An Expert System of Scheduling a Successive Plan for Mining and Development in Coal Mines

- Organization:
- The Australasian Institute of Mining and Metallurgy
- Pages:
- 4
- File Size:
- 398 KB
- Publication Date:
- Jan 1, 1998
Abstract
Drawing up the successive plan for mining and development is a very important and regular plan work. The expert system of the successive plan for mining and development drawn up by computer is developed on the basis of network, computer simula
Citation
APA:
(1998) An Expert System of Scheduling a Successive Plan for Mining and Development in Coal MinesMLA: An Expert System of Scheduling a Successive Plan for Mining and Development in Coal Mines. The Australasian Institute of Mining and Metallurgy, 1998.