Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Inadequate Water Management Planning Resulting in Long-term Closure Liabilities

    By H J. J Boshoff

    Mine closure planning integrated into life-of-mine (LOM) planning during the operational phase consists of many subcategories. One of these subcategories that needs to be fully integrated into the LOM

    Jul 16, 2014

  • AUSIMM
    Learnings from review of drawpoint management across New South Wales mines

    By X Hill

    Throughout the 2016/2017 financial year, the NSW Resources Regulator conducted an assessment of each underground metalliferous operation across the state to assess how each operation managed the princ

    Oct 16, 2017

  • AUSIMM
    Water treatment in perpetuity – or not?

    By R J. Higgins, M Edraki

    What is the meaning of the Life of a Mine (LOM) if that mine results in a requirement for water treatment in perpetuity? ‘In perpetuity’ is of course a duration with no relationship to a Life-of-Mine

    Jul 25, 2018

  • AUSIMM
    Developing the West Pilbara Iron Ore Project

    By K Watters

    API Management Pty Ltd (API) is currently developing the West Pilbara Iron Project (the ‘Project’). The Project is a substantial greenfi elds mining and infrastructure development proposed for the wes

    Jul 11, 2011

  • AUSIMM
    Real time assessment of water content in icy regolith by analysing drilling parameters

    By D Joshi, J Rostami, M Karakus, A Eustes

    The first target of mining activities on the surface of the moon is to find and extract water from the icy regolith on the moon. A test drilling unit was designed and fabricated under a NASA Early Sta

    Sep 1, 2024

  • AUSIMM
    Underground mining subsidence in mine planning and risk assessment for cave mining

    By P M. Cepuritis

    In hard rock mining, large-scale bulk mining methods such as block or panel caving (BC/PC) and sublevel caving (SLC) typically generate significant surface deformations such as subsidence. Surface def

    Nov 29, 2022

  • AUSIMM
    Building better bow-ties – common pitfalls in risk analysis

    By B Beale

    Bow-tie analysis is a commonly used tool to identify and display risks that have the potential for an undesired hazardous event. The output of the analysis are bow-tie diagrams, which are an effective

    Apr 16, 2024

  • AUSIMM
    Geology of the Izok Massive Sulphide Deposits, Northwest Territories, Canada

    By Balint F

    The Izok massive sulphide deposits are located in the Northwest Territories of the remote western Canadian Arctic. Together they represent one of the highest grade undeveloped zinc-copper resources

    Jan 1, 1993

  • AUSIMM
    Control Methods in the Treatment of Beach Sand Minerals

    By Glenn R. J

    Treatment processes are outlined for the recovery of rutile and zircon from the heavy mineral-bearing sands on the east coast of Australia. With the exhaustion of the higher grade deposits and the imp

    Jan 1, 1960

  • AUSIMM
    The Biokinetic Test as a Geometallurgical Indicator for Acid Rock Drainage Potentials

    By A K. B Opitz, M Becker, J L. Broadhurst

    "One of the key drivers of geometallurgy is to define the ore characteristics and their variability to build a geometallurgical model. The inclusion of waste rock properties and their variability is j

    Jun 15, 2016

  • AUSIMM
    Reclaimed Lignite Mining Areas A73 in Lusatia - Development of Soil Physical Parameters of an Agricultural Site within the First Years after Site Reconstruction

    By J Krnmmelbein, T Raab

    In Lusatia, lignite mining causes major disturbances on the landscape scale. Reclamation procedures are applied to recover the reconstructed landscape for different land use options. In this study we

    Jul 10, 2012

  • AUSIMM
    Erosion Driven Isostatic Flexure: A Structural Model for Gold Mineralisation in the Otago Schist, New Zealand.

    By Sibson RH

    The gold province of Otago occupies an area of upwarped basement, the Otago Schist, comprising predominantly quartzofeldspathic and volcanogenic metasediments. This assemblage is the product of colli

    Jan 1, 1995

  • AUSIMM
    The Discovery and Exploration of the Wild Dog Gold-Silver-Copper Deposit, East New Britain, P.N.G.

    The Wild Dog gold-silver-copper deposit represents a new ore-deposit type in Papua New Guinea. The telluride vein mineralisation is associated with a Tertiary caldera and has similarities with tha

    Jan 1, 1987

  • AUSIMM
    The Influence of the Quality of Ferrosilicon on the Rheology of Dense Medium and the Ability to Reach Higher Densities

    The beneficiation of heavy metal oxides, such as iron ore, is usually performed with heavy medium separation in cyclones, static baths and lately with Larcodems. Atomized ferrosilicon is most suitable

    Jan 1, 2002

  • AUSIMM
    Dynamic influences of optimisation on emissions

    By P J. Bangerter, J Pan

    Optimising for Net Present Value (NPV) with a strategic optimiser such as COMET, Prober-E, Blaser or Minemax has hitherto lacked a dynamic method for analysing the so-called third-order outcomes (such

    Aug 2, 2023

  • AUSIMM
    Recycling Galvanised Steel: Operating Experience and Benefits

    By Daniels E. J, Morgan W. A

    In response to the increase in consumption of galvanised steel for automobiles in the last decade and the problems associated with remelting larger quantities of galvanised steel scrap, a process is

    Jan 1, 1993

  • AUSIMM
    Geotechnical Reporting at Olympic Dam Mine

    The need for formalised geotechnical reporting has not been fully explored at many operations. With the continuing need to provide safer and more efficient workplaces, the requirement for good geotech

    Jan 1, 2004

  • AUSIMM
    Benchmarking Comminution Energy Consumption for Improved Efficiency

    By G R. Ballantyne, M S. Powell

    A comprehensive Australia-wide survey of comminution energy consumption at copper and gold mines was presented by the authors at the 11th AusIMM Mill Operators’ Conference 2012. The database has been

    Sep 1, 2014

  • AUSIMM
    The Refurbishment of the Terrace and Mt Victoria Tunnels, Wellington, New Zealand

    By T J. McGavin

    This paper examines the fire life systems implemented in two existing tunnels and discusses whether the standards used were appropriate. It focuses on the Terrace Tunnel as this upgrade and refurbishm

    Sep 17, 2014

  • AUSIMM
    Projection of Ecological Restoration of Acid Mine Waste Rock of Shuilong Mountain at Dexing Copper Mine

    By L B. Zhou, Q Wang

    The present discussion focuses on the developmental directions of eco-restoration of acid mine waste rock dump, by using acid mine waste rock of Shuilong Mountain as an example. Based on the analysis

    Jul 10, 2012