Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    25 Years of Process Development: Gold Processing

    By K. P. Wright

    "Twenty-five years ago, there were about thirty-two gold mines operating in Canada; nine of these have been in continuous operation since then and are still operating. Three of these are part of the D

    Jan 1, 1987

  • CIM
    Western Mines- Myra, Lynx and Price deposits

    By R. H. Seraphim

    "Western Mines Limited produces gold, silver, copper, lead and zinc from a number of Paleozoic volcanogenic deposits near Buttle Lake on Vancouver Island. The deposits were emplaced along a series of

    Jan 1, 1980

  • CIM
    Les Mines INMET Division Troilus - Objet: Extension de la vie des godets des excavatrices DEMAG.

    Les Mines Inmet ? La Division Troilus exploite une mine d?or à ciel ouvert depuis 1996 et produit un concentré de cuivre. La Division Troilus est localisée à 175 KM au nord de la ville de Chibougama

    Feb 1, 2008

  • CIM
    Narrow vein mine design at the Hoyle Pond mine

    By John G. Henning

    The Hoyle Pond underground mine is located in the Porcupine Gold Camp, 18 km east of downtown Timmins. Since the initiation of production in 1985, the operation has produced in excess of 1.9 million o

    Oct 1, 2004

  • CIM
    An investigation on minimizing reagent consumption in ammonium thiosulphate gold leaching

    By Chen Xia, G. Deschenes, Wan-Tai Yen

    "Ammonium thiosulphate is a potential replacement for the cyanide in gold leaching. However, the high reagent consumption hinders its practical applications. In order to reduce the thiosulphate consum

    Jan 1, 2002

  • CIM
    Requirements for Underground Mine Backfill Monitoring

    By David O. DeGagné

    While mine backfill plants are becoming increasingly more automated and instrumented, especially with paste fill operations, underground backfill distribution systems have hardly changed over the year

    May 1, 2001

  • CIM
    The G-9 Mine Story

    Overview ?G-9 Discovery Hole 420 drilled May 2005 ?14.16% Zn, 1.76% Cu ?Greenfield discovery built into the G-9 Mine in under 4 years. ?Utilized a unique ?Parallel Track? approach to fast-track min

    May 1, 2010

  • CIM
    Mucking efficiency in open pit blasting

    By J. J. Montoro

    The influence of blasting on the excavators’ efficiency, defined as mucking rate (amount of rock mucked per unit time) and mean bucket load (amount of rock loaded in each bucket operation), is investi

    Jan 1, 2007

  • CIM
    Gold Alloy Deformation Processed Metal - Metal Matrix Composite Wire

    By Timothy W. Ellis

    Wire Bonding is the dominant IC interconnection process presently used in the semiconductor assembly industry (1). The flexibility, adaptability and cost of wire bonding will continue to keep it as th

    Oct 1, 2003

  • CIM
    Significant Canadian Developments in Mineral Processing Technology 1961-2011

    By J. E. Nesset

    "I had been requested earlier this year by MetSoc, our sister society of CIM, to contribute a chapter on technical developments in Canadian mineral processing over the past 50 years to their 50th Anni

    Jan 1, 2012

  • CIM
    Safe Rapid Drifting - Support Selection

    By Fidelis T. Suorineni

    Rapid drifting enables quicker access to orebodies, higher production rates and a resultant reduction in production cost. The Mining Innovation, Rehabilitation and Applied Research Corporation (MIRARC

    May 1, 2004

  • CIM
    Solubility of MgO in High Cu2O Slags in Equilibrium with Cu Metal

    By T. Crivits

    "Phase equilibria in the ‘Cu2O’-‘Fe2O3’-SiO2 system, the base slag system in copper production, were recently determined. However, the addition of MgO, commonly present in the slag, drastically change

    Jan 1, 2014

  • CIM
    Constancia Project Process Plant Design and Start Up

    By David Stephenson, Hugo Granados, Steven Klohn

    "HudBay’s Constancia project is a copper molybdenum concentrator located in southern Peru. In 2010 Ausenco was contracted to perform a feasibility study optimization review which resulted in an improv

    Jan 1, 2016

  • CIM
    L'Origine et les Caracteristques des Lithofacies du Till dans le Secteur Nord du Lac Albanel, Quebec

    By M. Bouchard, B. Cadieux et F. Goutier

    Five phases of ice movement were r es pons ible f or glacial dispersion in t he study area. I ce fl ow directi on changed prog r es s ively from SE to SSW and then to the S. All observed glacial sed i

    Jan 1, 1984

  • CIM
    The Effect of Iron Removal from Raffinate on the Copper Bioleaching Process

    By A. Ghahremaninezhad, E. Jorjani, A. Riahi, Islamic Azad University, B. Nazari, H. Hani, Z. Manafi

    The presence of a high iron concentration, 9.1 g/L, in the raffinate of the Sarcheshmeh copper heap bioleach process led to the formation of various types of jarosite, (K,Na,NH4,H3O)Fe3(SO4)2(OH)6, on

    Jan 1, 2016

  • CIM
    The Mechanics of Operation of Column Flotation Machines

    By R. L. Amelunxen

    "In January 1983, Gibraltar Mines Ltd. started an exploratory program on Column Flotation with hopes of improving performance of the Molybdenum Cleaning circuit. The encouraging results led to a colum

    Jan 1, 1985

  • CIM
    Design of the Kubaka Grinding Circuit Using SPI and Bond

    By Graham Holmes, John Starkey

    "The Kinross Kubaka Project is a gold mine located in the Russian Far East. The grinding circuit, comprised of a 6.1 m diameter x 2.74 m long SAG mill and a 4.1 m diameter x 5.5 m long secondary ball

    Jan 1, 2001

  • CIM
    Sand Fill from Mill Tailings

    By W. T. Martson

    ABSTRACT Sooner or later, every producing mine faces the question of fill. This paper invites consideration of mill tailings as an economical, efficient, and quantitatively adequate source of such fi

    Jan 1, 1951

  • CIM
    Fluid Inclusion and Stable Isotope Study of the Buffalo Gold Deposit, Red Lake Greenstone Belt, Northwestern Ontario, Canada

    By G. Chi, A. Solomon, J. Lai

    "The Buffalo gold deposit is a small deposit consisting of auriferous quartz-tourmaline veins within a granodiorite stock in the Red Lake greenstone belt. This study aims to characterize the mineraliz

    Jan 1, 2009

  • CIM
    The Sampling System of Courier 300 Analyzer

    By Tapio Leskinen

    "l. IntroductionA reliable sampling system is the basis for an on-stream analyzer. This was realized in Outokumpu company when the development work of the Courier 300 On-Stream X-ray analysis system w

    Jan 1, 1976