Computer-Based Simulation of the Construction Process in the Anode Baking Furnaces

Canadian Institute of Mining, Metallurgy and Petroleum
C. Gaubert G. Bourassa
Organization:
Canadian Institute of Mining, Metallurgy and Petroleum
Pages:
8
File Size:
547 KB
Publication Date:
Jan 1, 2006

Abstract

"The construction or rebuild process in the anode baking furnaces has been modeled with the software Rockwell Arena, in order to minimize the process cost and risk. The case study was focused on the sectional rebuild (""on the fly"") that needs a high coordination of the material inventory, the on-site personnel and the construction/production schedule. Multiple entities and resources were allocated for the different part of the process (in-furnace process, prefabrication, materials transportation, etc.). Logic flow charts and VBA macros were used to simulate the space utilization (including cranes utilization) and interaction with production. MS-Excel output files can show user-friendly results."
Citation

APA: C. Gaubert G. Bourassa  (2006)  Computer-Based Simulation of the Construction Process in the Anode Baking Furnaces

MLA: C. Gaubert G. Bourassa Computer-Based Simulation of the Construction Process in the Anode Baking Furnaces. Canadian Institute of Mining, Metallurgy and Petroleum, 2006.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account