matteo Bertoni
"The SR 83/US 331 highway is located in the Florida panhandle, where it connects the Walton County beaches to the I-10 corridor. The roadway is of vital importance to the economy of the area as well a
Jan 1, 2017
-
Settlement & Vibration Monitoring For Transmission Line Foundation Installation: A Case HistoryBy R. Heath Forbes
The route of a new, 4-mile long, electrical transmission line passed through residential neighborhoods and commercial areas of a small town in the South Carolina Coastal Plain. The new line consisted
Jan 1, 2011
-
Drilled Pile Design and Installation Challenges in an Urban EnvironmentBy Satyajit Vaidya, Rudolph Frizzi, Luis Berroteran
This paper presents design and construction challenges associated with a high-capacity rock-socketed drilled pile foundation system for a 60-story building recently constructed in an urban environment
Jan 1, 2018
-
Performance Of A Large Diameter Drilled Pier (f4c3f0c8-a45b-48d0-8d0a-138a34a08ce3)By A. J. Partos
The figures and tables referred to herein are presented in the Proceedings; Volume I, Pages 309 through 316. The 61-story One Liberty Place, at 315 m., is the tallest building 1n Philadelphia and
Jan 1, 1991
-
Pile Load Testing Of Helical Piles And Driven Steel Piles In Anchorage, AlaskaBy Mohammed Sakr
The use of helical piles for permanent foundation applications has become a practical and feasible alternative to the traditional cast-in-place concrete or driven steel piles. Research and development
Jan 1, 2009
-
Compressive Behaviour of Hollow Core Micropiles in Cohesive SoilBy M. Hesham El Naggar, Osama F. E. Drbe
"Abstract: The use of micropiles has greatly increased the last twenty years, including applications involving low capacity micropile networks, seismic retrofitting, underpinning of existing foundatio
Jan 1, 2014
-
Drilled Shaft Difficulties and a Micropile SolutionBy Jeff Jackson, Paul Axtell, David Graham
The Montana Department of Transportation recently awarded a contract to construct a replacement bridge across the Clark Fork River in Heron, MT. Both abutments and both intermediate bridge bents were
Jan 1, 2018
-
Rigid Inclusions For Soil Improvement In A 76 Building ComplexBy Walter I. Paniagua
A housing complex of 76 buildings is being constructed in the city of Morelia, in western central Mexico; the buildings are 5 levels high, with a shallow concrete slab foundation. Soil conditions incl
Jan 1, 2008
-
Micropiles To Support Electric Power Transmission TowersBy Wendy L. Mathieson
The Bonneville Power Administration (BPA) will build about 500 miles of new 500-kV transmission lines in the next 5 years. Many new lattice towers will be built in remote locations or in environmenta
Jan 1, 2004
-
Stub Pier Stabilization PerformanceBy Swaminathan Srinivasan, Jess A. Schroeder
"Landslide activity along U.S. 50 in Cincinnati, Ohio (USA) has caused roadway damage for decades. After a necessary closure of three lanes due to slope movements, emergency stabilization measures wer
Jan 1, 2017
-
Soil Profiles Along The Alignment Of The I-880 Replacement ProjectBy Mark A. Willian
The purpose of this short paper is to present soil profiles and basic soils information for the portion of the I-880 Replacement Project alignment where highway structures are to be built. The informa
Jan 1, 1996
-
Session 31 "Grout Mixtures and Materials 2"By Lois G. Schwarz
I did not make studies about this parameter but I can say that some researchers recommend using low C3A cements to repair masonry mortar in order to reduce a possible combination with sulphate that ca
Feb 10, 2003
-
Positive Cut-Off Wall in Indian Dam – A New Technique for Difficult GeologyBy Steni Stefani, Sanjay Dave
"This paper describes an innovative method, used for the first time in India, for the construction of a 1.0metre-thick positive plastic concrete cut-off wall (CoW) at the upstream toe of the dam at th
Jan 1, 2017
-
Load Transfer And Capacity Of Drilled Shafts With Full-Depth CasingBy Rolf Katzenbach
Construction of drilled shaft foundations with the use of hydraulic oscillators and rotators to install temporary casing over the full depth of the shaft is described. The equipment and techniques we
Jan 1, 2007
-
Test Pile Program To Determine Axial Capacity And Pile Setup For The Biloxi Bay BridgeBy W. Robert Thompson
Hurricane Katrina caused significant damage to transportation structures on the Gulf coast in August, 2005, including the destruction of the US 90 Bridge over Biloxi Bay, Mississippi. Part of the suc
Jan 1, 2009