Mass Blasting at Elura Mine

The Australasian Institute of Mining and Metallurgy
G Kennewell
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
8
File Size:
295 KB
Publication Date:
Jan 1, 1999

Abstract

At 11 am Monday 8 September 1997, the successful detonation of the 5/9 Mass Blast at Pasminco - Elura was signified by the subsiding of æMt KevinÆ (a 15 m high earth fill mound). The blast was in response to earlier mine subsidence, which holed through to the surface affecting future stability of underground workings. The blast was a first for Elura which fires small tonnages regularly to avoid rapid oxidation of the ore. This paper discusses the strategy and the considerable planning that went into EluraÆs first blast of this magnitude in order to succeed first time round.
Citation

APA: G Kennewell  (1999)  Mass Blasting at Elura Mine

MLA: G Kennewell Mass Blasting at Elura Mine. The Australasian Institute of Mining and Metallurgy, 1999.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account