Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Modified ground support with alternative fill material for ground control at Munsar underground manganese mine of MOIL Limited, India

    By M Chaudhari, G Manekar, D Shome

    MOIL Limited is operating 7 underground and 3 opencast mines in central India and producing annually more than 1.2 million tonnes of various grades of manganese ore. The underground mines are operatin

    Nov 30, 2018

  • AUSIMM
    Considerations on Quality Assurance/Quality Control and Sample Security

    By G Gosson

    An important requirement in every geological quality control program is that the identity and grades of the control samples (duplicates, certified reference materials (CRMs), and blanks) must remain æ

    Jan 1, 2008

  • AUSIMM
    The Directional Drill Monitor for Long Hole Gas Drainage in Coal Mines

    The Directional Drill Monitor (DDM) is an advanced instrument for real time in hole surveying. It was developed by Du Pont (Australia) to suit Australian gassy coal mining conditions. The instrumen

    Jan 1, 1992

  • AUSIMM
    Exploration and Geology of the Goodall Gold Mine

    By D R Quick

    The Goodall gold mine is located 30 km east of Adelaide River, within the Pine Creek 1:250 000 map sheet, at 8 525 000 mN: 750 000 mE, on the AMG grid. The first gold was poured in April 1988 and th

    Jan 1, 1994

  • AUSIMM
    The Exploration Signature of the Coronation Hill Gold, Palladium and Platinum Deposit

    By C A Heinrich, Morse M. P, Cruickshank B. I, Pyke J. G, Whitaker A

    Very little public domain information is available on the exploration signature of the Coronation Hill Au+Pd+Pt deposit. From 1987 to 1990 the BMR (now AGSO) carried out geological, geophysical and

    Jan 1, 1994

  • AUSIMM
    Bench Stoping at Mount Isa Mines Limited Isa Lead Mine - Mount Isa, Queensland

    By J Robinson, D Herbert

    Bench stoping operations at the Isa Lead mine have been underway for over 11 years. They were implemented to address safety, productivity and mining cost concerns noted with cut and fill mining operat

    Jan 1, 1998

  • AUSIMM
    Optimisation Challenges in Underground Mine Planning and Design

    Underground mine planning is characterised by a series of designs, starting with prefeasibility and culminating in operational. Information on the mineralisation and geotechnical conditions is availab

    Dec 6, 2010

  • AUSIMM
    Lead-zinc-silver Ore Concentration Practice at the Lead/Zinc Concentrator, Mount Isa Mines Limited, Mount Isa, Queensland

    The LeadtZinc Concentrator at Mount lsa treats all the lead-zinc-silver ore from the Mount Isa Mine and some of the ore from the Hilton Mine. This concentrator was commissioned in June 1966 and total

    Jan 1, 1993

  • AUSIMM
    How Leaky are Oceanic Ridge Axes? A New Assessment of the Spatial Density of Submarine Hydrothermal Discharge

    By E T. Baker, J A. Resing, S L. Walker, V Ferrini, F Martinez, R Haymon

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Enumerating active sea floor hydrothermal sites has been a challenge since their discovery

    Mar 18, 2015

  • AUSIMM
    Maghemite - A Source of Heavy Medium for Coal Washeries

    Maghemite - A Source of Heavy Medium for Coal Washeries Use of magnetite as heavy medium in coal preparation plants has been increasing steadily in recent years. It might be in short supply in some a

    Sep 13, 2010

  • AUSIMM
    Update on Precious Metals in Deep Geothermal Waters of the Taupo Volcanic Zone (TVZ)

    By K L. Brown

    Sampling and analyses of deep waters from Wairakei and Rotokawa geothermal systems indicate a wide range of precious metal concentrations (<0.1 to 23 ppb Au; 6 to 2400 ppb Ag), suggesting that east

    Jan 1, 2006

  • AUSIMM
    Smelting of different hydrogen-reduced bauxite residue-calcite pellets for iron and alumina recovery

    By J Safarian, M K. Kar

    Bauxite residue is one of the most important by-products from the alumina industry with no commercial use till now. The utilisation of bauxite residue through pelletising with different lime additions

    Jun 19, 2024

  • AUSIMM
    Real-Time Simulation in Process Engineering - Dream or Reality?

    Computation is believed to be a powerful tool in scaling-up chemical processes and in designing materials, however, is being challenged by low predictability and limited scalability. This presentation

    Sep 13, 2010

  • AUSIMM
    Flotation of Lithium and Beryllium Pegmatites

    By Moskovits EE

    Spodumene was recovered from pegmatite by flota.ticn in lAoretory tests and ;pilot-plant, operation using an anionic collector e1 ulsi3.n. i sir_tilar process applied to beryl pegmatite g^.ve encourag

    Jan 1, 1963

  • AUSIMM
    Reduction and melting behaviours of carbon – iron oxide composite using iron carbides and free carbon obtained by vapour deposition

    By R Higashi, D Maruoka, T Murakami, Y Iwami

    The ironmaking industry consumes a large amount of fossil fuel derived carbon as heat source, reducing agent of iron ores and carburising agent of reduced iron. Although the demand for drastic decreas

    Jun 19, 2024

  • AUSIMM
    A Gauge for the Discrimination of Overburden and Sediments from Low Ash Coal

    By Brockway DJ, Holmes RJ

    A natural gamma-ray gauge has been devel- oped for discriminating overburden and inter- seam sediment from low ash coal located on a moving conveyor belt. It is based on the difference in natural ra

    Jan 1, 1987

  • AUSIMM
    A short review – hydrogen reduction of copper-containing resources

    By M I. Pownceby, M A. Rhamdhani, D M. Fellicia, S Palanisamy, R Z. Mukhlis

    The trend of global copper production has prospectively increased over time. Based on typical mined ore grades, 1 t of copper ore generates approximately 6–10 kg of copper, which requires much energy,

    Jun 19, 2024

  • AUSIMM
    Quantifying the effect of climate and surface materials on post-mining landscape erosion – a risk approach using landscape evolution models

    By D C. Verdon-Kidd, G R. Hancock, M J. Saynor, J B. C Lowry, T J. Coulthard

    Designing post-mining landscapes requires quantifying the short and long-term risks. In recent years, computer based landscape evolution models (LEMs) have been used to provide insight into both erosi

    Jul 25, 2018

  • AUSIMM
    The Use of Roadheading Machines in the Construction of the Liverpool Link Line

    By Parkes DB

    The excavation of sandstone of generally medium strength for the Liverpool Link Line by Dosco Mark 2A Roadheaders has demonstrated the versatility and good performance of road- headers in suitable

    Jan 1, 1976

  • AUSIMM
    Tunnelling in Archaean Rocks of the Darling Range, Western Australia

    The excavation of sandstone of generally medium strength for the Liverpool Link Line by Dosco Mark 2A Roadheaders has demonstrated the versatility and good performance of road- headers in suitable

    Jan 1, 1976