Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Leveraging The CM/GC Project Delivery Approach for Remote High Elevation Dam Rehabilitation Projects In ColoradoBy Mark Brooks, Brian Freeland, Eric Eisinger
Colorado Parks and Wildlife (CPW) operates more dam and reservoir facilities in the State of Colorado than any other single entity and is in the process of completing rehabilitation upgrades to improv
Oct 7, 2024
-
Construction Of The Drilled Shaft Foundations For The Huey Long Mississippi River Bridge, New OrleansBy Dan A. Brown
The foundations at the Huey P. Long Bridge in New Orleans presented special challenges for construction due to the requirements for very deep drilled shafts in the Mississippi River beneath the existi
Jan 1, 2010
-
A New Low-Cost Bi-Directional Load Test Technique for Drilled ShaftsBy Sherif Elfass, Gary Norris
Bi-directional load testing of drilled shafts has been widely adopted as a means to evaluate their load carrying capacity. However, in order to reach failure, most of these tests are carried out on s
Sep 8, 2021
-
Structure Monitoring During UnderpinningBy Barry C. Roth
A Real Time Automated Remote Reading Electrolytic Tilt Monitoring System was effectively deployed for monitoring an existing five story brick building during underpinning, shoring and excavation opera
Jan 1, 2007
-
Application Of Large Diameter Pile Foundations To Factory BuildingBy Wang Mingshu
The pile foundation is a kind of advanced foundations in the filled or soft soil. In this paper, through the actural engineering of coal dressing plant of Western Opencast Coal in Fushun built on the
Jan 1, 1991
-
Multiple Foundation Types For Bridges Over The Same Coal MineBy Kenneth M. Berrry
A unique situation has developed at an abandoned coal mine in St. Clair County, Illinois. Subsidence features have been observed at the ground surface over the mine including settlement of a pair of b
Jan 1, 2001
-
Geographic Information Systems Technology Use in Tracking Quality Control in In Situ Barrier Wall Construction (50051f21-259c-48c8-b98a-08fa9c39001e)By Michael Arnold, Robert Bachus, Michael Bracher, Jamey Rosen, Robert Roff
"For a high hazard USACE facility, the Center Hill Dam in Tennessee, several disparate streams of data were compiled into a single geospatial and relational enterprise data management system to store,
Jan 1, 2017
-
Building The Devil’s Playground: How a Ground Improvement Program Eliminated the Need for Pile FoundationsBy Christian B. Woods, Joe C. Drumheller
"Kenneth A. Huber, P.E., Langan Engineering & Environmental Services, New York, New York, USAThe dream to bring New Jersey Devils hockey to the largest city in New Jersey became a reality in the summe
Jan 1, 2015
-
Case Study: Large Diameter Helical Pile Foundation for High Voltage Transmission Towers in Soft Glacial DepositsBy John Dunn, Matt Hawley, Kashif Butt, Nicholas Gura
"This paper presents the results of a static load testing program completed on helical pile foundations for the replacement of high voltage transmission line tower structures. The foundations were par
Jan 1, 2017
-
Soil Mixing Treatment of Marginal Soil for Railway Construction and MaintenanceBy Charles M. Wilk
"Mass stabilization involves mixing binding agents into marginal or contaminated soil to improve the subject material’s physical and/or chemical properties. This paper concentrates on the principles o
Jan 1, 2017
-
Pile Design And Construction Challenges In Partially Thawed Alaskan SoilsBy John D. Thornley
Alaskan villages typically store a one-year supply of fuel to reduce significant delivery costs. Alaska Village Electric Cooperative (AVEC), an electric utility cooperative providing power to 51 Alas
-
Pile Design and Construction Challenges in Partially Thawed Alaskan Soils (f9ca4371-20bf-4196-a495-4aa1bd15a8c0)By John D. Thornley
Alaskan villages typically store a one-year supply of fuel to reduce significant delivery costs. Alaska Village Electric Cooperative (AVEC), an electric utility cooperative providing power to 51 Alask
Jan 1, 2017
-
Effects of Stratigraphy on the Response of Energy PilesBy Arash Saeidi-Rashk-Olia, Dunja Peric
Energy piles are gaining increased popularity due to a growing demand for clean energy. To further advance the understanding of soil-structure interaction in energy piles, recently-derived analytical
Sep 8, 2021
-
Dynamic Pile Monitoring For Offshore Pile AcceptanceBy Scott Webster
Dynamic pile Monitoring Services (DMS) have been used for testing of offshore piles for several decades. However, most of this testing was to measure hammer performance and pile stresses rather than
Jan 1, 2010
-
Deep Mixing Column Group Reinforcement by a Shallow Mixing Layer bBeneath an EmbankmentBy Tomohide Takeyama, Binh T. T. Nguyen, Masaki Kitazume
"Deep mixing columns are widely used to support embankments constructed on soft ground area. Researches on the stability of deep mixing columns were done by some authors when the columns do not simult
Jan 1, 2015
-
The Progress Of Jet Grouting In The Last 10 Years In Japanese MarketBy H. Yoshida
Jet grouting was first introduced in Japan in the second half of the 1960s, approaching 50 years ago. By the end of the first 40 years, jet grouting from single to triple fluid systems had become a g
Jan 1, 2010
-
Session 12 "Deep Mixing Method II"By Helen Ahnberg
The scope of the present paper is limited to report the experimental evidence and not for describing the analytical assumptions. However, the idea behind the experimental program is that the deteriora
Feb 10, 2003
-
Characteristics And Application Potentials Of Ground Improvement With Semi-Rigid Inclusions Based On An Innovative Composite Of Polymers And GravelBy Pratter P., Boley C.
Polymers are well established in geotechnical applications, for example in ground improvement, where the polymers act as a binder that, when cured, holds the grains together by adhesive and cohesive f
May 1, 2022
-
Presentation #7 - Bi-Directional Static Load Testing - Load Testing High Capacity Piles What Have We Learned?By Jorj Osterberg
550 load tests of up to 150 MN have been completed on driven and bored piles using the Osterberg Load Cell. Because the test measures side shear and end bearing separately, much can be learned about t
Jan 1, 2001
-
Jet Grouting at the West Toronto Diamond Grade Separation ProjectBy Jim Bruce, Naresh Gurpersaud
"The West Toronto Diamond project, under construction since 2006 and due to be complete in 2015, is a rail-to-rail grade separation project in the heart of urban Toronto. Once complete, a depressed co
Jan 1, 2017