OFR-3(2)-80 The Development of A Cross-Pit Overburden Handling System - Volume II - Appendix
    
    - Organization:
 - The National Institute for Occupational Safety and Health (NIOSH)
 - Pages:
 - 128
 - File Size:
 - 31650 KB
 - Publication Date:
 - Jan 1, 1976
 
Abstract
This report describes the engineering feasibility and economic advantages of using a mobile bridge-type cross-pit belt conveyor system in conjunction with a large dragline to excavate and transport spoils in a typical Western surface coal mine. The studies show that such a system could be built to survive operational and climatic mining conditions, and that its implementation would offer a reduction in both acquisition and operating costs versus conventional mining units of comparable rapacity. Reclamation costs can also be significantly reduced, and the total reclamation process accelerated, making the cross-pit conveyor system attractive to mine Owners and environmentalists alike.
Citation
APA: (1976) OFR-3(2)-80 The Development of A Cross-Pit Overburden Handling System - Volume II - Appendix
MLA: OFR-3(2)-80 The Development of A Cross-Pit Overburden Handling System - Volume II - Appendix. The National Institute for Occupational Safety and Health (NIOSH), 1976.