"In conjunction with Banick Mercur , Wright Engineers Limited designed the first multi-stage aqueous pressure oxidation system in an alkaline environment in North America. A three-stage slurry heating and slurry pressure let-down with heat recovery was an innovative approach to the problem of high energy cost with the low sulphur content of the ore. The design of this system required solving a number of problems associated with heating and pumping of slurries at pressures up to 3230 kPa and temperatures in excess of 220°C. Wright received an Award of Merit in October 1989, from the Canadian Consulting Engineering Awards Committee in the Process Category for its design of the Mercur pressure oxidation system.The Mercur Mine is located at the south end of the Oquirrh Mountains in Tooele County about 65 miles by road from Salt Lake City, Utah, U.S.A. The original mill was designed to process 5000 tpd of oxidized gold ore in a carbon-in-leach (CIL) circuit. A new ore treatment system was required to treat the substantial quantities of refractory ore reserves which could not be treated economically in the existing mill. The new pressure oxidation circuit makes the refractory ore amenable to gold recovery by oxidation of the sulphides contained in the ore .Wright Engineers Limited was commissioned by Barrick Mercur Gold Mine Ltd ., a wholly-owned subsidiary of American Barrick Resources, to design the pressure oxidation facility. This followed completion of a feasibility study by Wright which showed that the project was technically and economically viable.Work on the feasibility study began in 1986, detail design commenced in February 1987, and was completed in December 1987. Mechanical installation was completed in January 1988, and slurry feed began in February 1988. The plant has operated since June 1988 without major interruption . Wright was responsible for engineering, procurement and construction management for the addition of the 750 tpd pressure oxidation circuit to the existing mill and also had commissioning responsibility.Major unit processes involved in the pressure oxidation facility are ore thickening, three-stage slurry preheating, pressure oxidation and three-stage slurry cooling with heat recovery, stearn generation, propane and oxygen storage and a video graphic display process control system were included in the scope as process anciliaries.The pressure oxidation increases gold recovery from the refractory ore by conventional CIL from as low as 35% to more than 86070. A patent has been granted for the process."
Citation

APA:  (1989)  Alkaline pressure oxidation at Barrick Mercur

MLA: Alkaline pressure oxidation at Barrick Mercur. Canadian Institute of Mining, Metallurgy and Petroleum, 1989.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account