Retrofitting Drainage Systems with Pressed-in Sheet Piles in Very Hard Soil in Southern CaliforniaBy Takefumi Takuma, Masashi Nagano, Christopher DellAringa
Multiple agencies in Southern California are retrofitting and upgrading their levees to catch up with ever-advancing urbanization affecting the requirements for existing channels and levees in this se
Jan 1, 2018
-
Unbraced Circular Cofferdam For Vent Building No. 6 At The South Bulkhead - IntroductionBy Philip Bonanno
The first major project in Boston's new access to Logan Airport was an Immersed Tube Tunnel which extended 3,600 ft. from South Boston to East Boston across Boston Harbor. Twelve tube sections, 3
Jan 1, 1994
-
Installation Of Bored Pile Casings Through An Asbestos Tip By Rotary DisplacementBy Lewis Stansfield
A rotary displacement method was used to install permanent steel casings for bored piles through an asbestos tip. This method was chosen in preference to alternative driven systems because it was quie
Jan 1, 2000
-
Comparison of Pile Foundations and Ground Improvement for Reduction of Seismic Displacements for a Wastewater Treatment PlantBy Andrew Port, Ali Ghandeharioon
Nonlinear seismic deformation analyses using the finite difference program FLAC were performed for a wastewater treatment plant to estimate foundation displacement and performance of two proposed tric
Jan 1, 2018
-
Caisson Design And Construction Challenges On The New Tiger Stadium Project - SummaryBy Fritz J. Klingler
From site demolition, to design, to construction, Detroit's new Tiger Stadium project is required to be completed within a short 2 ½ years from award of the design-build contract. Such extreme sc
Jan 1, 1999
-
Deep Diaphragm Walls And Bored Piles For Subway Construction At The Amsterdam Central StationBy Wolf-R. Under
For improvement of urban traffic infrastructure, the City of Amsterdam is currently constructing the 9.5 km long North-South Metro line passing through the central districts of Amsterdam. Focal secti
Jan 1, 2006
-
Problems Of Cast In Situ Driven Piles Added To Existing Piles And Built Near A Standing StructureBy L. F. Albert
The paper describes solutions given to foundation problems during the reconstruction of a power plant set on fire, located adjacent to several still Working Units. After a detailed site and laboratory
Jan 1, 1989
-
Excavation Support At The Capitol Visitor Center In Washington DCBy Harald Ludwig
In 2002, excavation support work commenced on the Capitol Visitor Center project located adjacent to the nation?s Capitol building in Washington, D.C. The outlying work (Slurry Wall Work at Main Site
Jan 1, 2006
-
New Possibilities for Quality Assurance of Diaphragm Wall JointsBy Joram M. Amir, Ernst Niederleithinger, Nikolaus Schneider
"Abstract: Diaphragm walls are used to provide a stable and watertight confinement for the construction of tunnels, underground railway stations, deep basements and other structures requiring deep exc
Jan 1, 2014
-
Foundations For The M25 Motorway Near To Heathrow AirportBy John F. Spence
Ever since opening, the M25 motorway to the west of London has carried a rapidly increasing volume of traffic. The section of M25 between the junctions with the M3 and M4 motorways, which is in the ne
Jan 1, 2007
-
Underpinning With Steel Pipe PilesBy Pasi Korkeakoski
There are about 400 multi-storey buildings founded on wooden piles in the city centre of Turku in Finland. Soil conditions are variable from hard rock to very soft clay. Due to the soil conditions and
Jan 1, 2000
-
Case History: Use Of Rock-Socketed Augered Cast-In-Place PilesBy Tracy Brettmann
The use of rock-socketed Augered Cast-In-Place (ACIP) piles is new to the Austin and central Texas region. This case history describes the design methodology, load test results, quality control proced
Jan 1, 1998
-
Micropile Foundation Retrofit Design For Richmond-San Rafael Bridge, Richmond, California - IntroductionBy Patrick E. Durnal
The Richmond-San Rafael Bridge was built in the early 50s' and was first opened to traffic on August 31, 1956. Among California's longest steel bridges, it spans more than 21,000 feet across
Jan 1, 1998
-
Designed, PDA Assisted Load Tested, And Constructed Pile Foundation Provides An Economical Foundation Solution - A Case HistoryBy Gregory A. Stephan
A case history of design, prediction, probe pile driving, and construction of a pile foundation for Building 3 of Waterside at Bay Beach Condominiums located in Fort Myers Beach, southwest Florida, is
Jan 1, 2003
-
Challenge From Foundation Engineering To China ? SynopsisBy R. L. Xu
In this paper, the author would like to point out with figures that the building industry is one of the key industrial sectors of the national economy in China. And in the coming 15 years, the output
Jan 1, 2010
-
Tentative Guidelines For Design Of Stone Columns- G. H. Approach - SynopsisBy A. R. Katti
The stone columns are widely used in the improving the bearing capacity of weak soils mostly for supporting flexible foundation systems. The load carrying capacity of a stone column is complex in natu
Jan 1, 1996
-
Soil Improvement Using Soil Mixing – An Alternative Way for the Indian MarketBy Franz-Werner Gerressen
"The use of soil improvement to utilize areas, which are not suitable for foundation purpose, has a long tradition. Due to the increasing demand of foundation works in areas of unsuitable soils, the i
Jan 1, 2017
-
Anchored Excavation Support Using SMW (Soil Mixed Wall)By Seth L. Pearlman
A major excavation support case history for the Eastern approach to the Third Harbor Tunnel (THT) in Boston, MA is described, which uses an anchored Soil Mixed Wall (SMW). Both general and project spe
Jan 1, 1993
-
Approach To Reliability Based Design On Deep Mixing Improved GroundBy Masaki Kitazume
Deep mixing method, in-situ admixture stabilization technique, has been developed and adopted for on land and marine construction works in Japan. The geotechnical design procedure of the method has be
Jan 1, 2004
-
Elimination Of Heave Forces On Lightly Loaded Piles In Swelling Clay - SummaryBy Basem Sh. Hazzan
In the last four decades significant effort has been devoted to designing piles in expansive clay soils. Nevertheless, only a scant effort has been devoted to the elimination of heave forces acting on
Jan 1, 1999