Water is always on the critical path from first permit to final closure - ME Feature Article
- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 8
- File Size:
- 8324 KB
- Publication Date:
- Jul 1, 2026
Abstract
In many mine development schedules
the critical path is generally defined by ore
definition, permitting, infrastructure design,
equipment procurement and initial production.
While permitting is recognized as a schedule
driver, water-related baseline characterization
and permitting are often underestimated within
that process. When addressed explicitly, they can
be reduced to a single line item scheduled to
conclude shortly before operations begin, rather
than treated as the long-lead dependency they
often become in practice.
That assumption has delayed projects,
inflated capital costs and in some cases stopped
development entirely. Water-related permitting
is not a discrete step. It is a sequential, datadependent
regulatory process that begins with
baseline characterization, proceeds through
multiple layers of agency review and often across
multiple overlapping state and federal regulatory
pathways.
This article examines the disconnect
between how mine development critical paths
are typically defined and
the influence water-related
decisions ultimately have on
schedule, capital and longterm
liability. The evidence
comes from two case studies:
an ISR uranium project in
Wyoming navigating a threetrack
permitting process, and an abandoned copper mine in California
where water liability is still being resolved years
after operations ceased. Together, they illustrate
a consistent principle: water is always on the
critical path. The teams that manage it well
simply start earlier.
Citation
APA: (2026) Water is always on the critical path from first permit to final closure - ME Feature Article
MLA: Water is always on the critical path from first permit to final closure - ME Feature Article. Society for Mining, Metallurgy & Exploration, 2026.