Productivity improvement in mechanized cut-and-fill mining at Trout Lake Mine

- Organization:
- Canadian Institute of Mining, Metallurgy and Petroleum
- Pages:
- 4
- File Size:
- 3017 KB
- Publication Date:
- Jan 1, 1988
Abstract
"IntroductionTrout Lake Mine is located about 5 km north of the Hudson Bay Mining and Smelting Co., Limited complex at Flin Flon, Manitoba. The mine was brought into production in 1982at the onset of a severe recession in the base metal market. The mine is operated as a joint venture with HBM&S, MMR and SMS.During the first several months of operation it became evident that there were opportunities to reduce costs at the mine significantly, and a productivity improvement subcommittee was formed to make recommendations. The first committee met in January, 1983 and consisted of the mine manager from Hudson Bay Mining, a geological expert and a maintenance expert from Outokumpu Oy, Finland, and a mine manager from Granges, Sweden.Recommendations from this committee were implemented during 1983 and a new subcommittee was constituted in 1984 to continue the work begun the previous year. The committee remains as constituted in 1984 and meets quarterly.The committee consists of M.A . Kirby , manager - Flin Flon Mines, HBM&S; Gustav Hoberstorfer of Mindelco , a Swedish mining consultant retained by Granges; Eero Laatio, mine superintendent of Keretti Mine at Outokumpu Oy in Finland; and Bob Bray, a mining consultant retained by Manitoba Mineral Resources.Many productivity improvements made in the operation are attributed to the work of this committee and other experts retained at various times throughout the mine life."
Citation
APA:
(1988) Productivity improvement in mechanized cut-and-fill mining at Trout Lake MineMLA: Productivity improvement in mechanized cut-and-fill mining at Trout Lake Mine. Canadian Institute of Mining, Metallurgy and Petroleum, 1988.