Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Stabilisation of Large Scale Spoil Piles in Deep Open Strip Coal Mines

    By Eckersley J, Boyd G

    A brief review is presented of the mechanisms and causes of spoil pile failures which have occurred at the Goonyella Mine. In particular, the results of a recent geo- technical investigation of the

    Jan 1, 1981

  • AUSIMM
    Aeration Design for Gold Ore Leaching

    Oxygen is required for the leaching of gold ores in cyanide solutions. The source of this oxygen demand and the effect of dissolved oxygen concentration on the rate of the process are briefly reviewed

    Jan 1, 1984

  • AUSIMM
    The Steep Angle Conveying Option for Large Open Pit Mines

    Traditionally trucks have dominated haulage in open pit mines. Only recently have conveyors begun to be used in the long haul and high lift duties of surface mines. Steep angle conveyors are proven ve

    Jan 1, 2003

  • AUSIMM
    The Development of the In Stream Analysis System as used at Z.C. Mines

    By Freeman NV

    The concept of an in stream analysis probe was developed at The Zinc Corporation (now Z.C. Mines) in the late 1960's and commercialised quite rapidly, by Phillips and then AMDEL, as an alternat

    Jan 1, 1988

  • AUSIMM
    Zircon to Zirconia - from Sand to High Performance Ceramics

    By Houchin MR, Jenkins DH

    This paper examines the importance of processing to the properties and performance of high purity zirconia ceramics. Many of the principles discussed, however, apply to ceramic processing in genera

    Jan 1, 1989

  • AUSIMM
    Hilton Mine Dewatering-North West Queensland, Australia

    By Whincup P

    Hilton deposit comprises en-echelon silver-lead-zinc orebodies with reserves in excess of 50 million tonnes. The host rock to the ore is a dolomitic and pyritic shale/siltstone which dips steeply we

    Jan 1, 1988

  • AUSIMM
    The Planning and Design of the Prospect to Pipehead Tunnel

    The Prospect to Pipehead Tunnel is a component of the Sydney Water Board's multi-million dollar Drinking Water Quality Program to improve the quality of Sydney's potable water supply to meet

    Jan 1, 1993

  • AUSIMM
    Kinetics of Reduction of Arsenic(V) to Arsenic(III) with Sulphur Dioxide in Aqueous Solution

    By Lawson F

    The Australasian Institute of Mining and Metallurgy is a society of engineers and scientists formed in 1893 (incorporated by Royal Charter in 1955) to advance science and engineering in the mineral

    Jan 1, 1989

  • AUSIMM
    Tunnel Investigations in the Terrigal Formation of New South Wales

    By Peck W

    The tunnel alignments investigated for the Gosford Regional Sewerage Scheme are located in the Terrigal Formation and are covered for most of their length by a thick blanket of soil and weathered

    Jan 1, 1976

  • AUSIMM
    Bulk Explosives go Tunnelling in Hong Kong

    The constructionhunnelling industry in Hong Kong has taken an upturn during the last few years due to the commencement of works to relocate the International Airport to Chek Lap Kok Island. The Airp

    Jan 1, 1994

  • AUSIMM
    The Effect of Delay Time on Fragmentation Distribution through Small- and Medium-scale Testing and Analysis

    By O Omidi, P D. Katsabanis

    The effect of delay time on fragmentation has been discussed for a long period but rarely in a satisfactory and unbiased way. Despite the efforts of many researchers, delay selection for fragmentation

    Aug 24, 2015

  • AUSIMM
    Planning, Investigation and Preliminary Design for the Eastern Distributor Tunnels - Sydney

    By Chappel R. A, Fishburn B. R

    The Eastern Distributor Tunnels - the first major road tunnel project in Australia - are the preferred solution to traffic congestion problems, when compared with alternatives, in this inner urban

    Jan 1, 1987

  • AUSIMM
    Coal Mining Methods

    The selection of an appropriate mining method should take into account the geometry of the deposit and its physical properties. Other factors which assist in the determination are the requirements

    Jan 1, 1997

  • AUSIMM
    Automatic Contouring of Geological Data

    This paper presents a review of computer techniques for the automatic contouring of geological and geophysical data with output as interactive display on graph plotters or graphics terminals and p

    Jan 1, 1977

  • AUSIMM
    Discontinuity Analysis in Open Cut Exposures - Examples from Selected Central Victorian Sites

    By Fowler T. J

    Examples are provided of discontinuity analysis at selected sites in central Victoria. Discontinuities are rock fractures of low tensile strength, including bedding, foliations and joints, which are

    Jan 1, 1997

  • AUSIMM
    The irrefutable value of introducing a dynamic transport term into mill modelling

    By D K. Weatherley, A N. Mainza, I Govender, L M. Tavares, M S. Powell

    It is understood that rocks do not instantaneously transport along a grinding mill and are consequently not perfectly mixed, but this is conveniently overlooked in mill modelling. A lack of understand

    Aug 24, 2022

  • AUSIMM
    The Lows and Highs of Dense Medium Separation

    The paper describes the reasons for developing, specifically in South Africa, dense medium processes to allow baths to operate at low (about 1,35) and high (about 2,0) cut points. Low density proc

    Jan 1, 1987

  • AUSIMM
    Contrasting Styles of Mineralisation from the Western Arm and Bridge Creek Deposits and their Relevance to Regional Exploration in the Pine Creek Geosyncline, Northern Territory

    By Cooper W. C, Stokes M. A

    Proterozoic gold deposits in the Pine Creek Geosyncline are at present receiving renewed attention with the opening of old mines and several new discoveries. This important polymetallic province co

    Jan 1, 1994

  • AUSIMM
    Computer Methods for Mine Geology at Hellyer

    By Kuipers A. J

    Aberfoyle has been applying computer methods to mine geology in small to medium-sized underground mines since the early 1980's. Recently, the installation of DATAMINE software at the Hellyer Mine

    Jan 1, 1990

  • AUSIMM
    Investigation in the Blast Furnace and Forehearth at E.R. & S.

    By Lightfoot BW, Wand PD, Towne DV

    Sampling and e.m.f. probes were used in the liquid flow from the blast furnace and in the forehearth to evaluate the performance of the copper smelting system at E.R. & S. Significant variations i

    Jan 1, 1981