Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Non-Braced And Non-Anchored Diaphragm Walling In Soft Soil ? Synopsis

    By D. Y. Peng

    A Large Sub-structure with open top of S.Y.P. float line requires a 90m x 50m in plan and 13m-deep excavation in soft soil, Shanghai. The geological conditions in site are rather severe. The technolog

    Jan 1, 2010

  • DFI
    Capacity Prediction Vs. Performance Of Driven Pre-Cast Pre-Stressed Concrete Piles In Chesapeake, Virginia

    By Emad Farouz

    This paper compares the predicted axial capacity of driven Pre-cast Pre-stressed Concrete (PPC) piles for the Lake Gaston Water Treatment Plant (LGWTP) using several design methodologies versus the ax

    Jan 1, 2007

  • DFI
    Effects Of Environment On Deep Foundation Elements - Synopsis

    By Subhash B. Bhide

    Deep foundations are affected by the presence of sulphates, chlorides, organic contents and water currents present in the soil. The sulphates in soil and ground water interfere first with setting of c

    Jan 1, 1996

  • DFI
    Augered Pressure Grouted Piles In Complex Glacial Soils - A Case Study - 1. Introduction

    By Peter J. Jancich

    This paper describes the installation of high capacity Augered Pressure Grouted piles which support structural loading from a four level parking garage in west-central DuPage County, Illinois. The sub

    Jan 1, 1991

  • DFI
    Soil-Structure Interaction Of A High-Rise Building Near Sensitive Structures In Soft Soil Conditions

    By Mohamed Hassan, Matthias Seip, Steffen Leppla

    In the east of Frankfurt am Main, Germany, a new high-rise building is planned directly next to the river Main. The high-rise building will have a height of about 75 m and will be founded on a Combine

    May 1, 2022

  • DFI
    Physical Modeling and Development of Design Criteria for Maintainable Drains for Earth Retention Systems

    By J. Erik Loehr, Andrew Z. Boeckmann

    "Poor drainage is a common cause of poor performance of earth retention systems, resulting in burdensome serviceability problems that can progress to outright failure of the retention system if not ad

    Jan 1, 2016

  • DFI
    Monotonic And Cyclic Lateral Full-Scale Testing Of Reinforced Helical Pulldown Micropiles

    By M. Meckkey El Sharnouby

    In this paper, the results of full-scale field testing of reinforced helical pulldown micropiles (RG-HSP) installed in clayey till soils and resting on sandy soils are presented. Piles were tested und

    Jan 1, 2011

  • DFI
    Analysis of Load Transfer along Large Diameter Bored Piles in Very Dense Sands

    By Nabil F. Ismael, Khalid Farraj

    "The axial load transfer along large diameter bored piles in very dense silty sand was examined by field tests. Two instrumented piles 1.2 m diameter and with embedded length of 18 m and 25 m were loa

    Jan 1, 2017

  • DFI
    Remedial Drilling and Grouting at Abiquiu Dam, Nm and Fluid Losses in the Embankment, A Case History

    By Suzanne R. Hess-Brittelle, Sharon L. Schulz, Tyler J. Quick, Amy F. Ebnet

    "Abiquiu Dam is a rolled earth fill dam with impermeable core located on the Rio Chama in New Mexico. Abiquiu has had a history of excessive seepage through the fractured sandstone abutments since wat

    Jan 1, 2016

  • DFI
    St. Louis Service Base Floating Wharf Mooring System Replacement

    By A. Bozorgzadeh, B. M. Jensen, B. N. Koelling, B. R. Murtaugh

    "The Service Base mooring system originally consisted of two general types of structures, 19 timber piles cabled together and steel three-legged pipe piles. The St. Louis District fleet moored to the

    Jan 1, 2017

  • DFI
    Acceptance Of Timber Piles Based On Equivalent Driving Energy

    By Chu E. Ho

    This paper describes a case history involving the use of the Equivalent Driving Energy concept for evaluating timber piles that failed to achieve the termination criterion traditionally based on final

  • DFI
    Response of Intermediate Foundations for Onshore Wind Energy Under Variable Ground Conditions

    By Spencer Ness, Yazen Khasawneh

    Onshore wind turbines are complex and dynamic systems, undergoing variable environmental and mechanical loads. These dynamic loads are transferred through the turbine components and tower to the found

    Oct 7, 2024

  • DFI
    Improvements in Deep Compaction Using Vibratory Pile Hammers (a877ad8a-6d27-4e33-a419-f0edb9bac870)

    By Dennis Nottingham

    "Increased interest in seismic soil liquefaction and preventative soil stabilization sets the stage for improved deep compaction methods using pile driving techniques. In 1971, L.B. Foster Company per

    Jan 1, 2005

  • DFI
    D-Wall Extreme – Contrast Between Going Deep And Getting Small

    By Alexander Blatt, Franz-Werner Gerressen

    Diaphragm wall technique is usually used to construct structural elements in the ground, commonly used for retention systems, permanent foundation elements or deep groundwater barriers, named Cut-Off-

    May 1, 2022

  • DFI
    Application of the Cement Deep Mixing Method for Shallow Water Areas Using the CDM-Float Technique

    By Takeo Asanuma, Sachihiko Tokunaga, Hirofumi Taguchi, Yasuhiro Ootsuka, Yosuke Tanaka

    The Cement Deep Mixing Method (CDM Method) is a ground improving method that has been used for mainly offshore sites to strengthen the soft ground below the sea bottom by injecting and adequately mixi

    Jan 1, 2015

  • DFI
    Non-Destructive Testing Methods for Drilled Shaft and ACIP Piles (34748882-cb96-4081-9967-58c48901bc15)

    By George Piscsalko

    "Quality control of drilled shafts and ACIP piles is greatly dependent upon the practices of the site personnel. In many applications it is difficult to properly inspect the shaft prior to concreting,

    Jan 1, 2017

  • DFI
    Soil and Rock Nail Wall for Construction of a Subterranean Auditorium

    By Andrew Moran, William H. Walton, Matthew D. Emrick, Mary C. Nodine

    "A rapidly growing company in the northern US needed a large auditorium built into a dolomite bedrock hillside. The structure required an 80-foot-deep earth retention system independent of the auditor

    Jan 1, 2017

  • DFI
    Non-Destructive Testing Methods For Drilled Shaft And Acip Piles (6922d0e7-932e-4be1-a810-c6fa95777bc9)

    By George Piscsalko

    Quality control of drilled shafts and ACIP piles is greatly dependent upon the practices of the site personnel. In many applications it is difficult to properly inspect the shaft prior to concreting,

  • DFI
    Construction Of A Pre-Founded Anchored Wall, Monitoring Of Execution Based On The Eurocode 7 Observation Method, And Taking Account Of The Transmission Of Seismic Forces In The Retaining Structures Towards The Buildings Structure

    By Denis Huber

    The technical assessment of the final works on the "Stéphany Palace" project at Menton in France's Alpes-Maritimes region shows the importance of daily project monitoring based on the observation

    Jan 1, 2002

  • DFI
    Replacement Bored Piles for the Houphouet-Boigny Bridge, Cote D'ivoire

    By Adrian Mercer, Ashkan Ameri

    Due to general degradation, increased traffic levels, and historical ground movement, this road and rail bridge which provides an essential link between the interior of the country and the Port of Abi

    Sep 8, 2021