  • DFI
    Soil Nail Design Optimization of 100 Ft Deep Excavation Project in San Diego, CA

    By Babak Mamaqani, Pirooz Barar

    The Heights project was located at Fashion Valley North, San Diego, CA. The scope of the project was to replace two existing commercial buildings with a large 7-story multi-family residential building

    Sep 8, 2021

  • DFI
    Stability Analysis Of Micro Pile Reinforced Idukki Soil Slopes

    By Anjana C. P, K. Ranga Swamy

    The hilly regions of Kerala are severely affected by excess rainfall, causing tremendous damage due to landslides and slope failures. It is necessary to strengthen the existing slope profiles to preve

    Sep 1, 2022

  • DFI
    Load-Deformation Based Design of Deep Mixing for Supporting MSE Walls at Kitimat LNG, BC

    By Randy R. Williams, Brian W. Wilson, George M. Filz, Marina S. W. Li

    "Detailed design of an extensive deep mixing (DM) scheme using the Cutter Soil Mixing (CSM) technique was completed for foundation support of mechanically stabilized earth (MSE) walls for Kitimat Liqu

    Jan 1, 2015

  • DFI
    Deep Excavation By Controlled Rock Blasting Considering Ground Condition And Nearby Structures In Ug Metro Station – A Case Study

    By P. K. Ray, Sudip Kumar Koley, Sainath M. Reddy, Devulapalli L. S Rasagna

    Bangalore Metro Rail Project- phase II is one of the technological challenging project, particularly construction of underground metro rail system. The Bengaluru city is very congested area and connec

    Sep 1, 2022

  • DFI
    High-Capacity Helical Piles for Drill Trestle Support

    By Matt Fenwick, Douglas R. Schwarm

    Stringent underwater noise limits at the Fairview Ave. N. bridge replacement on Seattle's Lake Union required an innovative approach to supporting the 470-ft long drill trestle. Screw-in foundations

    Sep 8, 2021

  • DFI
    Load Distribution for Underpinning System Using Inherent Rigidity of Concrete Dam

    By Rick Deschamps, Amanda Blank, Matthew W. Drewek, Michael P. Walker

    The Prairie du Sac Dam, located on the Wisconsin River, northwest of Madison, Wisconsin, was constructed 1912-1914. The spillway is an Ambursen-type, consisting of a series timber pile supported pier

    Sep 8, 2021

  • DFI
    Limiting Damage To Historic Structures In New York City, 1981 To Present

    By Andrew J. Ciancia

    The construction of the Pennsylvania Station in Manhattan, the Beaux-Arts masterpiece, was completed in 1910. In financial ruin, the Pennsylvania Railroad Company sold the station in the 1960?s and t

    Jan 1, 2008

  • DFI
    Testing Foundations for Major Minnesota Bridges

    By Dan A. Brown, Rich A. Lamb, Paul J. Axtell

    "Over the last 10 years, the Minnesota Department of Transportation (Mn/DOT) has had a very active program of replacing many major bridges, large structures spanning the Mississippi River. The deep fo

    Jan 1, 2013

  • DFI
    Challenges and Lessons Learned from Shoring Design of 2nd / Broadway Metro Station

    By Babak Mamaqani, Pirooz Barar

    Regional Connector Transit Corridor (RCC) is part of the Los Angeles metro expansion project under construction which adds three new stations into the system. PB&A was responsible for the design of th

    Jan 1, 2019

  • DFI
    Developments In Thermal Integrity Testing Practice And Interpretation

    By A. Fisher

    The use of thermal integrity testing to verify the quality of deep foundations has increased significantly in the UK and other world markets over the last 5 years. The introduction of distributed fibr

    Oct 1, 2022

  • DFI
    Geotechnical Aspects of Design & Construction for the Living Breakwaters Project

    By Mangtao (Monty) Du, Brendan Busi, Patrick Bassal, Daniela Zellers

    The Living Breakwaters project aims to reduce the impact of climate-intensified events on a coastal community which experienced extremely damaging waves and tragic loss of life during Superstorm Sandy

    Oct 7, 2024

  • DFI
    The Final Piece of the Puzzle: Re-Design Of Grouted Closures for a Dam Cutoff Wall

    By Daniel P. Stare, Lucian P. Spiteri, Christopher M. Hallahan, James C. Myers

    Buckeye Lake Dam was substantially remediated between 2015 and 2018 as a result of unacceptable dam safety performance. A permanent seepage cutoff, consisting primarily of a soil mixed cutoff wall (SM

    Jan 1, 2019

  • DFI
    Building Above And Excavating Below An Iconic Building In Manhattan

    By John S. Civetta, Seth Martin, Marc J. Gallagher, Arthur J. Alzamora, Ronald Peralta

    The Crown Building, built circa 1921, is a 26-story iconic building located at West 57th Street and Fifth Avenue in the heart of Manhattan. The paper highlights collaboration between the geotechnical

  • DFI
    Applications, Observations, and Lessons Learned From Earthen Fill and RCC Embankment Construction With Cut-Off Wall in South Florida

    By Scott Lakes

    In recent years, Southeast Florida water agencies have been collaborating to develop a regional water supply that is sustainable and affordable. The C-51 drainage canal was selected as a leading candi

    Oct 7, 2024

  • DFI
    Investigation and Design for Large Drilled Shaft Foundations in Southwest Arizona

    By John C. Tosh, Peter M. Kandaris, Sheldon John

    Geologic, geotechnical and hydrologic studies were performed for the design of 115 deep, large diameter drilled shaft reinforced concrete foundations (6 to 12 feet) to support tall steel monopoles for

    Sep 8, 2021

  • DFI
    Urban Challenges In Design, Co-Ordination And Construction Of Deep Foundations And Retaining Walls

    By Pawan L. Sethi

    Design and construction of deep foundations and basements is increasingly becoming more complex, as the density and frequency of urban development increases. This growth brings various associated chal

    Nov 1, 2022

  • DFI
    The Innovative CSM - Cutter Soil Mixing System for Constructing Retaining Walls and Cut-off Walls

    By Erwin Stötzer, Renato Fiorotto, Wolfgang G. Brunner, Manfred Schöpf

    "Deep mixing methods can be used economically for the construction of cut-off or excavation support walls where other systems such as traditional soldier beams and lagging walls would yie ld unsatisfa

    Jan 1, 2005

  • DFI
    Effective Sampling, Testing and Specification Approaches for Deep Mixing at Kitimat LNG, BC

    By Randy R. Williams, Brian W. Wilson, George M. Filz, Marina S. W. Li, Donald A. Bruce

    "In-situ wet grab sampling and post-installation coring of soil-cement structures are typically carried out for Quality Control (QC) and Quality Assurance (QA) of deep mixing (DM) schemes. Wet grab sa

    Jan 1, 2015

  • DFI
    Sao Paulo’s Brooklin Station: An OPA Contender

    By Dario Libano

    "The Line 5 Extension, in Sao Paulo, Brazil, is currently the most important investment in public transportation by Sao Paulo’s state government. It will connect the south part of the city to the city

    Jan 1, 2014

  • DFI
    Field Sampling and Testing for Soil Mixing – Uses and Misuses of Different QA/QC Tests for CDSM Projects – A Contractor’s Perspective

    By A. David Miller, Chika Oya

    "Field sampling and testing are part of the Quality Assurance/Quality Control (QA/QC) requirements for all Cement Deep Soil Mixing (CDSM) Projects. Field sampling and testing are also used for determi

    Jan 1, 2017