Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Plant Practice at the New Celebration Gold Mine

    By Martins V, Dunne R

    A re-evaluation of the Hampton Boulder prospect in the early eighties resulted in a decision to proceed with mine development in December 1985. A 500 000 tpa gold treatment plant was commissioned in D

    Jan 1, 1992

  • AUSIMM
    Rwanda and the Africa Mining Vision

    By I H. Wilson

    After decades of turmoil, Rwanda launched its Vision 2020 in 2000 aimed at reconstructing government and addressing poverty. Implementation focused on the agricultural sector, infrastructure and educa

    Jul 16, 2014

  • AUSIMM
    Application of Design by Measurement for Support and Pillar Design in Mechanised Room and Pillar Coal Mining in India

    By I D. Gregson, A Gandhe, A S. Garcia, K M. MacAndrew

    "Falls of ground still cause around one-third of all underground mining fatalities. The recent introduction of mechanised room and pillar working into Indian coalmines is an example of the application

    Nov 5, 2014

  • AUSIMM
    Celestite Ore Upgrading - From Laboratory to Mill

    By Joussemet R, Fabre F

    The paragenesis of the Escuzar Mine (Andalusia-Spain) comprises: ò major constituents: celestite and carbonated minerals (abundant calcite and less frequent strontianite). ò minor constituents: sulph

    Jan 1, 1993

  • AUSIMM
    Acid Rock Drainage Prediction and Waste Rock Segregation Plan for Ankerite-Containing Mine Waste ù Restigouche Mine Case Study

    By R Carreau

    The results of a detailed acid rock drainage (ARD) prediction program were used to revise the waste rock segregation criteria at the Restigouche open pit mine. Waste rock at the site was predominately

    Jan 1, 2003

  • AUSIMM
    Evaluating the opportunities of XRT sorting technology using micro computed tomography and QEMScan

    By P Luo, J E. Danoczi, P Nakutnyy

    Sensor-based sorting methods to remove waste or for upgrading ore prior to downstream metallurgical processing is becoming more prevalent for mining operations. X-ray transmission (XRT) sorters are a

    Nov 10, 2020

  • AUSIMM
    Iron Ore Mine Reconciliation ù A Case Study From Sishen Iron Ore Mine, South Africa

    By R Moller

    Reconciliation at large iron ore operations is a complex and time- consuming process. Often the volume of data and the large range of different stakeholders makes the process almost impossible. Up unt

    Jan 1, 2005

  • AUSIMM
    Avoiding Bias when Using Vezins for Sampling Dusty Materials

    By P Cleary, G K. Robinson, J Hilton, P Wilson

    Concern has been expressed that Vezins can be biased when used for sampling fine materials if the cutter speed is as high as the 0.6 m/s which is often used. Using modelling techniques that consider a

    Aug 21, 2012

  • AUSIMM
    Objective Geological Logging using Geochemical Multi-Element Data - Plutonic Gold Mine, Western Australia

    By M D. Taylor, G Duclaux, K Atkinson, L A. Fisher, A R. Latham, M F. Gazley, S J. de Beer, C M. Tutt

    Geological logging by mine and exploration geologists involves the application of a logging code that requires a geologist to make a subjective decision to classify a particular rock unit. This will m

    Sep 26, 2013

  • AUSIMM
    Cleaner circuit optimisation at Cadia Operations

    By J Seppelt, B Akerstrom, J Bubnich, D Seaman, T Waters

    The Cadia Hill concentrator at Newcrest’s Cadia Operations has undergone several modifications and upgrades to treat an increased throughput rate of harder ore from the Cadia East block cave mine.Subs

    Aug 29, 2018

  • AUSIMM
    Mass Blasting for Mine to Mill ù The AT04 Mass Blast, Kanowna Belle Gold Mine

    By D Kay, M Lovitt

    Mass Blasts are generally required at the completion of longhole stoping cycles to maximise the recovery of ore from a specific orebody. During the course of mining, the practice is to leave pillars o

    Jan 1, 2002

  • AUSIMM
    Repurposing flotation capacity at Mt Keith nickel concentrator

    By L Hussey

    Mt Keith concentrator treats low grade disseminated nickel sulfide ore supplied from the adjoining open pit mine. It is a traditional crushing, two-staged closed circuit grinding circuit (SAG & Ba

    Sep 11, 2017

  • AUSIMM
    Post Closure Management of the Mt Leyshon Gold Mine - Water the Integrator

    By T Baumgartl, D Mulligan, R Haymont

    Mining at the Mt Leyshon Gold Mine in semi-arid north Queensland stopped in 2002. Newmont Australia has recently initiated a thorough post-closure water management study of the site by revisiting the

    Jan 1, 2006

  • AUSIMM
    Experience with Capping of Tailings Storage Facilities for Decommissioning Projects in Australia

    By W Ludlow, C Harrington

    This paper presents an overview of the design and construction challenges to implement capping systems on Tailings Storage Facility’s (TSF) based on recent projects in Australia. Key aspects discussed

    Jul 23, 2018

  • AUSIMM
    Effects of pulp chemistry on plant and laboratory flotation modelling

    By A L. Randriamanjatosoa, G Small, C Greet

    In flotation simulation models, the effects of pulp chemistry other than pH are often ignored and reduced to particles hydrophobicity or contact angle, neither of which can be measured readily in real

    Aug 29, 2018

  • AUSIMM
    Comparison of Empirical Fragmentation Models at the Gol-Gohar Iron Ore Mine

    By M Jahani, M Taji

    For suitable production planning in an open pit mine, and also to carry out the optimisation process during the mining production cycle, prediction of fragment size distribution is required prior to c

    Aug 24, 2015

  • AUSIMM
    KEYNOTE: Upgrades, Modernisations and Expansions Where Will the Expertise, Capability and Skills Come from in the Future?

    By J King, T Hunter, R Coleman

    "The industry that supports operations and new projects is suffering a rapid decline in the currently severely curtailed capital investment environment. This is evidenced by a decline in the number of

    Oct 10, 2016

  • AUSIMM
    Utilising Statistics and Geostatistics to Validate, Characterise and Improve Geological Domaining ù A Case Study From BHP BillitonÆs Yandi Channel Iron Deposit

    BHP BillitonÆs Yandi channel iron deposit has a large resource of approximately 1.3 billion tonnes. This is a bulk mining operation with a high degree of selectivity not being practical. In contrast t

    Jan 1, 2005

  • AUSIMM
    Secondary Ventilation as a Value Proposition – A Case Study

    By A Golsby

    Both primary and secondary ventilation is important in underground mining. Secondary ventilation refers to the provision of ventilation to development ends, stopes and services facilities, which const

    Aug 31, 2015

  • AUSIMM
    Reassessment of Controls on the Gold Mineralisation in the Nyankanga Deposit – Geita Gold Mines, North-Western Tanzania Mineralisation in the Nyankanga Deposit – Geita Gold Mines, North-Western Tanzania

    By M J. Nugus

    The Geita gold mines in north-western Tanzania have produced 5 Moz of gold from an estimated endowment of 15 Moz. They are generally classified as typical Archaean orogenic banded iron formations (BIF

    Aug 22, 2011