CSO Control At Detroit?s Upper Rouge Tunnel

Society for Mining, Metallurgy & Exploration
Wern-ping Chen
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
5
File Size:
861 KB
Publication Date:
Jan 1, 2007

Abstract

To mitigate and control the combined sewer over-flows from 17 outfalls in Detroit, MI, three outfalls in Dearborn Heights, MI and eight outfalls in Redford Township MI, the Detroit Water and Sewerage Department (DWSD) completed the preliminary design of a storage tunnel in 2005. In 2006, a final design revised the alignments and the inside diameter (ID) of the tunnel. The revised tunnel system includes an 11.28-km (7-mile) 9.14-m (30-ft) ID tunnel, a 24.4-m (80-ft) ID pump station, two work shafts about 15.2-m (50-ft) ID each and 14 drop shafts with various IDs. A small portion of combined sanitary and storm sewers serve the majority of the Rouge Valley water-shed. This includes Detroit, MI and most of the western suburbs. The Northwest Interceptor (NWI), that extends between Eight Mile Road and Ford Road and roughly parallel to the Rouge River, intercepts sanitary sewage and some wet weather flows from trunk sewers in the tributary areas for transport to the wastewater treatment plant (WWTP) for treatment. During extreme storm events, when the capacity of the NWI is exceeded, the excess combined sewer and overflow (CSO) over-flows into the Rouge River through 17 outfalls to local rivers. The purpose of the Upper Rouge Tunnel system (URT) is to capture and significantly reduce the uncontrolled CSO from these 17 outfalls in Detroit, three outfalls in Dearborn Heights and eight outfalls in Redford Township. When implemented, the
Citation

APA: Wern-ping Chen  (2007)  CSO Control At Detroit?s Upper Rouge Tunnel

MLA: Wern-ping Chen CSO Control At Detroit?s Upper Rouge Tunnel. Society for Mining, Metallurgy & Exploration, 2007.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account