Tunneling Through Karstic Terrain

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 10
- File Size:
- 2107 KB
- Publication Date:
- Jan 1, 2003
Abstract
When tunneling through karstic terrain, diverse and complex karst structures are to be expected. By means of drilling ahead of the face using drill jumbos, these structures can be detected to such a degree that by applying proper support measures both open karst cavities and karst holes surrounded by boulders embedded in soft rock can be mastered without causing any break-outs. Support measures such as spiles ahead of excavation, sealing off cavities, back?lling with sand, etc. have to be planned schematically and adapted to the dimensions and formations of the karst structures on site. An essential requirement for a smooth excavation procedure is the availablility of all necessary tunneling equipment for excavation by drill and blast as well as for excavation of soil, with experienced tunnel engineers being in charge of any adaptions on site.
Citation
APA:
(2003) Tunneling Through Karstic TerrainMLA: Tunneling Through Karstic Terrain. Society for Mining, Metallurgy & Exploration, 2003.