Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Inco Gold - exploration and development

    By S. Sopher, C. Barsotti

    "Inco Gold Company was created in 1987 as an unincorporated business unit of Inco Limited. In 1988, Inco Gold Management Inc. was incorporated to supply management, exploration and engineering service

    Jan 1, 1990

  • CIM
    Underground water bulkhead construction at Pamour No. 1 mine

    By H. Kalsi

    "IntroductionRoyal Oak Mines Inc. is currently operating the Parnour No.1 mine located 10.5 miles east of Tinunins, adjacent to Highway No. 101. The operation produces gold ore at a rate of 3300 tpd.

    Jan 1, 1994

  • CIM
    A mineralogical evaluation of the spiral circuit at the Mount Wright concentrator by image analysis

    By J. M. D. Wilson, W. Petruk, C. Coté

    "The behaviour of minerals in the Mount Wright spiral circuit was investigated to find methods of improving iron oxide mineral liberation and recovery. The feeds, concentrates and tailings from roughe

    Jan 1, 1990

  • CIM
    A review of some useful algorithms in geophysics

    By Douglas C. Fraser

    "Geophysical data are often presented on maps, sections or profiles with minimal data processing. A common example is magnetic data, in which the diurnal-free raw readings are merely contoured on a ma

    Jan 1, 1981

  • CIM
    The Hishikari gold deposit: an airborne EM discovery

    By Minoru Fujita, Ian M. Johnson

    "A helicopter-borne geophysical survey was flown in 1978 over selected areas on Kyushu Island, Japan. The principal sensors were a moving source electro-magnetic system and a magnetometer. Maps of app

    Jan 1, 1985

  • CIM
    Tires, their importance and cost in the mine

    By Don McColman

    "Tires, although not always the largest single cost item in open-pit mining operations, will place in the top three, along with explosives and fuel. How this high-cost supply is controlled is dependen

    Jan 1, 1986

  • CIM
    Falconbridge's Raglan Project: A Development Update and Description of the Concentrator Circuit Design

    By D. B. Hyma

    "The Raglan Ni/Cu property is located on the Ungava Peninsula in Northern Quebec, Canada, at a latitude of61°42' and a longitude of73°40', approximately 40 km southwest of Douglas Harbor. Geological r

    Jan 1, 1993

  • CIM
    Why Projects Fail – An Overview on Operational Readiness

    By A. Khan, C. Ciriello, W. Oliveira

    "The purpose of this paper is to demonstrate the value of Operational Readiness (OR) in the successful delivery of capital projects. OR can be captured using several technical and practical definition

    Jan 1, 2016

  • CIM
    Rejection of Uranium from a Copper Gold Ore by Flotation

    By F. Ford, J. Dong

    "Laboratory and miniplant testwork was carried out to reject uranium from an Iron Oxide Copper Gold (IOCG) deposit that contains an average of 60-70 ppm uranium with high variability. The dominate cop

    Jan 1, 2016

  • CIM
    Simulation of the Grinding Circuit at St Andrew Goldfields Ltd.'s Stock Mine Mill

    By Daniel Lachapelle, Nuri Hmidi, Turgut Yalcin

    "Simulation can serve as a convenient tool in studying the behaviour and performance of grinding circuits by facilitating the evaluation of various scenarios and identification of optimum operating co

    Jan 1, 2001

  • CIM
    Excellence in an Aluminium Alloy Rolling Operation through Six Sigma Application

    By Ifeanyichukwu Nweke

    "Aluminium rolling processing from ingots to cold rolled coils comes with a lot of challenges especially in controlling defective products in casting, hot mill and cold mill operations. Hence this stu

    Jan 1, 2018

  • CIM
    TUFFSTUDDS-A new wear protection system

    By V. Silins, J. Tameling, R. C. Cook

    "A general review of the wear problems encountered in the mining industry is presented and current practice for wear protection systems is reviewed.A new concept in wear protection is described and co

    Jan 1, 1982

  • CIM
    Geology and geochronometry of the Sclleelite Dome tungsten-bearing skarn property, Yukon Territory

    By R. L. Armstrong, C. I. Godwin, V. M. Kruan

    "The Scheelite Dome tungsten-bearing skarn property, central Yukon Territory, is in metasediments in contact with a quartz monzonite intrusion. Contact metamorphism to biotite-muscovite- andalusite ho

    Jan 1, 1982

  • CIM
    Conversion of a crushing plant to a gold mill in a copper smelter

    By G. Macfarlane

    "In 1985, a crushing plant, located in the feed preparation area of Kidd Creek's copper smelter, was modified. The plant, which originally had treated only copper-bearing materials for the smelle

    Jan 1, 1988

  • CIM
    A total system concept for the reclamation and hydraulic transportation of dense solids from tailings and settling ponds

    By Peter Van-De-Velde

    "The results of applying Japanese pumping technology to North American reclamation projects will be discussed.IntroductionEconomic high-density mineral reclamation and subsequent transportation of sol

    Jan 1, 1985

  • CIM
    Standardization of Geological & Geomechanical Assessment at Underground Coal Mines in Canada

    By S. Forgeron

    Presentation ? Introduction ? Canadian Underground Coal Mines ? Standardization of Geological Assessment ? Geomechanics Base-line Studies of Canadian Coal Mines ? Cape Breton Development Corpora

    May 1, 2001

  • CIM
    Slag Refining Of Silicon: A Review

    By L. Tafaghodi, A. Hosseinpour

    "Silicon is considered as the most appropriate semiconductor material for manufacturing solar cells because of its natural abundance and being nontoxic. The transferable knowledge and technology from

    Jan 1, 2017

  • CIM
    Zone 4 North 520-7350E & 590-7215E Freeze Drifts Development

    By Brian Mattie

    Overview ?Overview of the mining area ?Description of the mining phases ?Risk assessment ?Design criteria and description for freeze drifts ?Freeze wall design ?Raisebore mining Four Main

    Nov 1, 2011

  • CIM
    Selenium and Molybdenum Removal from Key Lake Mill Process Effluent

    By Arthur Lieu

    Outline Removal mechanisms of Se and Mo in the Key Lake Bulk Neutralization circuit Bulk circuit Detail process modification in the Key Lake BN circuit Process performance after commissioning Ob

    Nov 1, 2011

  • CIM
    Post-Pillar Design for Overhand Cut and Fill Mining in Moderate to High Stress Conditions – A Case Study

    By M. Yao, D. Thibodeau

    "Selective mining, such as post pillar cut and fill, is used in large, flat, irregularly shaped ore bodies where ground stability is to be maintained. This selective mining is used to open the stope t

    Jan 1, 2015