Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Development of the Ernest Henry Underground Mine – The Challenges and the Solutions

    By T Purvis

    Xstrata Copper is extending the Ernest Henry Mine with a 6 Mtpa sub-level cave (SLC) mine being constructed under the pit. The SLC mine will maintain the EHM operation until 2024 after the pit is comp

    Mar 21, 2011

  • AUSIMM
    Sintering for emissions reduction

    By G S. Beros

    In 2019 the Chinese Ministry of Ecology and Environment issued guidelines promoting the implementation of ultra-low emissions in the iron and steelmaking industry. These guidelines aim to drive improv

    Nov 8, 2021

  • AUSIMM
    Pit Backfilling - Managing Chemically Reactive Mine Wastes and Achieving Rehabilitation Objectives

    By A A. Puhalovich

    The placement of chemically reactive mine wastes in mined out pits (æpit backfillingÆ) is increasingly seen by industry as best practice to manage long-term environmental risks. This is primarily beca

    Jul 10, 2012

  • AUSIMM
    Underground Footwall Monitoring at the Sublevel Caving Mine – Kiirunavaara, Sweden

    By M Svartsjaern, D Saiang and K Mäkitaavola

    The Kiirunavaara mine is a large-scale (28 Mt/a) iron ore mine located in northern Sweden. The mine is owned and operated by Luossavaara-Kiirunavaara Aktiebolag (LKAB) using sublevel caving (SLC). The

    May 9, 2016

  • AUSIMM
    Didipio - Learning the Lessons, Adapting and Getting Ready for Production

    By R Redden

    "The Didipio Gold-Copper project in the Philippines has been a well-defined reasonably high gold grade porphyry for almost two decades. OceanaGold are now bringing the project into production in late

    May 24, 2012

  • AUSIMM
    Risk Management and Use of a Geotechnical Baseline Report for a Competitive Alliance Procurement?Process

    By T Ireland, S Eratne, W Newns, P Spies

    The approach to risk management during the procurement of major projects often has a significant outcome on the ultimate delivery of a project. The NZ$1.4 B Waterview Connection project is the largest

    Sep 17, 2014

  • AUSIMM
    The Hishikari Gold Deposit A Case History and Present Status of Exploration

    By Ibaragi K

    High grade ores were intersected in 1981 by a scout drill carried out by the Metal Mining Agency of Japan during a reconnaissance dril ling programme. The original aim of the hole was to explore

    Jan 1, 1987

  • AUSIMM
    Measured and Modelled Response of a Multistory, Urban Structure to High-frequency Blasting Excitation

    By C Dowding, C Aimone-Martin, P Abeel

    This paper presents measurement and analysis of the dynamic response of a five-storey building to very high frequency excitation (>100 Hz) from blasting vibrations originating from a contiguous exc

    Aug 24, 2015

  • AUSIMM
    Tunnelling on Northern Beaches Storage Project, Sydney, to Improve Water Quality

    By N Taylor, P Hewitt

    The Northern Beaches Storage Project (NBSP) is part of Sydney Water’s SewerFix™ Program to improve the wastewater system and protect public health and the environment. It was built by the SewerFix Wet

    Sep 17, 2014

  • AUSIMM
    Compact Bucket Wheel Excavators for the Latrobe Valley

    The lignite mines in the Latrobe Valley of Victoria/Australia have been using continuously operating mining systems for more than 50 years. The relatively small bucket chain dredgers of the early y

    Jan 1, 1989

  • AUSIMM
    Sustainable Development Reporting in the Australian Minerals Processing Industry

    By A Bossilkov

    Although environmental and sustainable development reporting has now become widespread in the Australian mining and minerals processing sector, there remains a great deal of diversity in reporting con

    Jan 1, 2004

  • AUSIMM
    Flow field investigation of high gravity spirals using experimental and CFD techniques

    By R M. Yanamandra, S K. Tripathy, N Mangadoddy, P Sudikondala, P Ankireddy

    Spiral concentrator is one of the most commonly used gravity concentration devices in mineral processing. The particles are classified based on their specific gravity and size. The present work analys

    Aug 24, 2022

  • AUSIMM
    On-Belt Analysis at Sepon Copper Operation

    By T Arena

    To maintain copper recoveries and maximise production at the Sepon Copper Operation it is crucial to control the amount of copper entering the leaching circuit. This requires close control of blending

    Aug 8, 2011

  • AUSIMM
    The Legacy of Underground Coal Mining – Mine Subsidence: Ipswich Coal Measures Case Study

    By B W. Ham

    The legacy of underground coal mining may be a land surface which, in parts, may be unstable in the long term. A case study analysis has been undertaken to explain some of the hazards and how the risk

    Jul 16, 2014

  • AUSIMM
    Modelling and Design of Block Caving at Bingham Canyon

    Open pit mining at Bingham Canyon commenced in 1904 and about two billion tonnes of ore have been extracted since then. There remain just under one billion tonnes of ore in the pit and this will be mi

    Jan 1, 2000

  • AUSIMM
    From Blasthole to Reverse Circulation Sampling – Changing Grade Control Methods at Black Star Open Cut Zinc-Lead Mine, Mount Isa, Queensland

    By B Young

    Variable bench heights, interaction with underground workings and a steeply dipping orebody are challenges faced daily by geologists at Xstrata Zinc’s Black Star Open Cut (BSOC) Zinc/Lead/Silver mine

    Aug 22, 2011

  • AUSIMM
    Responsible Management and Transparent Reporting across the Project Life Cycle

    By M A. Noppé

    "Mining is an inherently risky business: from the technical, environmental, social and economic uncertainties associated with advancing an exploration concept to a viable project; to the risks associa

    Jun 28, 2016

  • AUSIMM
    Continuous Carbon Concentration Measurement at Newmont Boddington Gold

    By C McCamley

    "The requisite for maintaining optimal carbon concentration levels in a carbon-in-leach (CIL) circuit is of paramount importance in the prevention of gold losses. The process’s ability to recover gold

    Oct 10, 2016

  • AUSIMM
    No assumptions, no surprises

    By G Deans, M Longbottom

    OZ Minerals’ Carrapateena mine is one of Australia’s newest ‘greenfield’ mining deposits. It will be a 4.25 Mtpa sub level cave underground operation, with an estimated mine life of 20 years. The inte

    Jul 1, 2021

  • AUSIMM
    The Evolution of Wall Control Programs at Kidston Gold Mines

    By A Marton

    Concerns with crest losses have seen changes to a number of design and operating parameters to retain the integrity of the wall and the berms of the Kidston Gold MinesÆ Eldridge Pit. Until trials bega

    Jan 1, 2001