Organization
  • DFI
    A New Diaphragm Wall Technology Providing Mechanical And Watertightenss Continuity

    By P. Dupeuble

    Diaphragm walls, owing to their method of construction are discontinuous structures. A new technology for the construction of joints between panels has been developed. This new process allows for the

    Jan 1, 2010

  • DFI
    Open Well Caissons Of A 1917 Railroad Bridge: How 19th Century Construction Can Influence 21st Century Construction (f1b0a5f2-b1b8-41d4-bbfb-fab6f395e7a0)

    By Alan D. Fisher

    Amtrak made a decision to replace an aging bascule bridge with a vertical lift bridge for their crossing of the Thames River in New London, Connecticut. The new lift bridge occupies the same alignmen

    Jan 1, 2008

  • DFI
    A Comparison Of Open Drilled Shafts To Temporarily Cased Drilled Shafts In Clay Soil

    By W. Tom Witherspoon

    Many Engineers are skeptical and cautious about skin friction factors for the portion of drilled piers where temporary casing is used. This has led Texas engineers in many cases to eliminate skin fric

    Jan 1, 2009

  • DFI
    Short Comparison Of The Determination Of Allowable Loads Of Steel H-Piles Following The Practice Applied In Different European Countries - Synopsis

    By L. P. Weber

    During the years 1983-1987, a research programme, jointly performed by the steel producers ARBED, British Steel Corporation, Peine-Salzgitter, Unimetal, and co-sponsored by the European Community for

    Jan 1, 1991

  • DFI
    The Advantages Of Arbitration - I. Arbitration Defined

    By John B. Tieder

    Arbitration is a legally recognized alternate litigation for the resolution of civil disputes. The parties agree, either before or after a dispute arises, to submit that dispute to an independent thir

    Jan 1, 1988

  • DFI
    Ensuring Performance of Tip Post-Grouted Bored Piles (Drilled Shafts) Through a Comprehensive Quality Assurance Program

    By Mary Ellen Bruce Large, Antonio Marinucci, Silas C. Nichols

    Tip post-grouting of bored pile (drilled shaft) foundations refers to a method where cementitious grout is injected beneath the tip of a shaft to improve the overall performance of the constructed fou

    Jan 1, 2018

  • DFI
    New Device For Load Testing Driven Piles And Drilled Shafts Separates Friction And End Bearing

    By J. Osterberg

    A new device has been developed for load testing driven piles and drilled shafts which consists of an hydraulic jack or bellows which has a telltale rod fastended to the bottom. The rod extends upward

    Jan 1, 1989

  • DFI
    Methods Of Constructing Concrete Piles On Heavily Contaminated Sites

    By N. C. Matheson

    The West's Shell Pile has been used on sites with very soft ground conditions for over 60 years. Fibre reinforced precast concrete shells 900mm long are threadled onto an internal mandrel which c

    Jan 1, 1989

  • DFI
    A Study Of Three Test Sites Comparing Theoretical Ultimate Pile Capacities, Static Pile Load Tests, And Psuedo Static Pile Load Test Results

    By Richard D. Short

    The Pseudo Static Pile Load Test, PLT, is a rapid method for determining pile capacity. Pile design is usually based on theoretical calculations of ultimate load capacity using soil data from a field

    Jan 1, 2000

  • DFI
    Charles Grimes Bridge Foundations, Melbourne, Australia - Synopsis

    By Charles Pol Vuillier

    Piling work for modification to the Charles Grimes Bridge in Melbourne, Australia required piles to be installed through 15 to 20 m thickness of very soft to soft silty clay overlying 10 m of stiff cl

    Jan 1, 2000

  • DFI
    Modern Procedures For The Design Of Driven Pile Foundations

    By G. G. Goble

    Significant progress has been made in the past decade in determining the load bearing capacity of pile foundations. Developments in the means of prediction of pile capacity as limited by soil strength

    Jan 1, 1988

  • DFI
    Determination Of Design Pile Uplift Capacities Using Dynamic Pile Testing Methods

    By Juan M. Antorena

    A pile driving and testing program was undertaken to evaluate installation procedures, assess capacity, particularly in uplift, of 360- and 460-mm (14- and 18-inch) square prestressed concrete piles a

    Jan 1, 1995

  • DFI
    Diaphragm Wall Construction In Hong Kong

    By Arturo Ressi di Cervia

    The utilization of diaphragm wall construction in Hong Kong began in 1974 with the construction of the New World Center, the first diaphragm wall job built in the British Colony. That landmark job

    Jan 1, 1993

  • DFI
    Foundation Base Material Strength Assessment for Drilled Pipe Piles using Force and Displacement Data

    By Patrick J. Hannigan, Geir Veslegard, Frank Rausche, Rozbeh B. Moghaddam

    A common type of deep foundation used in Norway to support bridge structures is the drilled pipe piles (piles) filled with concrete reinforcement after installation. The standard installation practice

    Jan 1, 2018

  • DFI
    Building a High-Rise Adjacent to Transit Tunnels in San Francisco (6bdbc52a-94a2-4c48-ba21-cc4450dc649d)

    By Lori A. Simpson, Linda H. Liang

    A high-rise building, consisting of two tower structures occupying the entire site, is in construction in San Francisco. The North Tower will consist of 12 and 35 stories above a one-level basement. T

    Jan 1, 2017

  • DFI
    Building A High-Rise Adjacent To Transit Tunnels In San Francisco

    By Lori A. Simpson

    A high-rise building, consisting of two tower structures occupying the entire site, is in construction in San Francisco. The North Tower will consist of 12 and 35 stories above a one-level basement.

  • DFI
  • DFI
    Current State Of Practice Of Corrision Protective Systems For Tierods And Tiebacks Used In Marine Applications ? Introduction

    By Thomas A. Printz

    The wide use of carbon steel in construction and engineering projects makes this engineering material accountable for approximately 85% of the total annual steel production worldwide. Despite the lac

    Jan 1, 2013

  • DFI
    Analyses On Laterally Loaded Cast-In-Place Concrete Piles ? Synopsis

    By Makoto Kimura

    Failure tests on laterally loaded single and pile group are analyzed with a 3-dimensional elasto-plastic finite element program. In the analysis, the mechanical behavior of the ground is supposed to b

    Jan 1, 1996

  • DFI
    Development of a New, Advanced form of Sodium Silicate for Chemical Grouting

    By Julie Shang, Tim Evans, Michael McDonald, Yu Guo, Bingfeng Xue

    Effective chemical grouting represents a technical and economic solution to many challenges related to soil stabilization and blocking the flow of water. Chemical grouts are facing increasing demands

    Jan 1, 2018