Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Development Options for the Eyre Peninsula Magnetite – An Owner’s Perspective

    By J White

    The Eyre Peninsula (EP) has been known for its iron ore for more than a century. Edward John Eyre noted the ironstone outcrop at what is now Iron Knob in the 19th century. Sir Douglas Mawson visited a

    Jul 11, 2011

  • AUSIMM
    A New Method for Rapid Vertical Development of Underground Ventilation Shafts

    By R Markoski, P Grealish

    The requirement for rapid vertical development for underground ventilation is often a factor when dealing with dynamic mine plans, with short vertical developments being used to optimise ventilation s

    Sep 17, 2014

  • AUSIMM
    High-speed Video – An Essential Blasting Tool

    By S Wellink, D Chalmers, D Adermann, C Martin

    The practice of recording blasts for quality control purposes has been conducted for several decades. However, at the low frame rates of a standard video camera, essential data is frequently missed as

    Aug 24, 2015

  • AUSIMM
    Development of rock testing system with changeable stiffness and test research on failure characteristics of rock

    By Y H. Zhu, X X. Tang, Y C. Yin, M L. Xing

    Based on the stiffness theory, the stiffness difference and energy supply of surrounding rocks are important inducing factors for strain burst. However, due to the lack of multi-level low stiffness te

    Nov 29, 2022

  • AUSIMM
    Development and Implementation of Major Hazard Management Plans

    By D Hume

    During 2001 the Ridgeway Gold Mine, driven by company initiatives and recent NSW legislation (General Rule 2000), developed and implemented Major Hazard Management Plans to control significant hazards

    Jan 1, 2002

  • AUSIMM
    Northparkes Mines’ Current Air Blast Risk Assessment Practices for Block Caving Operations

    By C Vejrazka

    Northparkes is located 27 km north of the township of Parkes in central New South Wales, Australia. The operations consist of underground block cave mines and an ore processing plant that produces hig

    May 9, 2016

  • AUSIMM
    Whole of mine planning – Evolution Mount Rawdon case study

    By M L, G Maddocks, A Ferrier, ers, A Forbes

    Evolution’s Mount Rawdon Operation (MRO) produces gold and silver through open pit mining methods. The mining operations are scheduled to be completed in FY24 (Financial Year 2024), after which low-gr

    Aug 2, 2023

  • AUSIMM
    State of Affairs and Current Research Trends in Theory of Sampling Fundamentals, Including Segregation and Correctness

    By D François-Bongarçon

    The theory of sampling (TOS), and therefore representative sampling, is based on three fundamental principles: sample correctness, which handles the search for non-bias; segregation, the effects of wh

    Jul 29, 2014

  • AUSIMM
    Beneficiation of Nickel Laterites for HPAL Processing

    Nickel laterite HPAL circuits are known for their complexity and have presented a large number of challenges to process engineers worldwide. An attitude commonly encountered by the author is that the

    Jan 1, 2008

  • AUSIMM
    Rapid Three-Dimensional Modelling of Mine Geology - Structural Applications to the Globe-Progress Mine, West Coast, New Zealand

    By C McIntosh, M van Dam, N Whetter, R Lane, M McCulloch

    Mine geology is understood through synthesising large amounts of structural, lithological, geochemical and geophysical data derived from the original topographic surface, drilling and surfaces exposed

    Jan 1, 2009

  • AUSIMM
    Building Sustainability Into a Project

    Organisations are starting to develop processes for achieving sustainability principles they have defined for their organisation. The foundation for these principles is now well accepted. The definiti

    Jan 1, 2004

  • AUSIMM
    Wiring for Start-Up Success

    PIP is regularly engaged in businesses where Greenfield Capital Projects are under- delivering on the expected business case. In most of these projects, we can identify that rigorous review has been c

    Jan 1, 2006

  • AUSIMM
    Mine to Tunnel Scale Discontinuum Simulation of Repeated Dynamic Loading of Mine Excavations

    Underground excavations are subjected to complex stress changes caused by nearby mining, but may also be affected by repeated dynamic loading from blasting and seismic events. In some cases, the combi

    Nov 25, 2010

  • AUSIMM
    A Review of European Acid Rock Drainage Initiatives

    By B Dold

    Western Europe is a dynamic region, with an emerging co-operation between the individual nations both politically, economically, technically and scientifically. The European Union, today with 15 membe

    Jan 1, 2003

  • AUSIMM
    Quantitative Mineral Mapping – A Building Block for Geometallurgy at Olympic Dam

    By K Ehrig

    Two irrefutable facts in geology and metallurgy are: ore deposits are comprised of variable mixtures of minerals which are systematically distributed throughout the deposit, and mineralogy exert

    Sep 5, 2011

  • AUSIMM
    Water balance management 101

    By M Rafty, C Lane

    Managing water is a key aspect of mining, whether a site is in water surplus or water deficit. Water in tailings storage facilities (TSFs) needs to be managed carefully to maximise the density of the

    Jul 23, 2018

  • AUSIMM
    A guide to ground disturbance permitting and managing ESG risk

    By H Arvidson, B Spence, S Helm

    Mining is the art of disturbing ground. All phases of a mine’s life cycle from exploration to building and operating a mine, through closure, has a physical impact on the earth. There is currently inc

    Sep 18, 2023

  • AUSIMM
    Seismically Active Mines ù To Buy or Not to Buy

    In recent years there have been many changes in mine ownership due to the on-going rationalisation towards larger mining companies. Larger companies inevitably find it hard to manage small mining oper

    Jan 1, 2002

  • AUSIMM
    How a frontline planning and commitment system improves trust, commitment and results in operations

    By G Britton, P Moynagh

    As more than a few mines gradually sink under the weight of emails, whiteboards, notice boards and ever more complex spreadsheets, the holy grail of effective short-term interval planning and control

    Oct 16, 2017

  • AUSIMM
    Mining for Water - Partnering for Sustainable Water Use in Semi-Arid Regions

    By N Lefebvre, M Jakeman, R Aseervatham

    Semi-arid regions suffer from two afflictions; evaporation may exceed precipitation by multiples of two or more and variations in precipitation can be both extreme and difficult to predict. Many Austr

    Jan 1, 2006